CMRP Exam Preparation QUESTIONS
WITH SOLVED SOLUTIONS
Which one of the following is generally true - ANSWER>>Reliability Centered
Maintenance can be applied on capital projects in the pre-construction stage to
determine the maintenance plan
What are the three most significant constraints when developing a Maintenance
and Reliability organization? - ANSWER>>culture, people, resources.
Weibull (life data) analysis is primarily used for... - ANSWER>>Probability of failure
determination
A large manufacturing company installed some asset monitoring device on some
large motors that were deemed critical equipment. The monitoring devices
provide engineering with vibration data, acoustic data as well as operational
performance data. What asset management strategy has the company selected
for the motors? - ANSWER>>CBM / PDM (Conditioned Based Maintenance /
Predictive Maintenance)
If a Machine is run for 500 hours and 5 failures are observed during this period,
what is the Mean Time Between Failure? - ANSWER>>500/5 = 100 hours
Which of the following most effectively makes up the members of a
Manufacturing Team? - ANSWER>>Production / Maintenance / Supplier /
Engineering
A skill audit is undertaken to ... - ANSWER>>Help an organization understand skills
it requires
, Of the following, what is the best method of measuring employee skills and
training? - ANSWER>>Maintaining a skills inventory and tracking database
When training maintenance workers, it is best to first... - ANSWER>>List all the
tasks the workers need to perform
What relationship should Maintenance and Reliability Teams have with customers
and suppliers for optimum effectiveness? - ANSWER>>Team members should be
involved in communicating with customers and suppliers
Return on Asset (ROA) is determined by... - ANSWER>>Revenue/Total Assets
As a maintenance manager at a new plant (facility) you are developing the
maintenance workforce strategy for start-up. Select the best workforce attributes
for maximum effectiveness, assuming that unit labor cost are equal. -
ANSWER>>Operation performing minor maintenance and company multi-skilled
technicians performing complex maintenance tasks.
Which of the following are leading tools or techniques to identify Maintenance
and Reliability process improvements? - ANSWER>>Total Productive
Maintenance, Reliability Centered Maintenance & Process bench-marking with
industry leaders.
For the oil and pressurized lubrication system, oil samples for analysis and
trending should be taken from... - ANSWER>>The oil sump, at a point above the
bottom to assure that the sample does not include wear particles, water and
other contaminants that may have settled out of the oil.
The "Karl Fischer Method" measures - ANSWER>>The amount of water in a
sample of oil in ppm.
When developing and presenting a new strategic plan to stakeholders, which of
the following is the most important? - ANSWER>>Gain the trust of stakeholders
WITH SOLVED SOLUTIONS
Which one of the following is generally true - ANSWER>>Reliability Centered
Maintenance can be applied on capital projects in the pre-construction stage to
determine the maintenance plan
What are the three most significant constraints when developing a Maintenance
and Reliability organization? - ANSWER>>culture, people, resources.
Weibull (life data) analysis is primarily used for... - ANSWER>>Probability of failure
determination
A large manufacturing company installed some asset monitoring device on some
large motors that were deemed critical equipment. The monitoring devices
provide engineering with vibration data, acoustic data as well as operational
performance data. What asset management strategy has the company selected
for the motors? - ANSWER>>CBM / PDM (Conditioned Based Maintenance /
Predictive Maintenance)
If a Machine is run for 500 hours and 5 failures are observed during this period,
what is the Mean Time Between Failure? - ANSWER>>500/5 = 100 hours
Which of the following most effectively makes up the members of a
Manufacturing Team? - ANSWER>>Production / Maintenance / Supplier /
Engineering
A skill audit is undertaken to ... - ANSWER>>Help an organization understand skills
it requires
, Of the following, what is the best method of measuring employee skills and
training? - ANSWER>>Maintaining a skills inventory and tracking database
When training maintenance workers, it is best to first... - ANSWER>>List all the
tasks the workers need to perform
What relationship should Maintenance and Reliability Teams have with customers
and suppliers for optimum effectiveness? - ANSWER>>Team members should be
involved in communicating with customers and suppliers
Return on Asset (ROA) is determined by... - ANSWER>>Revenue/Total Assets
As a maintenance manager at a new plant (facility) you are developing the
maintenance workforce strategy for start-up. Select the best workforce attributes
for maximum effectiveness, assuming that unit labor cost are equal. -
ANSWER>>Operation performing minor maintenance and company multi-skilled
technicians performing complex maintenance tasks.
Which of the following are leading tools or techniques to identify Maintenance
and Reliability process improvements? - ANSWER>>Total Productive
Maintenance, Reliability Centered Maintenance & Process bench-marking with
industry leaders.
For the oil and pressurized lubrication system, oil samples for analysis and
trending should be taken from... - ANSWER>>The oil sump, at a point above the
bottom to assure that the sample does not include wear particles, water and
other contaminants that may have settled out of the oil.
The "Karl Fischer Method" measures - ANSWER>>The amount of water in a
sample of oil in ppm.
When developing and presenting a new strategic plan to stakeholders, which of
the following is the most important? - ANSWER>>Gain the trust of stakeholders