LEED GA Exam Questions With Solved
Solutions
List out the GBCI exam areas of focus: - ANSWER>>1) Project Site Factors
2) Water Management
3) Project Systems and Energy Impacts
4) Acquisition, Installation, & Management of Project Materials
5) Improvements to the Indoor Environment
6) Stakeholder Involvement in Innovation
7) Project Surroundings and Public Outreach
List out the LEED rating systems credit categories: - ANSWER>>1) Sustainable Sites
2) Water efficiency
3) Energy & Atmosphere
4) Materials & Resources
5) Indoor Environmental Quality
6) Innovation in Design & Regional Priority
Green Bldg can reduce how much Energy Use? - ANSWER>>24%-50%
Green Bldg can reduce how much CO2 Emissions? - ANSWER>>33%-39%
Green Bldg can reduce how much Water Use? - ANSWER>>40%
Green Bldg can reduce how much Solid Waste? - ANSWER>>70%
What do Life-cycle cost analysis look at? - ANSWER>>1) Cost of green bldg
2) Types of advantages discovered when initial investment are made in more
durable products and efficient bldg systems
, During Construction Phases, Predesign is: - ANSWER>>gathering information,
recognizing stakeholder needs, establishing project goals, & selecting site
During Construction Phases, Design is: - ANSWER>>Schematic Design, Design
Development, and Construction Documents
Explain Schematic Design: - ANSWER>>SD explores design options & alternatives
with the intent to establish an agreed-upon project layout & scope of work.
Explain Design Development: - ANSWER>>DD begins the process of spatial
refinement & usually involves the 1st design of a project's energy system.
Explain Construction Documents: - ANSWER>>CD carry the design into the detail
level so that construction can take place.
Construction Phases Bidding is: - ANSWER>>when costs are established and
contracts for construction services are signed.
During Construction Phases, Construction Administration is - ANSWER>>the
actual construction, Commissioning take place near the end of construction, once
the system have been installed and are operable. Includes Substantial
Completion, Final Completion, Certificate of Occupancy, & Occupancy
List out the major Construction Phases: - ANSWER>>Predesign, Design, Bid,
Construction, and Occupancy
Substantial completion is: - ANSWER>>a contractual benchmark that usually
corresponds to the point at which a client could occupy a nearly completed space.
Certificate of occupancy is: - ANSWER>>the official recognition by a local bldg
department that bldg conforms to applicable bldg & safety codes.
Solutions
List out the GBCI exam areas of focus: - ANSWER>>1) Project Site Factors
2) Water Management
3) Project Systems and Energy Impacts
4) Acquisition, Installation, & Management of Project Materials
5) Improvements to the Indoor Environment
6) Stakeholder Involvement in Innovation
7) Project Surroundings and Public Outreach
List out the LEED rating systems credit categories: - ANSWER>>1) Sustainable Sites
2) Water efficiency
3) Energy & Atmosphere
4) Materials & Resources
5) Indoor Environmental Quality
6) Innovation in Design & Regional Priority
Green Bldg can reduce how much Energy Use? - ANSWER>>24%-50%
Green Bldg can reduce how much CO2 Emissions? - ANSWER>>33%-39%
Green Bldg can reduce how much Water Use? - ANSWER>>40%
Green Bldg can reduce how much Solid Waste? - ANSWER>>70%
What do Life-cycle cost analysis look at? - ANSWER>>1) Cost of green bldg
2) Types of advantages discovered when initial investment are made in more
durable products and efficient bldg systems
, During Construction Phases, Predesign is: - ANSWER>>gathering information,
recognizing stakeholder needs, establishing project goals, & selecting site
During Construction Phases, Design is: - ANSWER>>Schematic Design, Design
Development, and Construction Documents
Explain Schematic Design: - ANSWER>>SD explores design options & alternatives
with the intent to establish an agreed-upon project layout & scope of work.
Explain Design Development: - ANSWER>>DD begins the process of spatial
refinement & usually involves the 1st design of a project's energy system.
Explain Construction Documents: - ANSWER>>CD carry the design into the detail
level so that construction can take place.
Construction Phases Bidding is: - ANSWER>>when costs are established and
contracts for construction services are signed.
During Construction Phases, Construction Administration is - ANSWER>>the
actual construction, Commissioning take place near the end of construction, once
the system have been installed and are operable. Includes Substantial
Completion, Final Completion, Certificate of Occupancy, & Occupancy
List out the major Construction Phases: - ANSWER>>Predesign, Design, Bid,
Construction, and Occupancy
Substantial completion is: - ANSWER>>a contractual benchmark that usually
corresponds to the point at which a client could occupy a nearly completed space.
Certificate of occupancy is: - ANSWER>>the official recognition by a local bldg
department that bldg conforms to applicable bldg & safety codes.