ISA Utility Specialist Exam Questions And Answers In the U.S., enforcement of safety work rules resides with: - Answer-Occupational Safety & Health Administration (OSHA) /.Utility pruning is the pruning of trees located in the vicinity of power lines for the purpose of __________ __________ __________. - Answer-ensuring reliable service /.A comprehensive vegetation management program should be __________ rather than reactive, & based on principals of __________ vegetation management. - Answer-proactive; integrated /.What is a volt? - Answer-a unit of electrical force /.Major storms or __________ weather events are the usual cause of power outages over large areas. - Answer-catastrophic /.Without __________, messages can have multiple meanings. - Answer-context /.ISA BMPs provide a practical guide for implementing __________ __________. - Answer-industry standards /.Electrical resistance determines how much __________ is required to move electricity along a conductor and is measured in __________. - Answer-energy; ohms /.When communicating, a person's experience & __________ will influence how the person reacts. - Answer-perceptions /.Crew mobilization for a storm event is much more rapid from a __________ status. - Answer-standby /.NERC standards are specific to what line voltages? - Answer-200 kV & above /.An important first step in any vegetation management program should be to asses system conditions, which is often done through an __________. - Answer-inventory /.Which type of cuts are less unacceptable? - Answer-internodal cuts (e.g. topping) /.A worker neglecting to wear cut-resistant chaps while operating a chainsaw is committing an unsafe __________, while an employer failing to provide chaps is creating an unsafe __________. - Answer-act; condition /.A conductor carrying more than __________ volts would be considered a NERC line. - Answer-200,000 /.Communication is both verbal & nonverbal. When a customer is confronted with contradictory information, the person will usually believe the __________ message. - Answer-nonverbal /.Voluntary safety standards for pruning, trimming, repairing, maintaining & removing trees, & cutting brush: - Answer-ANSI Z133 /.NERC standards require the reporting of all tree caused outages by __________ categories - Answer-three /.A traditional cycle will schedule maintenance __________ trees grow into conductors. - Answer-before /.Which type of cuts are more acceptable? - Answer-nodal cuts (e.g. drop-crotch, thinning) /.The __________-__________ rule suggests that workers should take time before starting a job to check for potentially unsafe conditions & discuss them. - Answer-two-minute /.According to ANSI Z133, the minimum approach distance for persons other than qualified line-clearance arborists for 50 kV & less is __________. - Answer-10 feet /.Trees growing into contact with a single-phase distribution conductor pose __________ threat of a tree-ground fault. - Answer-little /.Where should the final cut be made for proper utility pruning? - Answer-just outside of the branch bark ridge and the branch collar /.A vegetation management scheduling unit may be an entire __________ or a __________ __________. - Answer-circuit; geographical area /.2 examples of protective equipment: - Answer-circuit breakers lightning receptors /.On a storm site, cutting should not begin until all risks have been assessed & the __________ approach has been decided & adopted. - Answer-safest /.Actively __________ can facilitate understanding a customer's perceptions and demonstrate the utility representative's sincere interest in a customer. - Answer-listening /.As clearance work progresses, __________ between crews & dispatcher is critically important to determine locations of downed or damaged lines. - Answer-communication /.__________ negotiation uses the best aspects from both hard & soft bargaining. - Answer-interest-based /.An energized wire or conductor in a circuit is also known as a __________. - Answer-phase /.Fast-growing, problem species are sometimes known as __________ __________. - Answer-cycle busters /.Flush cuts damage which tissues? - Answer-the trunk /.Clearing for a new distribution line is likely to be paid for by a __________ budget. - Answer-capital /.Surface temperatures at the point of contact with high voltage can reach __________ degrees F. - Answer-1,000 /.__________ __________ occurs when someone touches an energized fixture. __________ __________ can occur when a person touches a conductive object that is in contact with an energized fixture. - Answer-direct contact; indirect contact /.A grid-based scheduling system is most likely to be used by highly __________ utilities. - Answer-urbanized /.Why is utility pruning done? - Answer-to maintain safety and rights-of-way /.Reactive maintenance is often called __________. - Answer-hotspotting /.True or False? Guy wires are intended to help support poles but may become unintentionally energized. - Answer-true /.One of the highest personal risks in a storm is __________. - Answer-fatigue /.When trying to negotiate mutually agreeable solutions & gain commitment based on customer interests, the focus should be on __________, no on specific individuals. - Answer-issues

Show more Read less
Institution
ISA Utility
Course
ISA Utility

Content preview

ISA Utility Specialist Exam Questions And Answers


In the U.S., enforcement of safety work rules resides with: - Answer-Occupational
Safety & Health Administration
(OSHA)

/.Utility pruning is the pruning of trees located in the vicinity of power lines for the
purpose of __________ __________ __________. - Answer-ensuring reliable service

/.A comprehensive vegetation management program should be __________ rather than
reactive, & based on principals of __________ vegetation management. - Answer-
proactive;
integrated

/.What is a volt? - Answer-a unit of electrical force

/.Major storms or __________ weather events are the usual cause of power outages
over large areas. - Answer-catastrophic

/.Without __________, messages can have multiple meanings. - Answer-context

/.ISA BMPs provide a practical guide for implementing __________ __________. -
Answer-industry standards

/.Electrical resistance determines how much __________ is required to move electricity
along a conductor and is measured in __________. - Answer-energy;
ohms

/.When communicating, a person's experience & __________ will influence how the
person reacts. - Answer-perceptions

/.Crew mobilization for a storm event is much more rapid from a __________ status. -
Answer-standby

/.NERC standards are specific to what line voltages? - Answer-200 kV & above

/.An important first step in any vegetation management program should be to asses
system conditions, which is often done through an __________. - Answer-inventory

/.Which type of cuts are less unacceptable? - Answer-internodal cuts
(e.g. topping)

,/.A worker neglecting to wear cut-resistant chaps while operating a chainsaw is
committing an unsafe __________, while an employer failing to provide chaps is
creating an unsafe __________. - Answer-act;
condition

/.A conductor carrying more than __________ volts would be considered a NERC line. -
Answer-200,000

/.Communication is both verbal & nonverbal. When a customer is confronted with
contradictory information, the person will usually believe the __________ message. -
Answer-nonverbal

/.Voluntary safety standards for pruning, trimming, repairing, maintaining & removing
trees, & cutting brush: - Answer-ANSI Z133

/.NERC standards require the reporting of all tree caused outages by __________
categories - Answer-three

/.A traditional cycle will schedule maintenance __________ trees grow into conductors.
- Answer-before

/.Which type of cuts are more acceptable? - Answer-nodal cuts
(e.g. drop-crotch, thinning)

/.The __________-__________ rule suggests that workers should take time before
starting a job to check for potentially unsafe conditions & discuss them. - Answer-two-
minute

/.According to ANSI Z133, the minimum approach distance for persons other than
qualified line-clearance arborists for 50 kV & less is __________. - Answer-10 feet

/.Trees growing into contact with a single-phase distribution conductor pose
__________ threat of a tree-ground fault. - Answer-little

/.Where should the final cut be made for proper utility pruning? - Answer-just outside of
the branch bark ridge and the branch collar

/.A vegetation management scheduling unit may be an entire __________ or a
__________ __________. - Answer-circuit;
geographical area

/.2 examples of protective equipment: - Answer-circuit breakers
lightning receptors

/.On a storm site, cutting should not begin until all risks have been assessed & the
__________ approach has been decided & adopted. - Answer-safest

, /.Actively __________ can facilitate understanding a customer's perceptions and
demonstrate the utility representative's sincere interest in a customer. - Answer-listening

/.As clearance work progresses, __________ between crews & dispatcher is critically
important to determine locations of downed or damaged lines. - Answer-communication

/.__________ negotiation uses the best aspects from both hard & soft bargaining. -
Answer-interest-based

/.An energized wire or conductor in a circuit is also known as a __________. - Answer-
phase

/.Fast-growing, problem species are sometimes known as __________ __________. -
Answer-cycle busters

/.Flush cuts damage which tissues? - Answer-the trunk

/.Clearing for a new distribution line is likely to be paid for by a __________ budget. -
Answer-capital

/.Surface temperatures at the point of contact with high voltage can reach __________
degrees F. - Answer-1,000

/.__________ __________ occurs when someone touches an energized fixture.
__________ __________ can occur when a person touches a conductive object that is
in contact with an energized fixture. - Answer-direct contact;
indirect contact

/.A grid-based scheduling system is most likely to be used by highly __________
utilities. - Answer-urbanized

/.Why is utility pruning done? - Answer-to maintain safety and rights-of-way

/.Reactive maintenance is often called __________. - Answer-hotspotting

/.True or False?
Guy wires are intended to help support poles but may become unintentionally
energized. - Answer-true

/.One of the highest personal risks in a storm is __________. - Answer-fatigue

/.When trying to negotiate mutually agreeable solutions & gain commitment based on
customer interests, the focus should be on __________, no on specific individuals. -
Answer-issues

Written for

Institution
ISA Utility
Course
ISA Utility

Document information

Uploaded on
March 13, 2025
Number of pages
33
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$16.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainariam Harvard University
Follow You need to be logged in order to follow users or courses
Sold
149
Member since
1 year
Number of followers
7
Documents
8376
Last sold
1 day ago

Our store offers a wide selection of materials on various subjects and difficulty levels, created by experienced teachers. We specialize on NURSING,WGU,ACLS USMLE,TNCC,PMHNP,ATI and other major courses, Updated Exam, Study Guides and Test banks. If you don't find any document you are looking for in this store contact us and we will fetch it for you in minutes, we love impressing our clients with our quality work and we are very punctual on deadlines. Please go through the sets description appropriately before any purchase and leave a review after purchasing so as to make sure our customers are 100% satisfied. I WISH YOU SUCCESS IN YOUR EDUCATION JOURNEY

Read more Read less
3.3

26 reviews

5
8
4
2
3
9
2
3
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions