According to OSHA, at what height is fall protection necessary? - CORRECT ANSWER:
6 feet
According to OSHA, at what height must scaffolding begin to have guardrails? -
CORRECT ANSWER: 10 feet
After the visual inspection for completeness of cleaning, to allow for final air sampling,
the Project Monitor is required to sign that the area has passed the scope of work and
no visible debris is evident in which document? - CORRECT ANSWER: The abatement
contractor supervisor's logbook
AHERA projects require which kind of microscopy to clear large asbestos removal
projects? - CORRECT ANSWER: Transmission Electron Microscopy (TEM)
Anyone entering or exiting the work area through the Personal Decontamination Unit
must do this every time - CORRECT ANSWER: Sign in and sign out
As per NYS ICR 56, air sampling pumps used on asbestos abatement projects must
flow a minimum of how many liters per minute? - CORRECT ANSWER: 2 L/min
As per NYS ICR 56, the negative air exhaust duct location must be how many feet away
from an air intake? - CORRECT ANSWER: 15 feet
As per NYS-ICR 56, these 4 items are required to be included in the clean room of the
Personal Decontamination Unit. - CORRECT ANSWER: 1. Lockers
2. Bench
, 3. Hooks
4. Shelf
As per NYS-ICR 56, this is a required posting by the abatement contractor, project and
air monitor on the abatement site. - CORRECT ANSWER: The respective company's
handling license
As per NYS-ICR 56, what is the minimum height of the Personal Decontamination Unit?
- CORRECT ANSWER: 6 feet
As per NYS-ICR 56, what is the overlap of seams within a layer? - CORRECT
ANSWER: 6 feet
As per NYS-ICR 56, what is the ratio of workers to shower heads? - CORRECT
ANSWER: 1 shower head for every 6 workers
As per NYS-ICR 56, what is the stagger distance of seams between the first and
second layers of poly? - CORRECT ANSWER: 2 feet
Asbestos containing gaskets, packings, resilient floor coverings, and asphalts roofing
products not being able to be reduced to dust by hand pressure are what NEHAP
category of nonfriable asbestos? - CORRECT ANSWER: Category 1
Before preparation duties begin inside the work area, what must be constructed? -
CORRECT ANSWER: Personal Decontamination Unit
Define the acronym ACBM - CORRECT ANSWER: Asbestos Containing Building
Material
Define the acronym ACM - CORRECT ANSWER: Asbestos Containing Material