DBIA EXAM QUESTIONS AND ANSWERS WITH COMPLETE
SOLUTIONS VERIFIED GRADED A++
Practice questions for this set
Learn 1/7 Study using Learn
Contract Format typically in DBB
Select the correct term
1Unit Price 2Target Price
3Best Value 4Lump Sum
Don't know?
Terms in this set (25)
Federal Government passed bond adopting a Miller right requiring payment and
Miller Act 1935
performance bonds on all public works.
Qualifications Based Brooks Act 1972 A/E's selected on qualifications
Clinger Cohen Act 1996 Defense Allows all federal agencies to utilize Design-Build. Prior to that no enabling
Procurement Reform Act legislation existed allowing Design-Build.
The level of quality that any average Design Professional would be able to
Standard of Care
perform given the circumstances.
Slowest Project Delivery method, linear in nature, prescriptive (owner knows what
Design Bid Build
they want),
Multi Prime Project Delivery
Project Delivery method allowing the contractor to come on board very early in
CM at Risk design for preconstruction services yet maintains separation between Designer
and Builder contractually.
Fastest Project Delivery method, fast tracking possible overlapping design with
Design Build
construction utilizing incremental packages.
Low Bid Procurement Method
Negotiated (Qualifications Based) Procurement Method
Best Value Procurement Method
Sole Source Procurement Method
Lump Sum Contract Format typically in DBB
Cost Plus Fee Contract Format
GMP (Guaranteed Maximum Price) Contract Format