Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

DBIA EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS VERIFIED GRADED A++ LATEST UPDATE

Rating
-
Sold
-
Pages
4
Grade
A+
Uploaded on
31-03-2025
Written in
2024/2025

DBIA EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS VERIFIED GRADED A++ LATEST UPDATE Terms in this set (127) Idwp Integrated design work plan PDRI Project definition rating index BIM Building Information Modeling What is the biggest item contributing to team failure? Absence of trust Design manager Manages design information flow and deliverables. Unique role that didn't exist before Designer of record Manages design performance interface Four primary phases of oversight Preconstruction, contract oversight, close-out, and performance evaluation Formal partnering typically results in mutually developing which items? A charter, communication matrix, and an issue resolution ladder What are the critical interfaces between designer of record and contractor? Design&construct for value, design & construct to budget, design for constructibility, and design& construct for quality performance Three requirements of estimating Functional, performance, and prescriptive Offer Party offers to contract with another Acceptance A party accepts the other party's offer Consideration Value exchanged for performance Capacity The party making the contract must be legally able to do so Authority The individual forming the contract must have authority to do so Betterment Doctrine Avoids windfalls- owner must pay first cost Constructive change Change by implication-can be oral or written or omission Indemnity Insurance portion, for 3rd party claims, generally protects against liability, loss, or damage Liquidated Damages cost of late completion- cannot be a penalty Spearin Doctrine if contractor builds in compliance whether or not it works then contractor is not held responsible tort Law legally created; remedy to who was harmed Contract Law Law between two parties offer a party offers to contract with another (response to RFP) acceptance a party accepts the other party's offer capacity the party making the contract must be legally able to do so consideration value exchanged for performance (money, services, etc.) Authority the individual forming the contract must have authority to do so Differing Site Conditions Type 1 unknown & hidden, concealed, or latent physical condition (ex. geotechnical report incorrect) Differing Site Conditions Type 2 encounters unknown physical conditions of unusual nature that differ materially from those ordinarily encountered & generally recognized as inherent int he work at the Project's location Define GMP Guaranteed Maximum price

Show more Read less
Institution
Course

Content preview

3/30/25, 9:24 DBIA Flashcards |
AM
DBIA EXAM QUESTIONS AND ANSWERS WITH COMPLETE
SOLUTIONS VERIFIED GRADED A++ LATEST UPDATE
Terms in this set (127)


Idwp Integrated design work plan

PDRI Project definition rating index

BIM Building Information Modeling

What is the biggest item contributing to Absence of trust
team failure?

Manages design information flow and deliverables. Unique role that didn't exist
Design manager
before

Designer of record Manages design performance interface

Four primary phases of oversight Preconstruction, contract oversight, close-out, and performance evaluation

Formal partnering typically results A charter, communication matrix, and an issue resolution ladder
in mutually developing which
items?
What are the critical interfaces between Design&construct for value, design & construct to budget, design for
designer of record and contractor? constructibility, and design& construct for quality performance

Three requirements of estimating Functional, performance, and prescriptive

Offer Party offers to contract with another

Acceptance A party accepts the other party's offer

Consideration Value exchanged for performance

Capacity The party making the contract must be legally able to do so

Authority The individual forming the contract must have authority to do so

Betterment Doctrine Avoids windfalls- owner must pay first cost

Constructive change Change by implication-can be oral or written or omission

Insurance portion, for 3rd party claims, generally protects against liability, loss, or
Indemnity
damage

Liquidated Damages cost of late completion- cannot be a penalty

if contractor builds in compliance whether or not it works then contractor is not
Spearin Doctrine
held responsible
tort Law legally created; remedy to who was harmed

Contract Law Law between two parties

offer a party offers to contract with another (response to RFP)

acceptance a party accepts the other party's offer

capacity the party making the contract must be legally able to do so

consideration value exchanged for performance (money, services, etc.)

Authority the individual forming the contract must have authority to do so

unknown & hidden, concealed, or latent physical condition (ex. geotechnical
Differing Site Conditions Type 1
report incorrect)

encounters unknown physical conditions of unusual nature that differ materially
Differing Site Conditions Type 2 from those ordinarily encountered & generally recognized as inherent int he
work at the Project's location

Define GMP Guaranteed Maximum price




1/
4

Written for

Course

Document information

Uploaded on
March 31, 2025
Number of pages
4
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AcademicSuperScores Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
302
Member since
3 year
Number of followers
37
Documents
7671
Last sold
2 days ago
AcademicSuperScores

NURSING, ECONOMICS, MATHEMATICS, BIOLOGY AND HISTORY MATERIALS. BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS AND STUDY GUIDE MATERIALS WITH GUARANTEE OF A+ I am a dedicated medical practitioner with diverse knowledge in matters Nursing and Mathematics. I also have an additional knowledge in Mathematics based courses (finance and economics)

4.6

156 reviews

5
125
4
9
3
11
2
5
1
6

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions