2025 OREGON 3 CONSTRUCTION CONTRACTOR CCB TEST 2 ACTUAL TEST COMPLETE REAL QUESTIONS AND CORRECT VERIFIED ANSWERS (A NEW UPDATED VERSION)

Beoordeling
4.0
(1)
Verkocht
-
Pagina's
145
Cijfer
A+
Geüpload op
23-03-2025
Geschreven in
2024/2025

2025 OREGON 3 CONSTRUCTION CONTRACTOR CCB TEST 2 ACTUAL TEST COMPLETE REAL QUESTIONS AND CORRECT VERIFIED ANSWERS (A NEW UPDATED VERSION)

Instelling
Vak

Voorbeeld van de inhoud

- ANS-
"Boilerplate"nisnantermnappliedntonconditionsnthatntendntonbenpredeterminednandnautomaticallyninclu
dedninnallnofnanbusiness'sncontracts.nThenmajoritynofnthesentendntonbendisclaimersnandnlegalnprotect
ionsnregardingnthingsnsuchnasnmediation,narbitration,nattorneysnfees,netc.nBencertainntonreadnthesen
justnasncarefullynbecausentheyncannhavenandirectnimpactnonnanynlegalnactionsnthatntakenplaceninnth
eneventnofnanproblem.

- ANS-
"Overlapping"nofnFMLAnandnOFLAnwithnWorkers'nCompensationnandnADAnandnOregonnDisabilit
ynLaws
Whenncoverednbynmorenthannonenemploymentnlaw,nthenemployernmustnfollownthenonenmostnbene
ficialntonthenemployee.nLargerncompaniesnwillnbencoverednbynbothnOFLAnandnFMLA.nThenOFLAna
ppliesntonemployersnwithn25nornmorenemployeesnwhereasnFMLAnappliesntonemployersnwithn50norn
morenemployees.

- ANS-10.nCalculatenYournMarkupnandnProfitnMargin


ClicknTonEnlarge


Nownyounarenreadyntonaddnthenfinishingntouchn-
nyournprofit.nEverynestimatenmustnincludenanprofit,notherwisenwhat'snthenpoint?

Thingsntonconsidernfornanprofitnthatnwillngetnyounbusinessnandnbenenoughntonkeepnyouninnbusiness,ni
nclude:
Yourncostnestimate
Thencustomer'snneedsnandnexpectationsnL
ocalnmarketnandncompetition
Desirednprofitnmargin
Onenofnthenmostncommonnmethodsnforndeterminingnthenfinalnmarkupnand,nthereby,nyournbid,nisn
cost-basednpricing.nThenbasicnformulanforncalculatingnthroughnthisnmethodnis:
CostnEstimaten+nOverheadn+nProfitnMarkupn=nBid
Innourncurrentnexample,nwenhavenaddednthenfirstntwonitemsnandnarrivednatn$11,364.00.nNownwenne
edntonfigurenwhatnwenwantnournprofitnmarginntonbe,nandnwenhavenournbid.
Thisnisnwherenknowledgenofnyournmarketncanngivenyounantruencompetitivenedge.nBidntoonlownandnan
ynunforeseenndelaysnornaddednexpensesncannrapid

- ANS-2.nAddnLabornBurden
Expensesnrelatedntonwagesnornrequirednpayrollndeductionsnandnothernemployernobligationsncannad
dnasnmuchnasn30%ntonyournlaborncosts.nThisnisncallednthen"labornburden".
Examplesnofnthesenhiddennexpensesninclude:nFede
ralnandnstatenwithholdingn(SeenCh.n14)nUnemploy
mentninsurancen(SeenChs.n3n&n14)
FederalnInsurancenContributionnActn(FICA)n(SeenCh.n14)nMedi
carenandnSocialnSecurityn(SeenCh.n14)
Workers'ncompensationninsurancen(SeenChs.n3n&n14)

,Employeenbenefitsn(healthncare,nvacation,netc.)
Annemployeentrustnbenefitnalsoncannbenannindirectnlaborncost.

- ANS-2010nOregonnManufacturednDwellingnInstallationnSpecialtynCode
EffectivenApriln1,n2010,nOregonnadoptednthennewnManufacturednDwellingnInstallationnSpecialtynCo
den(MDISC)ntonreplacenthen2002nManufacturednDwellingnandnParknSpecialtynCoden(MD&P).nThenn
ewnMDISCncodenisnbasednonnthen2002nMD&P,nU.S.nDepartmentnofnHousingnandnUrbannDevelopm
entn(HUD)ninstallationnstandards,nandnnationalnrecognizednmanufacturednDwellingninstallationnsta
ndards.

- ANS-2010nOregonnManufacturednDwellingnInstallationnSpecialtynCode
EffectivenApriln1,n2010,nOregonnadoptednthennewnManufacturednDwellingnInstallationnSpecialtynCo
den(MDISC)ntonreplacenthen2002nManufacturednDwellingnandnParknSpecialtynCoden(MD&P).nThenn
ewnMDISCncodenisnbasednonnthen2002nMD&P,nU.S.nDepartmentnofnHousingnandnUrbannDevelopm
entn(HUD)ninstallationnstandards,nandnnationalnrecognizednmanufacturednDwellingninstallationnsta
ndards.

- ANS-2010nOregonnSolarnInstallationnSpecialtynCode
EffectivenOctobern1,n2010,nthendivisionnadoptednthen2010nOregonnSolarnInstallationnSpecialtynCod
en(OSISC),nthenfirstnsolarncodenfornOregonnandnthenfirstnstatewidensolarncodeninnthenNation.nThenCo
denisnpartnofnthendivision'snoverallngoalntonfacilitatengreennbuildingntechnologies.
ThenOSISCnstandardsnarenforntheninstallationnofnthenstructuralncomponentsnforninstallation,nalterat
ion,nreplacementnornrepairnofnsolarnphotovoltaicnsystems.nThenelectricalnrequirementsnarencontain
edninnthenOregonnElectricalnSpecialtynCodenandnreproducedninnthenOSISC'snappendixnA.

- ANS-2014nOregonnEnergynEfficiencynSpecialtynCode
Oregonnhasnadoptednannewnstand-
alonencodentonaddressnenergynissuesninnconstructionninnOregon.nThen2014nOregonnEnergynEfficie
ncynSpecialtynCoden(OEESC)nwasnadoptedneffectivenJulyn1,n2014nwithnangracenperiodnextendingnt
onOctobern1,n2014.nThisnisnthenlastncodencyclenwherenthenenergynprovisionsnwillnbenpublishednasnan
separatenpublication.nInnthenfollowingncodencyclesnthisnwillnbenansubsetnofnthenOSSC.

- ANS-2014nOregonnFirenCode
Then2014nOregonnFirenCodenisnbasednonnthen2014nICCnInternationalnFirenCodenwithnOregonnamen
dments.

- ANS-2014nOregonnMechanicalnSpecialtynCoden(OMSC)
Oregonnadoptednthen2014n(OMSC),nwhichnisnbasednonnthen2012nInternationalnMechanicalnCode,n
Oregonnamendmentsnandnthen2012nInternationalnFuelnGasnCodenasnannappendix.nThenOMSCnapp
liesntonallnstructuresnnotncoverednundernthenOregonnResidentialnSpecialtynCode.

- ANS-2014nOregonnStructuralnSpecialtynCoden(OSSC)

,ThenOSSCnconsistsnofnthen2011neditionnofnthenInternationalnBuildingnCodenwithnOregonnamen
dments,nwhichnwasneffectivenJulyn1,n2014nwithnangracenperiodnextendingntonOctobern1,n2014.
ThisncodenappliesntonallnstructuresnnotnregulatednundernthenOregonnResidentialnSpecialtynCode,nin
cludingnthenfollowing
Commercialnstructures
Transientnlodging,nsuchnasnhotelsnandnmotels
CertainnresidentialnstructuresnsubjectntonlicensurenbynthenOregonnDepartmentnofnHumannServicesn
Low-risenmultiplenfamilyndwellings

- ANS-2017nOregonnElectricalnSpecialtynCoden(OESC)
Oregonnadoptednthen2017nOregonnElectricalnSpecialtynCodeneffectivenOctobern1,n2017,nwhichnisnb
asednonnthen2017neditionnofnthenNFPAn70,nNationalnElectricalnCodenamendmentsntonthen2017nNE
C??nadoptednOct.n1,n2017.nThisncodencontainsnrequirementsnfornelectricalninstallations.

- ANS-2017nOregonnResidentialnSpecialtynCode
Oregonnadoptednthen2017nOregonnResidentialnSpecialtynCodeneffectivenOctobern1,n2017.nItnisnba
sednonnthen2015neditionnofnthenICCnInternationalnResidentialnCodenwithnenhancementsnaddedninn2
017.
ThenplumbingnandnelectricalnchaptersnofnthenInternationalnCodenarennotnusedninnOregon.nThenOreg
onnStatenPlumbingnCodenandnthenOregonnStatenElectricalnCodenapplyninnOregon.
ThenscopenofnthenOregonnResidentialnSpecialtynCodenhasnbeennexpandedntonincludenmultifamilynu
nitsnandnincludesn-nwithnlimitationsn-
ntownhouses,napartments,nandnrownhousesnincludingntheirnaccessorynstructures.nRownhousesnaren

coveredninnAppendixnOnofnthenOregonnResidentialnSpecialtynCode.

- ANS-2017nOregonnResidentialnSpecialtynCode
Oregonnadoptednthen2017nOregonnResidentialnSpecialtynCodeneffectivenOctobern1,n2017.nItnisnba
sednonnthen2015neditionnofnthenICCnInternationalnResidentialnCodenwithnenhancementsnaddedninn2
017.
ThenplumbingnandnelectricalnchaptersnofnthenInternationalnCodenarennotnusedninnOregon.nThenOreg
onnStatenPlumbingnCodenandnthenOregonnStatenElectricalnCodenapplyninnOregon.
ThenscopenofnthenOregonnResidentialnSpecialtynCodenhasnbeennexpandedntonincludenmultifamilynu
nitsnandnincludesn-nwithnlimitationsn-
ntownhouses,napartments,nandnrownhousesnincludingntheirnaccessorynstructures.nRownhousesnaren

coveredninnAppendixnOnofnthenOregonnResidentialnSpecialtynCode.

- ANS-3.nDeterminenMaterialsnCosts
Fornmaterials,nyounwantntonfollownansimilarnprocessntonthenlabornestimating.nWorkingnfromnyournesti
matenframework,ncalculatenthencostnforneachnmaterialnitemnlisted.nThisnisnanothernareanwherenhavi
ngnyournhistoricalndatanavailablenwillnbenanhugenhelp,nhowever,nyounalsonneedntonstaynabreastnofnth
enmarketnbecausenmaterialncostsncannfluctuatendramaticallynbasednonnsupplynandndemand/navaila
bility.

, Yournsuppliersnarenthenbestnsourcenforncurrentninformation.nTheyncannprovideneithernpernunitnornl
ump-
sumncostsntonassistnyournestimate.nAlternatively,nthenU.S.nBureaunofnLaborn&nStatisticsntracksnt
hencostsnofnmajorngroupsnofnconstructionnmaterialsninnthenProducernPricenIndexn(PPI)nprogram.
Ifnyounreceiventhencostsnpernunit,nyouncannapplynthenfollowingnformulantonhelpndeterminenthenexpect
edncostnforneachncategorynofnmaterial:
PricenpernUnitnxnNumbernofnUnitsnNeededn=nTotalnMaterialnUnitnCostnT
onensure

- ANS-4.nCalculatenProjectnEquipment
Equipmentncostsngenerallynarendirectncosts.nEquipmentnspecificntonanproject,ne.g.,nrentalnofnanforklif
t,ncrane,nbackhoe,netc.,nspecificallynfornthenprojectnisnandirectncostnandnshouldnbenaddedntonyournest
imate.nSmallntoolsnandncompany-
ownednvehiclesnthatnarenusednregularlynfornjobsnandnnotnspecificntonanparticularnprojectnarenoverhea
dnandnshouldnnotnbenincludednhere.
Therenarendifferentnwaysntoncalculatenthendirectncostndependingnonnwhethernyounown,nrent,nsubcont
ract,nornlease.

- ANS-
4.nCalculatenProjectnEquipmentnOwned
nEquipment

Beginnbyndeterminingnthenpernunitncost,nconsideringnthenfollowingnfactors:n
Actualnvaluenofnequipmentn(includingnage,ndepreciation,netc.)nMaintenanc
enandnoperatingncostsn(e.g.,nfuel)
Taxesnandnfees
Laborntonoperaten(includingntrainingnornlicensingnifnapplicable)nI
nsurance
Toncalculatenthencostnfornthenproject:
Estimatenthennumbernofnhoursnpernyearnthenequipmentnisnusedn
Determinenthenannualncostntonownnandnoperatenthenequipmentn
Dividenthencostnbynthennumbernofnhours
ThennmultiplynthenhourlynratenbynthennumbernofnhoursnexpectedntonbenneedednfornthisnprojectnT
henformulanlooksnlikenthis:
Costnofnequipmentnpernyearn/nNumbernofnhoursnusednpernyearn=nCost
Fornexample,nanpiecenofnequipmentncostn$10,000npernyearntonownnandnmaintain.nYounusenthenequ
ipmentn1000nhoursnpernyear.nYourncostnisn$10npernhour.nOnnthisnprojectnyoundeterminenyounwillnne
edn50nhoursnofnusenofnthisnequipment.nY

- ANS-
4.nPreparingnFinancialnStatementsnBalanc
enSheet
Long-termnLiabilities
Oppositenofncurrentnliabilities,n"long-
termnliabilities"narenitems,ne.g.,nbanknloans,ndeferredntaxnpayments,nthatnarendueninnantimenperiodnlo
ngernthannonenyear.

- ANS-
4.nPreparingnFinancialnStatementsnBalanc

Gekoppeld boek

Geschreven voor

Vak

Documentinformatie

Geüpload op
23 maart 2025
Aantal pagina's
145
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$21.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Beoordelingen van geverifieerde kopers

Alle reviews worden weergegeven
1 jaar geleden

4.0

1 beoordelingen

5
0
4
1
3
0
2
0
1
0
Betrouwbare reviews op Stuvia

Alle beoordelingen zijn geschreven door echte Stuvia-gebruikers na geverifieerde aankopen.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
AUTHENTICNURSE Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
7
Lid sinds
1 jaar
Aantal volgers
1
Documenten
434
Laatst verkocht
8 maanden geleden

4.6

478 beoordelingen

5
339
4
116
3
17
2
5
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen