1 part cement, 2 half of components sand, and five components stone - ANS-Thrust blocks
shall be concrete of a combination now not leaner than ______________
10 feet/sec - ANS-Flow required to provide velocity of __________ in pipes
32-40 inches - ANS-Where submit indicator valves are used, they will be set in order that the
pinnacle of each post is _______ above final grade
forty ft - ANS-A post indicator valve set up now not less than____ from the constructing
AHJ - ANS-Working plans will be submitted for approval to the _____ earlier than any device
is hooked up or revamped.
Asphalt or different corrosion-retarding cloth - ANS-All bolted joint accessories shall be
cleaned and punctiliously lined with _______________ after installation
Check Valve - ANS-When a couple of water deliver exists, a ___________ shall be set up in
each connection
clean of debris - ANS-The flushing operation shall continue until water float is proven to be
___________
Combined Service Mains - ANS-This preferred shall practice to ______ supposed to carry
water for fire provider mains
completing and signing the contractors fabric and test certificates - ANS-The putting in
contractor shall be responsible for _______________________
Control Valve - ANS-All take a look at valves shall have a ________ set up upstream and
downstream of the check valve.
Control Valves - ANS-_____ will be permitted within the device downstream of the fire
department connection
Control Valves - ANS-______ shall not be set up inside the piping from the fire department
connection to the hearth provider predominant
manage valves - ANS-______________ do no longer encompass drain valves, test valves,
or relief valves
dealing with uphill - ANS-Bell ends will be __________
flat stones, concrete slabs, or different authorised fabric - ANS-Hydrants shall be set up on
__________
gauge stress of 200 psi or 50 psi above working strain for 2 hours - ANS-All piping shall be
hydrostatically examined at ____________________________
much less than one hundred fifty psi - ANS-All piping used in private hearth carrier mains
shall be rated for the maximum gadget running strain to which the piping is uncovered to but
shall no longer be rated at _______________
much less than 18 inches - ANS-The center of a hose outlet shall no longer be
____________ above very last grade
minimal depth of 36 inches - ANS-Private hearth carrier mains established underneath
driveways or roadways will be buried at a ______________
greater than 36 inches - ANS-The center of a hose outlet shall no longer be _______ above
final grade
now not be less than 30 inches - ANS-In places wherein freezing is not a component, the
depth of cover shall __________________ beneath grade to prevent mechanical damage.