The Virginia Stormwater Management Program is authorized by the ______ and
administered through the ______ - (answers)Virginia Stormwater Management
Act, Virginia Stormwater Management Program Regulation
VPDES Permit/Construction GP authorizes discharge of stormwater from
construction activities that are - (answers)greater than or equal to an acre
The Stormwater Management Act requires the State Water Control Board to -
(answers)permit, regulate, and control stormwater runoff
DEQ has ___ days to complete review of real or potential inter-jurisdictional
impacts upon request - (answers)90
The Stormwater Management Act requires the following individuals to obtain and
maintain a certificate of competency - (answers)staff of a stormwater program,
anyone contracted by a VSMP authority, standard and specification holders
The dual certificate will expire three years from - (answers)the latest date of the
certificates
SWM plan must be approved by ___ before land disturbance - (answers)VSMP
program authority
, 2|Page
The water quality criteria sets a site-based load limit of ____ of total phosphorus
for new development - (answers)0.41 lbs/acre/year
The phosphorus load limit uses the - (answers)10% impervious cover
Part II B and II C water quantity criteria addresses - (answers)channel protection
and flood protection
Which two plans in the SWPPP must be approved? - (answers)SWM plan, ESC plan
Does the SWM plan address runoff during or after construction? - (answers)post-
construction
What is the lower limit of the range of imperviousness that can result in stream
degradation? - (answers)10%
What do land disturbing activities consist of? - (answers)excavating, clearing,
grading
LDA threshold for the SWM Act and Regulation - (answers)1 acre or 2500 square
feet for Chesapeake Bay Preservation Act
SWM DEQ 2025 WITH 100% VERIFIED QUESTIONS
AND EXPERT SOLUTIONS| GUARANTEED VALUE AND
SUCCESS.
The Virginia Stormwater Management Program is authorized by the ______ and
administered through the ______ - (answers)Virginia Stormwater Management
Act, Virginia Stormwater Management Program Regulation
VPDES Permit/Construction GP authorizes discharge of stormwater from
construction activities that are - (answers)greater than or equal to an acre
The Stormwater Management Act requires the State Water Control Board to -
(answers)permit, regulate, and control stormwater runoff
DEQ has ___ days to complete review of real or potential inter-jurisdictional
impacts upon request - (answers)90
The Stormwater Management Act requires the following individuals to obtain and
maintain a certificate of competency - (answers)staff of a stormwater program,
anyone contracted by a VSMP authority, standard and specification holders
The dual certificate will expire three years from - (answers)the latest date of the
certificates
SWM plan must be approved by ___ before land disturbance - (answers)VSMP
program authority
, 2|Page
The water quality criteria sets a site-based load limit of ____ of total phosphorus
for new development - (answers)0.41 lbs/acre/year
The phosphorus load limit uses the - (answers)10% impervious cover
Part II B and II C water quantity criteria addresses - (answers)channel protection
and flood protection
Which two plans in the SWPPP must be approved? - (answers)SWM plan, ESC plan
Does the SWM plan address runoff during or after construction? - (answers)post-
construction
What is the lower limit of the range of imperviousness that can result in stream
degradation? - (answers)10%
What do land disturbing activities consist of? - (answers)excavating, clearing,
grading
LDA threshold for the SWM Act and Regulation - (answers)1 acre or 2500 square
feet for Chesapeake Bay Preservation Act