Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

AVIXA CTS-I EXAM QUESTIONS AND ANSWERS

Beoordeling
-
Verkocht
-
Pagina's
23
Cijfer
A+
Geüpload op
29-03-2025
Geschreven in
2024/2025

AVIXA CTS-I 1. Conducing Pre installation Activities/Evaluate Overall Facility Condia During a technical site survey for an installation with a display, informaion gathered should include: A. Color of the walls B. Receptionist name and phone number C. Ceiling height and construction method D. Rules governing use of the freight elevator - Answer- C. Ceiling height and construction method [Conducting Site Rough-In/ First-Fix/Mount Substructure] When mounting a 34kg (75lb) projector with a 7kg (15lb) mount, the substructure should be able to support a minimum weight of: A. 82kg (1801b) B. 41kg (90lb) C. 204kg (450lb) D. 122kg (270lb) - Answer- C. 204kg (450lb) 3. [Installing Audiovisual Systems/Prepare Audiovisual Rack] Where should you place the wireless microphone receiver antenna in a rack assembly? A. Line of sight to the transmitter B. Inside the transmitter room C. In the front of the rack D. At the rear of the rack - Answer- C. In the front of the rack 4. [Performing Systems Closeout/Provide Training on Equipment Operation] When training a customer on the operation of a touch-panel interface, an example that the GUI is a good design that meets the customer's needs is: A. The customer can easily use the touch panel with little explanation B. The customer requires intensive training on how to use the touch panel C. The customer thinks the panel looks cool D. The customer wants only a few changes - Answer- A. The customer can easily use the touch panel with little explanation 1. Before developing a project plan, it is important to: A. Make sure the client has made a deposit payment B. Have a clear understanding of the scope of work C. Order the AV equipment needed D. List all the teams that will work on the project - Answer- B. Have a clear understanding of the scope of work 2. A scope statement should include: A. Only the items within the project scope

Meer zien Lees minder
Instelling
AVIXA CTS-I
Vak
AVIXA CTS-I

Voorbeeld van de inhoud

AVIXA CTS-I
1. Conducing Pre installation Activities/Evaluate Overall Facility Condia During a technical site
survey for an installation with a display, informaion gathered should include:

A. Color of the walls
B. Receptionist name and phone number
C. Ceiling height and construction method
D. Rules governing use of the freight elevator - Answer- C. Ceiling height and construction method

[Conducting Site Rough-In/ First-Fix/Mount Substructure]
When mounting a 34kg (75lb) projector with a 7kg (15lb) mount, the substructure should be able to
support a minimum weight of:

A. 82kg (1801b)
B. 41kg (90lb)
C. 204kg (450lb)
D. 122kg (270lb) - Answer- C. 204kg (450lb)

3. [Installing Audiovisual Systems/Prepare Audiovisual Rack]
Where should you place the wireless microphone receiver antenna in a rack assembly?

A. Line of sight to the transmitter
B. Inside the transmitter room
C. In the front of the rack
D. At the rear of the rack - Answer- C. In the front of the rack

4. [Performing Systems Closeout/Provide Training on Equipment Operation]
When training a customer on the operation of a touch-panel interface, an example that the GUI is
a good design that meets the customer's needs is:

A. The customer can easily use the touch panel with little explanation
B. The customer requires intensive training on how to use the touch panel
C. The customer thinks the panel looks cool
D. The customer wants only a few changes - Answer- A. The customer can easily use the touch
panel with little explanation

1. Before developing a project plan, it is important to:

A. Make sure the client has made a deposit payment
B. Have a clear understanding of the scope of work
C. Order the AV equipment needed
D. List all the teams that will work on the project - Answer- B. Have a clear understanding of the
scope of work

2. A scope statement should include:

A. Only the items within the project scope

,B. Only the items within the deliverable scope
C. All the tasks that have to be performed
D. Both in-scope and out-of-scope items - Answer- D. Both in-scope and out-of-scope items

3. The key elements of a project should be driven by:

A. The cost of materials
B. The overall budget
C. The client's need
D. The deadline for completion - Answer- C. The client's need

4. What is a dependency within a project task schedule?

A. A task that cannot begin before another task has been completed
B. A task that must be completed by a specific date
C. A task that will be required if specific conditions occur at the project site
D. An optional task that the client can determine is needed once the project is underway - Answer-
A. A task that cannot begin before another task has been completed

5. Project budget refers to which of the following?

A. The amount of labor and materials the project manager has allocated to complete the project
B. The total amount that the client has paid the AV company for the project
C. The amount needed for purchasing the materials and supplies
D. The actual cost of labor and materials used to complete the project - Answer- A. The amount of
labor and materials the project manager has allocated to complete the project

6. A primary reason for attending construction meetings is to:

A. Develop a relationship with the other people on the job
B. Identify changes to the original design that will affect the AV installation
C. Find out the project's completion date
D. Submit invoices and other budget documentation - Answer- B. Identify changes to the original
design that will affect the AV installation

7. In the event of a change in the placement of air-conditioning ducts in a boardroom, which of the
following documents should the AV integrator submit first?

A. Punch/snag/problem list
B. Change order (CO)
C. Request for change (RFC)
D. Request for information (RFI) - Answer- D. Request for information (RFI)

8. Which of the following documents should an AV integrator submit in the event that a
manufacturer has discontinued a projector model?

A. Letter of transmittal
B. Progress report (PR)
C. Request for change (RFC)
D. Construction change directive (CCD) - Answer- C. Request for change (RFC)

, 9. The ANSI/AVIXA 2M-2010 Standard Guide for Audiovisual Systems Design
Coordination Processes lays out a procedure for determining the _

A. functions and features that are required to support a given set of tasks
B. project communication that needs to take place on a given project
C. room types that are suitable for a given set of client needs
D. verification tests that should be performed during a given project - Answer- B. project
communication that needs to take place on a given project

10. After which of the following activities is an AV project completed?

A. All hardware is installed
B. Software integration is completed
C. Verification that the system is operational
D. System closeout activities are completed - Answer- D. System closeout activities are completed

1. Which set of drawings should you reference to view the ductwork that goes through the
building?

A. Architectural drawings
B. Mechanical drawings
C. System drawings
D. Electrical drawings - Answer- B. Mechanical drawings

2. Which set of drawings would you reference to locate the power outlet for a video display?

A. Structural drawings
B. Mechanical drawings
C. Electrical drawings
D. System drawings - Answer- C. Electrical drawings

3. Which of the following must the as-built drawings show?

A. The client's vision for the finished system
B. Details of the system as finally installed
C. Original system design specification
D. Mechanical drawings - Answer- B. Details of the system as finally installed

5. An architectural drawing was created using the U.S. customary scale of 1/8 inch =
1 foot. You measure a distance of 4.25 inches on the drawing. Which of the following is the actual
distance in feet?

A. 34ft
B. 16ft
C. 28ft
D. 68ft - Answer- A. 34ft

6. An architectural drawing was created using the SI scale of 1:200. You measure a distance of 13
millimeters on the drawing. What is the actual distance in millimeters?

Geschreven voor

Instelling
AVIXA CTS-I
Vak
AVIXA CTS-I

Documentinformatie

Geüpload op
29 maart 2025
Aantal pagina's
23
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$20.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Freshy Oxford University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
61
Lid sinds
2 jaar
Aantal volgers
4
Documenten
6989
Laatst verkocht
2 weken geleden

3.6

10 beoordelingen

5
3
4
4
3
1
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen