planning the construction
of a new water treatment
facility. Who would be
responsible for the
design and construction
of the facility?
The job of the architect
________________ is to
work closely with a client
in the aesthetics and
function of a structure.
A realtor is responsible selling and leasing of property
for ________________.
What type of webbed Concept map
graphic organizer is
used to explore, gather,
and share information on
a topic?
Which of the following Window style
tasks would a civil
engineer NOT be
responsible for?
A set of plans from which working drawings
a structure will be built
that includes floor plans,
elevations and building
sections to graphically
convey the design
solution is known
as__________________
____.
, A ________________ is bubble diagram
created during the
preliminary design stage
to determine possible
room locations and
relationships.
Which of the following is Building codes
a local, regional or
national set of conditions
and rules defining and
regulating minimum
conditions for the
construction of buildings
in order to insure that
structures are safe?
Project documentation Zoning maps
from the geotechnical
engineer would include
all of the following
except______________
____.
The following are all Community Public park
Zoning types except
____________________
____.
Which of the following is Viability Analysis
a study that involves an
evaluation of available
utilities, site
characteristics, and
potential users of a new
development?
If a person does not lawful and unethical
break any laws, but does
not follow the accepted
principles of professional
conduct, that person
would be considered