Level 3 Certificate MATHEMATICAL STUDIES Paper 2B Critical Path and Risk Analysis 2024

Rating
-
Sold
-
Pages
24
Grade
A+
Uploaded on
10-03-2025
Written in
2024/2025

Level 3 Certificate MATHEMATICAL STUDIES Paper 2B Critical Path and Risk Analysis Wednesday 24 May 2024 Materials Afternoon Time allowed: 1 hour 30 minutes For this paper you must have: l a clean copy of the Preliminary Material and the Formulae Sheet (enclosed) l a scientific calculator or a graphics calculator l a ruler. Instructions lUse black ink or black ball-point pen. Pencil should only be used for drawing. l Fill in the boxes at the top of this page. l Answer all questions. lYou must answer the questions in the spaces provided. Do not write outside the box around each page or on blank pages. l If you need extra space for your answer(s), use the lined pages at the end of this book. Write the question number against your answer(s). lShow all necessary working; otherwise, marks for method may be lost. lDo all rough work in this book. Cross through any work you do not want to be marked. l The final answer to questions should be given to an appropriate degree of accuracy. lYou may not refer to the copy of the Preliminary Material that was available prior to this examination. A clean copy is enclosed for your use. Information l The marks for questions are shown in brackets. l The maximum mark for this paper is 60. lYou may ask for more answer paper or graph paper, which must be tagged securely to this answer booklet. For Examiner’s Use Question 1 2 3 4 5 6 Mark 7 TOTAL (Jun2413502B01) 1350/2B G/TI/Jun24/E4 2 There ar

Show more Read less
Institution
Course

Content preview

Level 3 Certificate MATHEMATICAL STUDIES Paper 2B Critical Path
and Risk Analysis 2024




Please write clearly in block capitals.


Centre number Candidate number


Surname __________________________________________________________________________

Forename(s) __________________________________________________________________________

Candidate signature ________________________________________________________________________
I declare this is my own work.



Level 3 Certificate
MATHEMATICAL STUDIES
Paper 2B Critical Path and Risk Analysis


Wednesday 24 May 2024 Afternoon Time allowed: 1 hour 30 minutes
Materials For Examiner’s Use
For this paper you must have:
l a clean copy of the Preliminary Material and the Formulae Sheet (enclosed) Question Mark
l a scientific calculator or a graphics calculator
l a ruler. 1

2
Instructions
l Use black ink or black ball-point pen. Pencil should only be used for drawing. 3
l Fill in the boxes at the top of this page.
l Answer all questions.
4
l You must answer the questions in the spaces provided. Do not write outside
5
the box around each page or on blank pages.
l 
If you need extra space for your answer(s), use the lined pages at the end of 6
this book. Write the question number against your answer(s).
7
l Show all necessary working; otherwise, marks for method may be lost.
l Do all rough work in this book. Cross through any work you do not want TOTAL
to be marked.
l The final answer to questions should be given to an appropriate degree
of accuracy.
l You may not refer to the copy of the Preliminary Material that was available
prior to this examination. A clean copy is enclosed for your use.

Information
l The marks for questions are shown in brackets.
l The maximum mark for this paper is 60.
l You may ask for more answer paper or graph paper, which must be tagged
securely to this answer booklet.




(Jun2413502B01) 1350/2B
G/TI/Jun24/E4

, 2
Do not write
outside the
There are no questions printed on this page box




DO NOT WRITE ON THIS PAGE
ANSWER IN THE SPACES PROVIDED




(02)
G/Jun24 /1350/2B

, 3
Do not write
outside the
Answer all questions in the spaces provided. box




1 The table shows information about the top four teams in the 2020 Olympic Games.



Number of medals
Number of
competitors
Rank Team Gold Silver Bronze

1 United States 39 41 33 613

2 China 38 32 18 406

3 Japan 27 14 17 556

4 Great Britain 22 20 22 376



1 (a) Work out the ratio of gold medals to bronze medals for the United States.
Circle your answer.
[1 mark]


11 : 13 13 : 11 24 : 11 13 : 24


1 (b) A British newspaper made the following claim.


Great Britain won more medals per competitor than the United States.


Does the data support this claim?
Show working to support your answer.
[3 marks]
_
______________________________________________________________________________________
_
______________________________________________________________________________________
_
______________________________________________________________________________________
_
______________________________________________________________________________________
_
______________________________________________________________________________________
____
_
______________________________________________________________________________________ 4


Turn over U


(03)
G/Jun24 /1350/2B

Written for

Institution
Study
Course
School year
200

Document information

Uploaded on
March 10, 2025
Number of pages
24
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$19.77
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
AQAandGCSE

Get to know the seller

Seller avatar
AQAandGCSE American InterContinental University
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
1 year
Number of followers
0
Documents
5
Last sold
-
TopGradePapers

Get AQA, GCSE, Edexcel, and OCR past papers with official marking schemes to revise smarter and achieve top grades easily.

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions