What is the Instruction for Antiterrorism (AT) program? - Answers DoDI 2000.12
How many AT Standards are in the DoD antiterrorism program? - Answers 32
Name the DIA Terrorist Threat levels in the proper order from lowest to highest. - Answers Low,
Moderate, Significant, High
What practice, in conjunction with site-specific FPCON measures, is employed in a manner that portrays
a robust security posture from which terrorists cannot easily discern security AT and security patterns or
routines? - Answers RAMs
What are the five essential elements of the AT program? - Answers Risk Management, Planning, Training
and Exercise, Resource Application, Comprehensive AT Review
The components of Risk Assessment can be generally defined/identified as - Answers Criticality x
threats/hazards x vulnerability = risk
Unlike counterterrorism, antiterrorism is defensive in nature.. Which measure below should be the
focus to project a "Hard Target" for a facility, compound, or installation? - Answers Deterrence
Threat Working Groups shall meet at least _________________ or more frequently depending upon
level of threat activity. - Answers Quarterly
The Level II AT Officer manages the unit AT program; advises the Commander on AT issues; and can
provide a Level I Awareness Training? - Answers True
A process to protect or ensure the continued function and resilience of capabilities and assets - including
personnel, equipment, facilities, networks, information and information systems, infrastructure, and
supply chains is called what? - Answers Mission Assurance
What action is the last resort during an Active Shooter scenario? - Answers Fight
Which AT program element involves a risk assessment and risk planning? - Answers Risk Management
Inspector General Checklist 3302 Antiterrorism is a checklist used by command Functional Area
Managers and Inspectors and applies to all types and levels of command. - Answers True
The risk management focused data management system which is designed to provide operational and
contingency planning support for multiple MA and RM tasks and requirements is the
_________________________. - Answers MCCAMS-NG
FPCON _____________________ applies when a terrorist attack or hostile act has occurred or is
anticipated against specific installations or operating areas. - Answers Delta
All Hazard Threat Assessment (AHTA) would involve which of the following - Answers All of the aboe