With Reviewed 100% Correct Detailed Answers
Guaranteed Pass!!
Severe wood decay occurs in wood with
20%
a moisture content above
Drill holes in brick veneer need to be
12
spaced no more than inches.
Stage between each molt. instar
Drywood termite pellets are tiny,
oval-shaped capsules with six concave
sides and rounded ends.
Termite metamorphosis is
incomplete
.
Isoptera means sized wings. equal
Untreated support members must be a
6
minimum of inches above soil.
Wood-to-soil clearance in a crawl space
18
must be a minimum of inches.
Application of termiticide to drill holes no
more than inches
18
contiguous to the opposite side of the
vertical wall
Drilling from the top of the entire perime-
ter of the slab at
intervals of no more than inches
12/12
and no more than from the perime-
ter wall and applying the
termiticide.
Drilling, rodding, and applying the ap-
proved termiticide from
the sides of the earth fill along the entire
20
perimeter provided
no horizontal rodding distance shall ex-
ceed feet.
Treating from the inside by drilling
through from the top of the slab and ap-
plying the approved termiticide at inter-
vals of no more than inches and
, Georgia WDO Exam Tested Questions
With Reviewed 100% Correct Detailed Answers
Guaranteed Pass!!
no more than inches from the
outside edge of slab along the entire
perimeter and at all other points of po- 12•12
tential termite entry through the
slab.
When infestation of Wood Decay Fungi is
located in a crawl space, treatment shall
include the installation of a polyethylene
70
or other water impervious vapor barrier
to at least percent of the exposed
soil surface in the enclosed space.
The Georgia Structural Pest Control
7
Commission consists of members.
Sub office can have only employ-
One
ee(s).
All licenses, certifications, employee reg-
istrations, and research fees, shall be
for a period of two (2) years or fraction odd
thereof and shall expire on June 30 in
each numbered year.
Company license costs. $100
Certified license costs
Operator
$100.00
Employee registration costs dol-
10.00
lars.
Duplicate registration costs
Card
10.00
A person who has passed the exami-
nation(s) must apply for and complete
the requirements for certification within
90
days of the date he or she is no-
tified of passing the examination(s), oth-
erwise, reexamination will be required.
10/70
, Georgia WDO Exam Tested Questions
With Reviewed 100% Correct Detailed Answers
Guaranteed Pass!!
hours of classroom training and
hours OJT are required for employ-
ee registration
Registered employees renewals require
CEUs of 8 hours in HPC, 8 hours in WDO 3
or hours in FUM to renew.
The Licensee shall notify the Secretary
of employees involved in the solicitation
or performance of pest control work who 30
fail to become registered within
days of employment.
The Licensee shall notify the Secretary
in writing, within days of any
10
change of address or the opening or
closing of any office.
COs need 25 hours old CE in HPC,
hours in WDO or 12 hours in FUM 25
to renew
creditable recertification training must be
completed at least days prior to
90
the expiration date of the operator certi-
fication.
COs must renew every years 5
Wood Destroying Organisms Con-
trol--means the application of any and
all measures for the purpose of control-
ling , powder post beetles,
Termites
wood boring beetles, wood destroying
fungi and any other wood destroying or-
ganism in structures and/or adjacent out-
side areas.
Every Wood Destroying Organism Con-
trol for treatment which uti-
lizes a bait or baiting system shall con- contract
tain the following statement in at least
one-eighth (1/8) inch letters and blocked