CMGT360 PROJECT DELIVERY SYSTEMS EXAM QUESTIONS AND
ANSWERS WITH COMPLETE SOLUTIONS VERIFIED GRADED A++
1. DESIGN-BUILD
2.DESIGN BID BUILD
WHAT ARE 5 DELIVERY SYSTEMS FOR
3.CM AT RISK
CONSTRUCTION
4. INTEGRATED PROJECT DELIVERY
5. PRIVATE PUBLIC PARTNERSHIP
PROCESS OF WORKING WITH THE DESIGN PHASE AND
WHAT DOES FT MEAN CONSTRUCTION PHASE AT THE SAME TIME. (OVERLAP)
(FASTTRACKING) DESIGN, PROCUREMENT, AND CONSTRUCTION.
ALL THREE MEMBERS WORK TOGETHER, OWNER-DESIGNER-
BUILDER. THE OWNER WORKS WITH TWO CONTRACTS
(SEPARATED)
DESIGN BID BUILD CONTRACT 1: DESIGN TEAM- CREATES THE DESIGN PLAN AND
SCHEMATICS FOR THE OWNER. (COMMUNICATION WITH THE OWNER.)
CONTRACT 2: THE CONTRACTOR (GC) BUILDER REVIEWS THE PROJECT
PLANS AND SCOPE TO PROPOSE A FINAL BID- START THE
CONSTRUCTION.
(LINEAR PHASE ORDER)
ALL THREE TEAM MEMBERS WORK TOGETHER: THE OWNER, THE
DESIGN TEAM, CM TEAM.
THE OWNER WORKS WITH TWO CONTRACTS (SEPARATED)
THERE IS INTERNAL COMMUNICATION BETWEEN THE CM AND THE
DESIGN TEAM.
CM AT RISK CONTRACT 1: DESIGN TEAM- CREATES THE DESIGN PLAN AND
SCHEMATICS FOR THE OWNER. (COMMUNICATION WITH THE OWNER.)
CONTRACT 2: THE CM REVIEWS THE PROJECT'S PLANS AND SCOPE TO
PROPOSE A FINAL BID- AND STARTS THE CONSTRUCTION. (DESIGN
CHANGES OR REVIEWS CAN BE MANAGED DURING THE DESIGN
PHASE- AND
CONSTRUCTION SERVICES) (LINEAR PHASE ORDER OR FASTTRACKED)
Two Team Members: Owner and the Design-Build Entity, There is one
contract. The owner develops the project requirements, finances the
project, makes design decisions, and manages the construction process.
Design Build Design Build Entity- (Contractor Team- develops and designs the project
as a unit, and provides programming and post-construction services to
the owner. The
communication with the owner is private and strategic; in a one-way
stop solution for the project. (FASTTRACKED)
This is a TEAM COLLABORATION, agreements with all stakeholders for
Integrated Project Delivery (IPD) a common goal/ everyone works in unison. The owner, CM/GC, A/E,
Subs all meet and share ideas. (FASTTRACKED)
Public Entities are under pressure from taxpayers; budge for the project
is main priority, funds are allocated by private investors for future
ownership and
Public/ Private Partnerships (PPP)
operations.
Projects Include: Highways/ bridges/ schools/ water treatment plants/
hospitals/ public infrastructures, global transportation work, airports.
The work is tailored to bundling of construction and operation.