Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CNET 276 Exam 1 Prep | Questions with 100% Correct Answers

Rating
-
Sold
-
Pages
12
Grade
A
Uploaded on
13-03-2025
Written in
2024/2025

CNET 276 Exam 1 Prep | Questions with 100% Correct Answers What are the 3 basic types of documents used in construction contracts a. Bidding and Contract Requirements b. Drawings c. Specifications Which of the following are included in the Bidding Documents but not in the Construction Contract Documents a. Instructions to Bidders b. Bid Form T or F? Specs describe the construction in text form. True T or F? Construction specs apply on to the Construction phase of a project. False T or F? Development of construction specs for a project begins during the Contract Document phase. False T or F? Procurement docs include construction specs True T or F? Design-Bid-Build and Design-Build are two valid methods to procure a construction project. True T or F? Contract Documents are identified in the Agreement for a construction project. True T or F? Drawings are the graphic descriptions of the work to be performed by the Contractor. True The Agreement includes which of the following for the construction contract. a. Summary of the work to be performed by the Contractor b. Time within which work shall be completed c. Amount of money to be paid by Owner to Contractor d. All of the above T or F? The purpose of the Drawings and the Specs is to communicate information between the A/E and the Contractor True T or F? The term work is defined in the General Conditions of the Contract True The Contract Drawings designate which of the following relationships between elements of a facility: a. Identification of Equipment b. Limits of areas where work is performed c. Dimensions and sizes of components in the construction d. All of the above T or F? Drawings indicate which elements of the work shall be performed by specific subcontractors. False T or F? Drawings are organized according to the design discipline responsible for their preparation. True Drawings should not indicate which of the following? a. Work performed by the owner b. Proprietary names for products indicated c. Alternate bid conditions d. Locations for each factory-manufactured component Specs should not indicate which of the following? a. Descriptions for product bid conditions b. Requirements for installation of equipment c. Dimensional requirements for locating equipment d. Quality requirements for field installation and finishing T or F? Repeating requirements on the Drawings and in the Specs ensures proper installation of materials. False Parties who rely upon specs for bidding and construction include all but which of the following? a. Code authorities b. Installers, erectors and applicators c. Cost consultants d. Marketing data surveyors T or F? Under nationally publish General Conditions, the Contractor is solely responsible for the means, techniques, and sequences of construction. True T or F? Increased complexity of construction contracting has led to more complex construction specs. T or F? One of the primary reasons the Construction Specification Institute (CSI) was formed was to establish a standard format for organizing construction specs. True T or F? The original format for organizing construction specs Sections was alphanumeric with fixed alphanumeric identifiers for each commonly used building product. False MasterFormat has been published in all but which of the following years? a. 1978 b. 1983 c. 1988 d. 1993 e.2004 Which two of the following groups are not included in the MasterFormat , 2004 edition? a. Procurement and Contracting Group b. Specification Group c. Operations and Maintenance Group d. Drawings Group c. Operations and Maintenance Group and How many spec division are included in MasterFormat , 2004 edition? a. 16 b. 22 c. 49 d. 50 In the Spec Group of MasterFormat,j 2004 edition, which Subgroup include plumbing, HVAC and electrical specs? a. Div 02 through 19 b. Div 20 through 29 c. Div 30 through 39 d. Div 40 through 49 Electrical Specs are included in which Division under MF, 2004 edition? a. Div 13 b. Div 16 c. Div 26 d. None of the above The term "work result" introduced in MF 2004 describes which of the following? a. Means, techniques, and sequences of construction b. Performance attributes of construction products c. End result of work as defined in the General Conditions of the Contract d. None of the above Under MF 2004, there are how many Levels of detail represented in the published Section numbers and titles? a. 1 b. 2 c. 3 d. 4 T or F? In practice, construction spec numbers and titles should follow the same Level of detail throughout the Specs. False Use of Level 3 and 4 Section numbers and titles has all but which of the following advantages? a. Specs are easier to coordinate when writing b. Sections with limited areas of information are easier to produce c. The greater the number of narrowly focused specs Sections validates the role of the specs professional d. Segregation of info in several Sections helps avoid improper associations between specified products T or F? The Project Manual concept originated with the American Institute of Architects (AIA) True T or F? The Project Manual contain the written portion of the Bidding and Construction Documents True Which of the following are include in the Project Manual? a. Intro Information b. Bidding Requirements c. Contracting Requirements d. Specs e. All of the above T or F? The PM concept is only applicable to large, complex projects? False Which of the following reasons does not apply to why specs Sections do not establish trade or subcontract jurisdictions? a. Design pros are neither trained nor licensed to establish trade and subcontract jurisdictions b. The General Conditions of the Contract states that the specs do not establish trade and subcontract jurisdictions c. Regional construction practices better prescribe trade and subcontracted jurisdictions d. It is less costly if established trade and subcontract jurisdictions are followed T or F? Small-scale and less complex projects are more suited to Level 2 or "broad-scope" Sections True T or F? Appendices are recognized in CSI MF 2004 edition, for information not suitable for the standardized organization of MF. False T of F? CSI MF 04 prohibits the use of Appendices in the PM? False T or F? Organizing a PM according to CSI MF expedites the process of breaking out portions of the specs for bidding by subcontractors and material suppliers. False Which of the following is a negative attribute for the separation of the PM into portions (volumes)? a. The specs (PM) are easier to handle b. Separate volumes of the Bidding and Contract Reqs may be issued for fast-track or phased construction. c. Separating specs into volumes makes distinctions for Work designed for several design pros or teams of design pros more explicit d. Essential info may be omitted from separate volumes or the volumes may contain extraneous info T or F? A typical spec Section contains technical and nontechnical (contractual or procedural) info? True A spec Section is divided into how many Parts according to CSI SectionFormat? a. 1 b. 2 c. 3 d. 4 T or F? Measurement and payment procedures are specified in Part 4 of a spec Section, according to CSI SectionFormat False Which of the following is not in CSI SectionFormat? a. Part b. Sub-Part c. Paragraph d. Article T or F? CSI Section Format is adaptable to lesser and greater levels of detail in a spec Section. True Which of the following is not a Part title according to CSI Section Format? a. General b. Execution c. Products d. Payment CSI PageFormat establishes all but which of the following for appearance of the Sections? a. Article titles b. Page margins and indent settings c. Type and font size d. Bolding and underlining of headings

Show more Read less
Institution
CNET 276
Course
CNET 276

Content preview

CNET 276 Exam 1 Prep



What are the 3 basic types of documents used in construction contracts
a. Bidding and Contract Requirements
b. Drawings
c. Specifications

Which of the following are included in the Bidding Documents but not in the
Construction Contract Documents
a. Instructions to Bidders
b. Bid Form

T or F? Specs describe the construction in text form.
True

T or F? Construction specs apply on to the Construction phase of a project.
False

T or F? Development of construction specs for a project begins during the Contract
Document phase.
False

T or F? Procurement docs include construction specs
True

T or F? Design-Bid-Build and Design-Build are two valid methods to procure a
construction project.
True

T or F? Contract Documents are identified in the Agreement for a construction project.
True

T or F? Drawings are the graphic descriptions of the work to be performed by the
Contractor.
True

The Agreement includes which of the following for the construction contract.

a. Summary of the work to be performed by the Contractor
b. Time within which work shall be completed
c. Amount of money to be paid by Owner to Contractor
d. All of the above

, T or F? The purpose of the Drawings and the Specs is to communicate information
between the A/E and the Contractor
True

T or F? The term work is defined in the General Conditions of the Contract
True

The Contract Drawings designate which of the following relationships between elements
of a facility:

a. Identification of Equipment
b. Limits of areas where work is performed
c. Dimensions and sizes of components in the construction
d. All of the above

T or F? Drawings indicate which elements of the work shall be performed by specific
subcontractors.
False

T or F? Drawings are organized according to the design discipline responsible for their
preparation.
True

Drawings should not indicate which of the following?

a. Work performed by the owner
b. Proprietary names for products indicated
c. Alternate bid conditions
d. Locations for each factory-manufactured component

Specs should not indicate which of the following?

a. Descriptions for product bid conditions
b. Requirements for installation of equipment
c. Dimensional requirements for locating equipment
d. Quality requirements for field installation and finishing

T or F? Repeating requirements on the Drawings and in the Specs ensures proper
installation of materials.
False

Parties who rely upon specs for bidding and construction include all but which of the
following?

Written for

Institution
CNET 276
Course
CNET 276

Document information

Uploaded on
March 13, 2025
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$15.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Bri254 Rasmussen College
Follow You need to be logged in order to follow users or courses
Sold
919
Member since
5 year
Number of followers
738
Documents
3524
Last sold
2 weeks ago
Best Tutorials, Exam guides, Homework help.

When assignments start weighing you down, take a break. I'm here to create a hassle-free experience by providing up-to-date and recent study materials. Kindly message me if you can't find your tutorial and I will help.

4.0

181 reviews

5
106
4
20
3
25
2
6
1
24

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions