g g g
UAL 2025) Questions And Corr
g g g g
ect VERIFIED Answers
g g
,A flashing arrow panel used on high speed, high volume roadw
g g g g g g g g g g
ays must be what size?
g g g g
A. 60" x 30" g g
B. 96" x 48" g g
C. 48" x 24" g g
D. 118" x 60" - <<<Answers>>>96" x 48"
g g g g g g
What would the merging taper length be for a flagger taper be if
g g g g g g g g g g g g
the speed limit was 55 mph on a 12' wide lane?
g g g g g g g g g g g
A. 700'
B. 100'
C. 660'
D. 500' - <<<Answers>>>100'
g g
If less than 90% of the pixels per character are operating in th
g g g g g g g g g g g g
e PCMS, it is considered a marginal quality standard.
g g g g g g g g
A. True
B. False - <<<Answers>>>False
g g
What is the minimum merging taper length for one 12' lane clos
g g g g g g g g g g g
ure on 55 MPH Multi-Lane Divided Highway?
g g g g g g
A. 660
,B. 550
C. 1020
D. 700 - <<<Answers>>>660
g g
Spalls greater than
g g g
on temporary barrier is considered
g g g g g
unacceptable.
A. 0.5"
B. 1"
C. 1.5"
D. 6" - <<<Answers>>>1.5"
g g
How many drums are needed in a 1,200 FT Tangent Section on
g g g g g g g g g g g g
a 65 MPH Highway?
g g g
A. 25
B. 10
C. 16
D. 40 - <<<Answers>>>10
g g
While adjusting Sign spacing to avoid conflict with existing
g g g g g g g g g
signs, g
is the minimum spacing to existing signs for spe
g g g g g g g g
eds of 45 MPH or less.
g g g g g
A. 100'
B. 200'
C. 300'
, D. 400' - <<<Answers>>>200'
g g
A minimum of
g g g
drums shall be used to close upstream
g g g g g g g
shoulder.
A. 5
B. 8
C. 10
D. We don't need to close the shoulder while we are closing t
g g g g g g g g g g g
he lane. - <<<Answers>>>5
g g g
Shadow vehicle is optional for Mobile Operations on 2-
g g g g g g g g
Lane Road g
A. True
B. False - <<<Answers>>>false
g g
128. The maximum width of Portable Barrier Wall opening
g g g g g g g g
between the impact attenuator and the outside edge of the pa
g g g g g g g g g g
ved shoulder shall be
g . g g g
A. 5'
B. 10'
C. 9'
D. 12' - <<<Answers>>>9'
g g