Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

ASPHALT PAVING LEVEL 1 AND LEVEL 2 EXAM STUDY GUIDE AND PRACTICE EXAM 2025/2026 | ACCURATE REAL EXAM QUESTIONS WITH VERIFIED ANSWERS | EXPERT VERIFIED FOR A GUARANTEED PASS | LATEST UPDATE

Rating
-
Sold
1
Pages
5
Grade
A+
Uploaded on
06-04-2025
Written in
2024/2025

ASPHALT PAVING LEVEL 1 AND LEVEL 2 EXAM STUDY GUIDE AND PRACTICE EXAM 2025/2026 | ACCURATE REAL EXAM QUESTIONS WITH VERIFIED ANSWERS | EXPERT VERIFIED FOR A GUARANTEED PASS | LATEST UPDATE /A full lot of super pave asphalt is what size? 1,000 tons 1,000 to 2000 tons 2000 to 4000 tons 1 days production - Answer-2000 to 4000 tons /.Which is not typically used as an asphalt binder in fdot mix designs? PG 52-28 PG 58-22 PG 62-22 PG 76-22(PMA) PG 82-22 (PMA) - Answer-PG 62-22 /.Who cuts the density cores used for verification testing? The verification technician The contractor The independent verification testing technician None of the above - Answer-The contractor /.A full lot is composed of 5 sublots and 4 cores per lot T/F - Answer-False /.What is the most important for consistent compaction of asphalt mix? The mix is hotter in temperature The mix is colder in temperature The mix is uniform in temperature Temperature of the mix does not affect compaction - Answer-The mix is uniform in temperature /.Referring to general stationing guidelines, R1 would be ____ than R2 Closer to centerline Closer to outside shoulder Closure to the inside shoulder Both A and C - Answer-Both A and C /.While using the rolling straightedge, if the needle goes in the red zone indicating an unacceptable high spot in the section, you then - Answer-Mark the pavement where the needle first goes into the red zone and place another mark where the needle leaves the red zone and continue /.For bridge approach slabs, the 15 foot manual straightedge should be set so ____ is on the bridge deck. 1 inch Exactly 1/2 of the straightedge The entire straightedge None of the above - Answer-1 inch /.For the first transverse joint on a project place the ___ on the new pavement while overlapping the transverse joint by one inch. 4 foot level 15 foot manual straight edge Rolling straightedge All the above - Answer-15 foot manual straight edge /.When calibrating to check the low side of the rolling straight edge: Place shims under the outer wheels Place the rolling straight edge on a surface that looks flat Place a 3/16 inch shin under each outside wheel, the gauge should read zero on both sides of the gauge Place shims under the center wheel - Answer-Place a 3/16 inch shin under each outside wheel, the gauge should read zero on both sides of the gauge /.When calibrating to check the high side of the rolling straight edge: Place shims under the outer wheels Place shims under the center wheel Place the rolling straight edge on a surface that looks flat Place a 3/16 inch shin under the center wheel. The gauge should read zero on both sides of the gauge. - Answer-Place a 3/16 inch shim under the center wheel. The gauge should read zero on both sides of the gauge. /.What do you need to know when manually checking the cross slope? The level length The lane width Height from the end of the level to pavement surface The diameter of the bubble in the level - Answer-Level length and height from the end of level to pavement surface /.When paving 5 foot wide shoulders or open-graded friction course FC-5 cores should be taken at the frequency of... 1 per 100 feet 5 per lot 5 per sub lot

Show more Read less
Institution
ASPHALT PAVING LEVEL 1 AND LEVEL 2
Course
ASPHALT PAVING LEVEL 1 AND LEVEL 2

Content preview

ASPHALT PAVING LEVEL 1 AND LEVEL 2 EXAM STUDY
GUIDE AND PRACTICE EXAM 2025/2026 | ACCURATE
REAL EXAM QUESTIONS WITH VERIFIED ANSWERS |
EXPERT VERIFIED FOR A GUARANTEED PASS | LATEST
UPDATE

/A full lot of super pave asphalt is what size?
1,000 tons
1,000 to 2000 tons
2000 to 4000 tons
1 days production - Answer-2000 to 4000 tons

/.Which is not typically used as an asphalt binder in fdot mix designs?
PG 52-28
PG 58-22
PG 62-22
PG 76-22(PMA)
PG 82-22 (PMA) - Answer-PG 62-22

/.Who cuts the density cores used for verification testing?
The verification technician
The contractor
The independent verification testing technician
None of the above - Answer-The contractor

/.A full lot is composed of 5 sublots and 4 cores per lot T/F - Answer-False

/.What is the most important for consistent compaction of asphalt mix?
The mix is hotter in temperature
The mix is colder in temperature
The mix is uniform in temperature
Temperature of the mix does not affect compaction - Answer-The mix is uniform in
temperature

/.Referring to general stationing guidelines, R1 would be ____ than R2
Closer to centerline
Closer to outside shoulder
Closure to the inside shoulder
Both A and C - Answer-Both A and C

/.While using the rolling straightedge, if the needle goes in the red zone indicating an
unacceptable high spot in the section, you then - Answer-Mark the pavement where the

, needle first goes into the red zone and place another mark where the needle leaves the
red zone and continue

/.For bridge approach slabs, the 15 foot manual straightedge should be set so ____ is
on the bridge deck.
1 inch
Exactly 1/2 of the straightedge
The entire straightedge
None of the above - Answer-1 inch

/.For the first transverse joint on a project place the ___ on the new pavement while
overlapping the transverse joint by one inch.
4 foot level
15 foot manual straight edge
Rolling straightedge
All the above - Answer-15 foot manual straight edge

/.When calibrating to check the low side of the rolling straight edge:
Place shims under the outer wheels
Place the rolling straight edge on a surface that looks flat
Place a 3/16 inch shin under each outside wheel, the gauge should read zero on both
sides of the gauge
Place shims under the center wheel - Answer-Place a 3/16 inch shin under each outside
wheel, the gauge should read zero on both sides of the gauge

/.When calibrating to check the high side of the rolling straight edge:
Place shims under the outer wheels
Place shims under the center wheel
Place the rolling straight edge on a surface that looks flat
Place a 3/16 inch shin under the center wheel. The gauge should read zero on both
sides of the gauge. - Answer-Place a 3/16 inch shim under the center wheel. The gauge
should read zero on both sides of the gauge.

/.What do you need to know when manually checking the cross slope?
The level length
The lane width
Height from the end of the level to pavement surface
The diameter of the bubble in the level - Answer-Level length and height from the end of
level to pavement surface

/.When paving 5 foot wide shoulders or open-graded friction course FC-5 cores should
be taken at the frequency of...
1 per 100 feet
5 per lot
5 per sub lot
1 per 1000 feet

Written for

Institution
ASPHALT PAVING LEVEL 1 AND LEVEL 2
Course
ASPHALT PAVING LEVEL 1 AND LEVEL 2

Document information

Uploaded on
April 6, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$14.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainariam Harvard University
Follow You need to be logged in order to follow users or courses
Sold
148
Member since
1 year
Number of followers
7
Documents
8375
Last sold
1 day ago

Our store offers a wide selection of materials on various subjects and difficulty levels, created by experienced teachers. We specialize on NURSING,WGU,ACLS USMLE,TNCC,PMHNP,ATI and other major courses, Updated Exam, Study Guides and Test banks. If you don't find any document you are looking for in this store contact us and we will fetch it for you in minutes, we love impressing our clients with our quality work and we are very punctual on deadlines. Please go through the sets description appropriately before any purchase and leave a review after purchasing so as to make sure our customers are 100% satisfied. I WISH YOU SUCCESS IN YOUR EDUCATION JOURNEY

Read more Read less
3.3

25 reviews

5
8
4
2
3
8
2
3
1
4

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions