Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CMGT 360 FINAL EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS VERIFIED

Rating
-
Sold
-
Pages
3
Grade
A+
Uploaded on
31-03-2025
Written in
2024/2025

CMGT 360 FINAL EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS VERIFIED Lump sum Most often used with the traditional delivery system this contract is where payment's based on the percentage of scope of work complete Cost plus fee This type of contract is used when the scope of work is not clearly defined. Owner pays for the cost of the work plus the contractor's fee Cost Plus Fee GMP this type of contract of contract is the same as the Cost Plus Fee contract but the contractor has a max ceiling price they can't exceed Unit Price this type of contract has the contractor provide unit costs to perform the scopes of work and the amount of work completed is tracked. Lump Sum Most risked contract for a contractor Cost Plus Fee Most risked contract for the owner Everybody Who is accountable for safety? Strategies to make Safety a priority 1. Discuss it regularly 2. Make it Personal 3. Implement Procedures Jobsite Orientation this meeting provides project specific safety communications to new personnel prior to stepping foot onsite. Job Hazard Analysis This is a process done at each jobsite where each trade plans out there work and identifies specific hazards associated with their tasks Weekly tailgate meetings Weekly these safety meetings involve each trade conducting meetings with their crews to review project specific safety hazards Jobsite safety audits These safety meetings consist of a walk-thru and inspections of the project site for any safety related deficiencies. This walk should be performed by every member on the project team Jobsite Safety Plan This plan for the jobsite is a safety plan created by the superintendent before the project starts that addresses typical safety topics Jobsite Safety Utilization Plan This safety plan is a graphic showing where safety related items are located onsite Schedule of Values This is a list of itemized costs for each project work scope that is used to track the amount billed for each work item against the budgeted costs for the work item Lump sum costs The costs are billed base on projected PERCENTAGE complete of a work item for the month Cost Plus Fee Costs The costs are based on ACTUAL costs incurred for the billing month Preliminary notice This is a notice required to be filed by a contractor to establish their right to file a Lien in the Event of Nonpayment. NOT REQUIRED Mechanic's Lien this is a security interest for contractors that perform work that they are unpaid for, requires payment to be processed Managing Project Costs 1. Prior to Project - Know the budget 2. During Construction - Manage the budget 3. After Construction - Closing out all job costs Managing Project Schedule 1. Prior to Construction - Develop good initial schedule - Identify long procurement items - Milestones? 2. During Construction - 3-week lookahead - Project Master states critical path activities and update schedule monthly 3. After Construction - Punch list items -Turnover Package GC & Subcontractor Foremen Who are the last planners? LPS differences the last planner system makes individuals responsible for putting the work in place and there is a more collaborative process to plan and control the project Pull Planning This process of the Last Planner system involves collaboration between the GC and subcontractor foreman to compile the construction schedule Weekly Work Plans this process of the Last Planner system involves weekly meetings with the last planners to revisit the project schedule and make needed adjustments Daily Huddles this process of the last planner system involves daily check-ins on progress of production

Show more Read less
Institution
Course

Content preview

3/30/25, 9:34 CMGT 360 Final Flashcards |
AM

CMGT 360 FINAL EXAM QUESTIONS AND ANSWERS WITH
COMPLETE SOLUTIONS VERIFIED
Most often used with the traditional delivery system this contract is where
Lump sum
payment's based on the percentage of scope of work complete

This type of contract is used when the scope of work is not clearly defined.
Cost plus fee
Owner pays for the cost of the work plus the contractor's fee

this type of contract of contract is the same as the Cost Plus Fee contract but
Cost Plus Fee GMP
the contractor has a max ceiling price they can't exceed

this type of contract has the contractor provide unit costs to perform the scopes
Unit Price
of work and the amount of work completed is tracked.

Lump Sum Most risked contract for a contractor

Cost Plus Fee Most risked contract for the owner

Everybody Who is accountable for safety?

1. Discuss it regularly
Strategies to make Safety a priority 2.Make it Personal
3.Implement Procedures

this meeting provides project specific safety communications to new personnel
Jobsite Orientation
prior to stepping foot onsite.

This is a process done at each jobsite where each trade plans out there work
Job Hazard Analysis
and identifies specific hazards associated with their tasks

Weekly these safety meetings involve each trade conducting meetings with
Weekly tailgate meetings
their crews to review project specific safety hazards

These safety meetings consist of a walk-thru and inspections of the project site for
Jobsite safety audits any safety related deficiencies. This walk should be performed by every member
on the project team

This plan for the jobsite is a safety plan created by the superintendent before
Jobsite Safety Plan
the project starts that addresses typical safety topics

Jobsite Safety Utilization Plan This safety plan is a graphic showing where safety related items are located onsite

This is a list of itemized costs for each project work scope that is used to track the
Schedule of Values
amount billed for each work item against the budgeted costs for the work
item
The costs are billed base on projected PERCENTAGE complete of a work item for
Lump sum costs
the month

Cost Plus Fee Costs The costs are based on ACTUAL costs incurred for the billing month

This is a notice required to be filed by a contractor to establish their right to file
Preliminary notice
a Lien in the Event of Nonpayment. NOT REQUIRED

this is a security interest for contractors that perform work that they are unpaid for,
Mechanic's Lien
requires payment to be processed

1. Prior to Project - Know the budget


Managing Project Costs 2.During Construction - Manage the budget


3.After Construction - Closing out all job costs




1/
3

Written for

Course

Document information

Uploaded on
March 31, 2025
Number of pages
3
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AcademicSuperScores Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
302
Member since
3 year
Number of followers
37
Documents
7671
Last sold
2 days ago
AcademicSuperScores

NURSING, ECONOMICS, MATHEMATICS, BIOLOGY AND HISTORY MATERIALS. BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS AND STUDY GUIDE MATERIALS WITH GUARANTEE OF A+ I am a dedicated medical practitioner with diverse knowledge in matters Nursing and Mathematics. I also have an additional knowledge in Mathematics based courses (finance and economics)

4.6

156 reviews

5
125
4
9
3
11
2
5
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions