VA Contractors License Test with 100% Correct Answers

Beoordeling
-
Verkocht
-
Pagina's
36
Cijfer
A+
Geüpload op
25-03-2025
Geschreven in
2024/2025

The maximum claim of a claimant against Fund based upon any unpaid judgment arising out of the improper of dishonest conduct involving one transaction shall not exceed? A) $15,000 B) $20,000 C) $40,000 D) $10,000 - $20,000 In the event that a regulant's license has been revoked due to dishonesty, the regulant shall not be eligible to apply for a license until (. ) has been submitted to the Fund - the full amount paid from the Board plus interest A license shall expire ( ) years from the last day of the month in which it was issued. A) 4 B) 2 C) 1 D) 3 - 2 The minimum storage capacity of a sediment basin shall be (. ) cubic yards per acre of drainage area - 134 Each applicant shall be assessed (. ) which is to be placed in the Contractor Transaction Recovery Fund - $25 Which of the following is permitted to receive awards from the Fund? - Property owner A contract calls for the liquidated damages of $500 per day. The project completed five days late because it was delayed by rain. The completion would have been ten days earlier if it were not for the rain delay. There was a $500 bonus per day for the contractor for early completion. No extension of time was requested or granted. How much does the contractor earn or owe? - Owe $2,500 A partnership is required to - Obtain a federal tax ID number A particular project requires special tools not ordinarily used by the business. For the estimate, the entire cost of these tools should be - Included in the equipment cost Construction business differs from the manufacturing in that - product price is determined before actual cost is determined An owner makes a progress payment to the contractor one day later than originally called for by the contract. The contractor decides to abandon the job without completing it. The contractor probably A) Is legally justified B) Has committed a material breach of the contract. C) Should have obtained a lien against the property D) Should have requested change order. - B

Meer zien Lees minder
Instelling
VA Contractor License
Vak
VA Contractor License

Voorbeeld van de inhoud

VA Contractors License Test with 100%
Correct Answers

The maximum claim of a claimant against Fund based upon any unpaid judgment
arising out of the improper of dishonest conduct involving one transaction shall bot
exceed?
A) $15,000
B) $20,000
C) $40,000
D) $10,000 - ✅✅ $20,000


In the event that a regulant's license has been revoked due to dishonesty, the
regulant shall not be eligible to apply for a license until (. ) has been submitted to
the Fund - ✅✅ the full amount paid from the Board plus interest


A license shall expire ( ) years from the last day of the month in which it was
issued.
A) 4
B) 2
C) 1
D) 3 - ✅✅ 2


The minimum storage capacity of a sediment basin shall be (. ) cubic yards per
acre of drainage area - ✅✅ 134

,Each applicant shall be assessed (. ) which is to be placed in the Contractor
Transaction Recovery Fund - ✅✅ $25


Which of the following is permitted to receive awards from the Fund? - ✅✅
Property owner


A contract calls for the liquidated damages of $500 per day. The project completed
five days late because it was delayed by rain. The completion would have been ten
days earlier if it were not for the rain delay. There was a $500 bonus per day for
the contractor for early completion. No extension of time was requested or granted.
How much does the contractor earn or owe? - ✅✅ Owe $2,500


A partnership is required to - ✅✅ Obtain a federal tax ID number


A particular project requires special tools not ordinarily used by the business. For
the estimate, the entire cost of these tools should be - ✅✅ Included in the
equipment cost


Construction business differs from the manufacturing in that - ✅✅ product price
is determined before actual cost is determined


An owner makes a progress payment to the contractor one day later than originally
called for by the contract. The contractor decides to abandon the job without
completing it. The contractor probably
A) Is legally justified
B) Has committed a material breach of the contract.
C) Should have obtained a lien against the property
D) Should have requested change order. - ✅✅ B

,A contractor does not notify a change of address and so does not receive a timely
Notice of Renewal. Who is responsible for when the contractor does not renew his
license on time? - ✅✅ The Licensee Contractor


A Designated Employee should be? - ✅✅ At least 18, Full Time, Passed
Required Exams


What is the initial Recovery Fund fee? - ✅✅ $25


If a contractor earns more than $_______ per year, then the contractor is required
to have a Class A. - ✅✅ $750,000


If a contract awards more than $_________ per payment, the contractor is required
to have a Class A. - ✅✅ $120,000


An Erosion control conservation plan needs to be approved within ____ days. -
✅✅ 60 Days


Where do you go to file an appeal of a violation to the USBC provisions? - ✅✅
to The LBBCA
Local
Board of
Building
Code
Appeals


A contractor is required to submit a renewal within____ days of the expiration
date? - ✅✅ 30

, Who can file a complaint against a contractor? (Under the recovery fund) - ✅✅
Residential Property Owner


What is required when changing the form of entity from a sole proprietorship to a
corporation - ✅✅ A new license


What is the maximum fund allowed for a single contractor? (per biennium) - ✅✅
$40,000


To whom should a stop work order be given? - ✅✅ owner, owner's agent or the
person doing the work


Within how many days should be submitted an appeal for construction? - ✅✅ 30
Days


An appeal of the local building officials’ decision to refuse to grant a modification
to the USBC MUST be made within how many days? - ✅✅ 30 Days


Documents related to a contract should be kept for ______ years? - ✅✅ 5


Where should one set of all approved building documents be kept? - ✅✅ At the
building site


An erosion control conservation specification needs to be approved within_____
days - ✅✅ 45 days

Geschreven voor

Instelling
VA Contractor License
Vak
VA Contractor License

Documentinformatie

Geüpload op
25 maart 2025
Aantal pagina's
36
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
kharowl Stanford University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
14
Lid sinds
2 jaar
Aantal volgers
7
Documenten
1509
Laatst verkocht
4 maanden geleden
The Scholar's Depot: Where Knowledge Meets Opportunity

Imagine a digital marketplace buzzing with academic vitality—Kharowl. This knowledgeable entrepreneur curates a treasure trove of meticulously crafted exam materials, sharing a passion for aiding fellow scholars in their academic journeys. Their dedication to excellence shines through every document, fostering a community where knowledge is not just sold but shared.

3.0

2 beoordelingen

5
1
4
0
3
0
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen