1.6 gallon or less flush commodes are required on facilities that use holding tanks ANS✅ true
access must be provided within 24 inches of surface grade to outlet end man hole of septic tank
ANS✅ false
alarms may either be visible or audible + shall not be placed in high traffic areas ANS✅ false
all distribution boxes shall be installed level ANS✅ true
all electrical wiring for on site sewage disposal system shall comply with national electrical code
ANS✅ true
all finished grading shall be done to divert surface water towards lateral line ANS✅ false
all holding tanks shall be sized to hold a minimum of 7 day storage capacity ANS✅ false
all nonperforated pipe shall be bedded in grillage ANS✅ true
all perforated pipe used for gravity flow systems shall meet the ASTM=F810 standards for rigid
piping + ASTM-F405 for corrugated semi-rigid piping. ANS✅ true
all pretreatment units + distribution boxes are required to have KY approval numbers on them
ANS✅ true
back filling of system is permitted prior to final inspection providing inspections ports are placed
in lateral trenches ANS✅ false
back hoe pits may be required by inspector on site of evaluation ANS✅ true
car washes, slaughter houses, factories, funeral parlors can produce waste that are not allowed
to be disposed in an on site sewage disposable system ANS✅ true
certified installer must lay out a septic system prior to evacuation to assure that adequate fall
between components is possible ANS✅ true
certified installer must lay out on site sewage system to determine if adequate fall is possible
between components ANS✅ true
certified installer must submit proposed system drawing prior to obtaining instillation permit
ANS✅ true
certified installer not responsible for backfilling or finished grading over system if builder does
work ANS✅ false
, certified installer or permit holder is required to remain on construction site while work is being
performed on system ANS✅ true
certified installer shall complete an installers affidavit for every system or shall request an initial
inspection to be performed by certified inspector ANS✅ true
compacting fill soil 95% can be used in lieu of letting the fill settle for 1 year period ANS✅ false
corrugated polyethylene pipe can be used between distribution box + lateral trenches ANS✅
false
curtain drain bottoms shall be graded to provide positive drainage down slope to surface or a
catchment basin ANS✅ true
distribution boxes shall be installed level with all connections rendered watertight ANS✅ true
dosing siphons may be used in lieu of dosing pumps where elevations allow for adequate fall
ANS✅ true
dosing tank man holes shall be brought within 12 inches of surface grade ANS✅ false
dosing tanks are required to have separate electrical circuits for pump + alarm ANS✅ true
drip irrigation is experimental onsite sewage disposable system option ANS✅ false
drip irrigation system include
a. advance treatment
b. air release valve
c. grinder pump
d. all above
e. a + b ANS✅ e. a + b
a. advance treatment
b. air release valve
equal flow type distribution boxes shall be placed on stable base ANS✅ true
equal-flow type distribution boxes may be installed on tamped sand or gravel ANS✅ true
equipment used in constructing aseptic system should be:
a. as heavy as possible to maximize soil compaction
b. as light as possible to minimize soil compaction