CORRECT VERIFIED ANSWERS
Which AT program element involves a risk assessment and
risk planning?
Risk Management
Inspector General Checklist 3302 Antiterrorism is a checklist
used by command Functional Area Managers and Inspectors
and applies to all types and levels of command.
True
The risk management focused data management system which
is designed to provide operational and contingency planning
support for multiple MA and RM tasks and requirements is the
_________________________.
MCCAMS-NG
FPCON _____________________ applies when a terrorist attack or
hostile act has occurred or is anticipated against specific
installations or operating areas.
Delta
, All Hazard Threat Assessment (AHTA) would involve which of
the following
All of the aboe
Assets can be _________________.
All of the above
Emergency lockdown procedures, discussed during this
course, are typically used during what event?
Active Shooter scenario
What is the first step in the Terrorist Planning Cycle?
Broad Target Selection
Which of the below scenarios would you Shelter In Place
(SIP)?
To shelter from chemical, radiological, or biological
contaminants.
What is a Mission Essential Task (MET)?