DBIA: PRINCIPLES OF DESIGN-BUILD AND POST AWARD & CONTRACTS EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS VERIFIED Terms in this set (110) Miller Act 1935 Federal Government passed bond requiring payment and performance bonds on all public works, what year? Brooks Bill 1972 Bill directing A/E's selected on qualifications, what year? Clinger Cohen Act/Defense Procurement Reform Act 1996 Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. Standard of Care The level of quality that any average Design Professional would be able to perform given the circumstances. Design Bid Build Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they want), Multi Prime Project Delivery - Many contracts through Owner CM at Risk Project Delivery method allowing the contractor to come on board very early in design for preconstruction services yet maintains separation between Designer and Builder contractually. Design Build Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing incremental packages. Low Bid Procurement Method - Most Familiar Negotiated (Qualifications Based) Procurement Method - Common for A/E Best Value Procurement Method - Qualifications and Price Sole Source Procurement Method - Direct Lump Sum Contract Format w/ agreed upon fixed price Cost Plus Fee Contract Format - contractor reimbursed for actual cost plus an agreed upon percentage GMP (Guaranteed Maximum Price) Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only up to a certain amount. Unit Price Contract Format - cost per piece Target Price Contract Format - established cost/benchmark determined jointly by project team. Trust, Flexibility Successful Design Build requires _____ & between participants Hammurabi Singular responsibility for both design & construction was first codified by ____ Bridging Documents Owner provided items such as 20% design or more and provides prescriptive specs at RFP. Spearin Doctrine Owner is responsible for implied warranties in the sufficiency of the specifications. Performance Requirements _ should identify end results. Design Build Single point of responsibility for both design & construction is an attribute of what delivery method? Substantiation The process of checking milestones along the way for completeness. Prescriptive Owner requiring specific products or methods be instituted by DB team in order to achieve desired performance. False T/F Detailed estimating is the Building systems approach to estimating False T/F feasibility estimate is cost model and establishes budget for project True T/F key element of quality assurance is keeping communication lines open between owner and DB True T/F in Design/cost relationship of DB, the constructor establishes design parameters for architect False T/F trust is most important thing for DB Schematic estimating DB estimating sequence where 15%-20% of design is completed Trend logs Provides baseline budgets and schedules and list estimate trends Committed Design Drawings and specs are approved by DOR and confirmed within budget Coordinating owner design reviews and approvals What is NOT a design managers role? Design Build Team Who is responsible for ensuring quality assurance? Direct DB When programming and design is developed by DB entity Spearin Doctrine Establishes that under DBB, owner is responsible for increased cost due to defective plans/specs Adjusted low bid Selection where qualitative aspects are scored out of 100 the divided by qualitative score Design criteria DB Owner defines performance data but DB Entity provides design solution Weighted criteria Awarded to proposer with highest combined total points of technical and price proposals Conceptual estimating Estimate provided with very little design

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

3/30/25, 9:25 DBIA: Principles of Design-Build and Post Award & Contracts |
AM
DBIA: PRINCIPLES OF DESIGN-BUILD AND POST AWARD & CONTRACTS
EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS
VERIFIED

Terms in this set (110)


Federal Government passed bond requiring payment and performance bonds on
Miller Act 1935
all public works, what year?

Brooks Bill 1972 Bill directing A/E's selected on qualifications, what year?

Clinger Cohen Act/Defense Procurement Allows all federal agencies to utilize Design-Build. Prior to that no enabling
Reform Act 1996 legislation existed allowing Design-Build.

The level of quality that any average Design Professional would be able to
Standard of Care
perform given the circumstances.

Slowest Project Delivery method, linear in nature, prescriptive (owner knows what
Design Bid Build
they want),

Multi Prime Project Delivery - Many contracts through Owner

Project Delivery method allowing the contractor to come on board very early in
CM at Risk design for preconstruction services yet maintains separation between Designer
and Builder contractually.

Fastest Project Delivery method, fast tracking possible overlapping design with
Design Build
construction utilizing incremental packages.

Low Bid Procurement Method - Most Familiar

Negotiated (Qualifications Based) Procurement Method - Common for A/E

Best Value Procurement Method - Qualifications and Price

Sole Source Procurement Method - Direct

Lump Sum Contract Format w/ agreed upon fixed price

Contract Format - contractor reimbursed for actual cost plus an agreed upon
Cost Plus Fee
percentage

Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for
GMP (Guaranteed Maximum Price)
actual cost plus a fee only up to a certain amount.

Unit Price Contract Format - cost per piece




1/
5

, 3/30/25, 9:25 DBIA: Principles of Design-Build and Post Award & Contracts |
AM
Contract Format - established cost/benchmark determined jointly by project
Target Price
team.

Trust, Flexibility Successful Design Build requires _____ &________between participants

Hammurabi Singular responsibility for both design & construction was first codified by ____

Owner provided items such as 20% design or more and provides prescriptive
Bridging Documents
specs at RFP.

Spearin Doctrine Owner is responsible for implied warranties in the sufficiency of the specifications.

Performance Requirements _______should identify end results.

Single point of responsibility for both design & construction is an attribute of what
Design Build
delivery method?

Substantiation The process of checking milestones along the way for completeness.

Owner requiring specific products or methods be instituted by DB team in order
Prescriptive
to achieve desired performance.

False T/F Detailed estimating is the Building systems approach to estimating

False T/F feasibility estimate is cost model and establishes budget for project

T/F key element of quality assurance is keeping communication lines open
True
between owner and DB

T/F in Design/cost relationship of DB, the constructor establishes design
True
parameters for architect

False T/F trust is most important thing for DB

Schematic estimating DB estimating sequence where 15%-20% of design is completed

Trend logs Provides baseline budgets and schedules and list estimate trends

Committed Design Drawings and specs are approved by DOR and confirmed within budget

Coordinating owner design reviews and What is NOT a design managers role?
approvals

Design Build Team Who is responsible for ensuring quality assurance?

Direct DB When programming and design is developed by DB entity

Establishes that under DBB, owner is responsible for increased cost due to
Spearin Doctrine
defective plans/specs

Selection where qualitative aspects are scored out of 100 the divided by
Adjusted low bid
qualitative score

Design criteria DB Owner defines performance data but DB Entity provides design solution

Awarded to proposer with highest combined total points of technical and price
Weighted criteria
proposals

Conceptual estimating Estimate provided with very little design

Trend estimating Maintains control of budget and design process between major estimate phases

Feasibility estimate Owner proforma based on sq ft or ROM estimates

Statement of qualifications Determines if proposer is qualified for project with yes or no statement

DBIA 501 Contract for Design-Build Consultant Services

DBIA 520 Standard Form of Preliminary Agreement Between Owner and Design-Builder

DBIA 525 Standard Form of Agreement Between Owner & Design-Builder for a Lump Sum

Standard Form of Agreement Between Owner & Design-Builder, Cost Plus Fee
DBIA 530
with an Option for a Guaranteed Maximum Price

Standard Form of General Conditions of Contract Between Owner & Design-
DBIA 535
Builder

DBIA 540 Standard Form of Agreement Between Design-Builder & Design Consultant,



2/
5

Geschreven voor

Vak

Documentinformatie

Geüpload op
31 maart 2025
Aantal pagina's
5
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
AcademicSuperScores Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
299
Lid sinds
3 jaar
Aantal volgers
37
Documenten
7648
Laatst verkocht
2 weken geleden
AcademicSuperScores

NURSING, ECONOMICS, MATHEMATICS, BIOLOGY AND HISTORY MATERIALS. BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS AND STUDY GUIDE MATERIALS WITH GUARANTEE OF A+ I am a dedicated medical practitioner with diverse knowledge in matters Nursing and Mathematics. I also have an additional knowledge in Mathematics based courses (finance and economics)

4.6

156 beoordelingen

5
125
4
9
3
11
2
5
1
6

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen