Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

NICET Highway Construction Inspector Level III Practice Exam 1 Questions and Answers Latest Update

Beoordeling
-
Verkocht
-
Pagina's
17
Cijfer
A+
Geüpload op
06-03-2025
Geschreven in
2024/2025

NICET Highway Construction Inspector Level III Practice Exam 1 Questions and Answers Latest Update

Instelling
NICET Highway Construction Inspector Level III
Vak
NICET Highway Construction Inspector Level III

Voorbeeld van de inhoud

NICET Highway Construction Inspector Level III Practice
Exam 1 Questions and Answers Latest Update




Terms in this set (56)


During installation of traffic loops A) Do not allow vehicular traffic over an open saw cut.
in the pavement, which three c) Thoroughly clean the saw cut of foreign material.
statements apply prior to and d) Use a plastic sleeve where loop wire crosses a joint.
During the installation of
loop wire? (Choose 3).


a) Do not allow vehicular traffic
over an open saw cut.
b) Do not overlap saw cuts at the
corner.
c) Thoroughly clean the saw cut of
foreign material.
d) Use a plastic sleeve where loop
wire crosses a joint.

,The contractor is installing a ?
Culvert with a 12-inch reinforced
concrete pipe ( outside diameter
Of 16.50 inches) from Sta 10+00, 40
feet Left to STA 10+00, 65 feet
Right on 4-inch bedding material.
The 12-inch RCP outlet is to be
installed at Sta 10+00, 40 feet Left
at an invert elevation of 652.50.


If the conduit is installed at a 1.40%
slope, what is the elevation of the
foundation grade at Sta 10+00, 45
feet Right?


a) 652.04
b) 653.17
c) 653.36
d) 653.50

On the reservoir side of a dam, B) maximum water elevation
erosion protection against wave
Action should extend up the slope
to at least which level?


a) Crest of dam
b) Maximum water elevation
c) Minimum water elevation
d) Two-thirds the height of the dam

During stage construction while c) Maintain the existing drainage system until the new system is
installing drainage, the contractor functional.
must complete which two of the d) Provide temporary connections as needed to maintain the existing
following tasks? (Choose two). system.


a) Bulk head the pipe until the
system is complete.
b) Complete the entire system
before it rains.
c) Maintain the existing drainage
system until the new system is
functional.
d) Provide temporary connections
as needed to maintain the existing
system.

, After flushing but before D) pressure testing
Connecting a new main to the
existing system, what test does an
inspector need to verify before
Placing the main into service?


a) Bacteriological testing
b) Cover testing
c) Deflection testing
d) Pressure testing

Which three types of inspections b) Interim inspection
Are completed for sign structures? c) Initial inspection
(Choose three). d) Routine inspection


a) Final inspection
b) Interim inspection
c) Initial inspection
d) Routine inspection

How many times per foot should B) 5 turns per foot
loop lead-in wires be twisted?


a) 3 turns per foot
b) 5 turns per foot
c) 6 turns per foot
d) 7 turns per foot

Which phrase is true of test ?
reports required for concrete
sidewalks, asphalt pavement,
Concrete curb, and pipe
culverts for rest areas?


a) 50% required on roadway
contracts
b) Required for federal-aid projects
only
c) Same as roadway contracts
d) Submitted in duplicate

According to FP-14, when D) 36 inches
removing existing concrete
Structure in the roadbed, how
many inches below the subgrade
elevation should the existing
Structure be removed to?


a) 12 inches
b) 24 inches
c) 30 inches
d) 36 inches

Geschreven voor

Instelling
NICET Highway Construction Inspector Level III
Vak
NICET Highway Construction Inspector Level III

Documentinformatie

Geüpload op
6 maart 2025
Aantal pagina's
17
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Boffin Harvard University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1838
Lid sinds
4 jaar
Aantal volgers
1469
Documenten
7148
Laatst verkocht
3 uur geleden
Pilot Study

Prevent resits and get higher grades.

3.8

454 beoordelingen

5
221
4
76
3
75
2
16
1
66

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen