The damaged top rail X below is to be repaired by sectioning.
g g g g g g g g g g g g
Care must be taken to ensure that damage area X is NOT cut l
g g g g g g g g g g g g g
ess than a minimum of
g g g g
A. 50mm (2 in) g g
B. 100mm (4 in) g g
C. 150mm (6 in) g g
D. 200mm (9 in) - ✔✔✔ Correct Answer > C. 150mm (6 in)
g g g g g g g g g g g
Rework of previously straightened panels is required when
g g g g g g g
A. evidence of considerable hammer marks is present
g g g g g g
B. the owner's policy requires repair
g g g g
C. the straightened area is an incorrect color
g g g g g g
D. original profile of the corrugation is changed -
g g g g g g g
✔✔✔ Correct Answer > B. the owner's policy requires repair
g g g g g g g g g g
,Which of the following is an example of a plank floor condition re
g g g g g g g g g g g g
quiring repair AND which should be considered as damage?
g g g g g g g g
A. A crack or split with no evidence of impact, which leaks light
g g g g g g g g g g g
B. A crack or split with a sign of impact which does not leak light
g g g g g g g g g g g g g
C. A crack or split, adjacent to a dented bottom rail, which leaks l
g g g g g g g g g g g g
ight
D. A crack or split, with no evidence of impact, with a loose piec
g g g g g g g g g g g g
e- g
✔✔✔ Correct Answer > C. A crack or split, adjacent to a dented
g g g g g g g g g g g g g
bottom rail, which leaks light
g g g g g
Welds to corner fittings should be made with?
g g g g g g g
A. CO2 semi-automatic welding
g g
B. Low hydrogen welding rods
g g g
C. Fully automatic welding
g g
D. Arc welding -g g
✔✔✔ Correct Answer > B. Low hydrogen welding rods
g g g g g g g g g
Door gaskets that are cut may be repaired by using cyanoacrylat
g g g g g g g g g g
e adhesives to bond together the cut edges of the gasket, PROVI
g g g g g g g g g g g
DED
(I) No gasket material is missing
g g g g
(II) The cut edges of the gasket mate together
g g g g g g g
,(III) The cyanoacrylate adhesive will fill voids that exist at the j
g g g g g g g g g g
oint
A. I only g
B. I and II only
g g g
C. II and III only
g g g
D. I, II and III -
g g g g
g ✔✔✔ Correct Answer > (I) No gasket material is missing
g g g g g g g g g
(II) The cut edges of the gasket mate together
g g g g g g g g
B. I and II only
g g g g
With wooden flooring, height variance between adjacent planks
g g g g g g g
or panels is limited to
g g g g g
A. 5 mm (3/16 in)
g g g g
B. 10 mm (3/8 in)
g g g g
C. 15 mm (9/16 in)
g g g g
D. 20 mm (3/4 in) - ✔✔✔ Correct Answer > A. 5 mm (3/16 in)
g g g g g g g g g g g g g g
In the Guide for Container Damage Measurement, IICL recomme
g g g g g g g g
nds a standardized procedure using set "reference
g g g g g g
, dimensions" to determine if panel bows exceed ISO tolerances
g g g g g g g g g
plus an additional IICL tolerance. The reference dimension for a
g g g g g g g g g
n outward bow in a side panel is
g g g g g g g
A. 5 mm (3/16 in)
g g g g
B. 10 mm (3/8 in)
g g g g
C. 13 mm (1/2 in)
g g g g
D. 18 mm (11/16 in) -
g g g g g
✔✔✔ Correct Answer > D. 18 mm (11/16 in)
g g g g g g g g g
Each of the following components has a single 30 mm (1 1/4 in) d
g g g g g g g g g g g g g
ent. Which one requires repair?
g g g g
A. Corner post
g g
B. Door panel
g g
C. Roof bow
g g
D. Bottom side rail - ✔✔✔ Correct Answer > A. Corner post
g g g g g g g g g g g
For which of the following repairs does IICL recommend the use
g g g g g g g g g g g
of pre-blasted steel?
g g
A. Sectioning of a tube-type top side rail 3 m (10 ft ) in length
g g g g g g g g g g g g g g
B. Replacement of a side panel 122 x 244 cm (4 x 8 ft)
g g g g g g g g g g g g g
C. Inserting of a front corner post 182 cm (6 ft) in length on a h
g g g g g g g g g g g g g g g
igh-cube container g