he purpose of Construction Quality Management is to: - CORRECT ANSWER- Achieve the
T
quality established by properly developed requirements through the combined responsibility, but
separate efforts of contractor and government personnel.
onstruction Quality Management is the performance of tasks, which ensure that construction is
C
performed. - CORRECT According to plans and specifications, on time, within a defined budget
and in a safe work environment.
artnering relationships are based upon: - CORRECT ANSWER-Building trust and dedication
P
to common goals
It is the responsibility of Quality Assurance Personnel to: - CORRECT ANSWER- Periodically
verify that the contractor's system of control is working effectively.
n effective contractor quality control program will: - CORRECT ANSWER- Be an incentive for
A
work to be done correctly the first time resulting in earlier completion, reduced field overhead
costs, and greater profits.
he success or failure of all contractors is based upon: - CORRECT ANSWER-The ability to
T
control costs, finance work, estimate jobs, schedule the work, and maintain effective quality
control.
uality Assurance Personnel have the responsibility to: - CORRECT ANSWER-Require
Q
contractors to maintain the quality specified in the plans and specifications.
Inspection is: - CORRECT ANSWER-The process by which ongoing and completed work is
examined
uring the punch-out inspection of a project: - CORRECT ANSWER- Quality Assurance
D
Personnel must ensure that the contractor prepares a punch list and makes corrections.
If there is a disagreement whether the contractor's work complies with the contract: -
CORRECT ANSWER-The government makes the final determination
, haracteristics that describe a definable feature of work include: - CORRECT
C
ANSWER-Cross-referenced listings to the contractor's construction schedule that may have
more than one definable feature under a section of the specifications.
he _____________________ consists of daily checks of the work to ensure continuing
T
compliance with contract requirements. - CORRECT ANSWER-Follow-up phase
he Quality Assurance Plan: - CORRECT ANSWER-Is a government management tool
T
establishing staffing, training, pre-award activities, and surveillance activities.
esting is extremely important in construction quality management and is performed by: -
T
CORRECT ANSWER-Both the contractor and the government
If the contractor does not provide an adequate superintendent, the contract allows the
contracting officer to: - CORRECT ANSWER-Require the contractor to assume personal
supervision of the work.
he Quality Control Plan: - CORRECT ANSWER-Is the foundation upon which quality work is
T
based and outlines planned quality control procedures.
nannounced tests, randomly performed, and repeat quality control tests are: - CORRECT
U
ANSWER-Quality Assurance tests
If an initial review of the quality control plan shows it to be unacceptable: - CORRECT The
contractor makes changes before acceptance.
he contractor quality control organization: - CORRECT ANSWER- may vary in size depending
T
on the work being performed at a point in time.
he Quality Control Plan contains: - CORRECT ANSWER-Identification of individual quality
T
control personnel, including name, qualifications, assigned duties, responsibilities and
authorities.
he preconstruction conference and the coordination and mutual understanding meeting (Navy)
T
are: - CORRECT conducted prior to the commencement of any physical construction work.
cumulative list of job deficiencies/rework items can be found in: - CORRECT ANSWER-A
A
deficiency tracking system/reworks items list.
hat is a purpose of the coordination and mutual understanding and meeting (Navy)? -
W
CORRECT ANSWER-To review the QC Plan with the contractor.
hich of the following is included in all three phases of the Three Phases of Control. -
W
CORRECT ANSWER-Safety.