Certain non-storm water discharges may be necessary for the completion of construction
projects. Therefore the General Permit authorizes such discharges provided they meet the
following conditions except:
a. Meet the NALs for pH and turbidity
b. Not cause or contribute to a violation of water quality standards
, c. Comply with BMPs as described in the SWPPP
d. Be infeasible to eliminate
e. Causes or threatens to cause pollution, contamination, or nuisance
E
When possible, use erosion controls as the ___ protection, with sediment controls as a
___system.
a. primary, secondary
b. secondary, primary
A
A temporary or permanent structural BMP that directs concentrated flows away from
disturbed areas and prevents erosion is...
a. erosion control
b. run on/ run off control
c. sediment control
B
The amount of eroded soil that settles out at a point in the watershed that is remote from the
origin of the detached soil particles is...
a. Rainfall Erosivity Factor
b. Slope Length and Steepness Factors
c. Soil Cover Factor
d. Sediment Yield
D
What is turbidity?
a. The degree to which the water loses its transparency due to the presence of suspended
particulates
b. the acidity or alkalinity of a solution
c. the degree to which a chemical substance or a particular mixture of substances can damage
an organism
A
The removal of a uniform thin layer of soil by raindrop splash or water run-off is...
a. Splash Erosion