Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

MAN 4580 Final questions with verified answers

Rating
-
Sold
-
Pages
22
Grade
A+
Uploaded on
09-04-2025
Written in
2024/2025

MAN 4580 Final questions with verified answers

Institution
Course

Content preview

MAN 4580 Final questions with verified answers
(T/F) A time-phased budget is created before the project schedule when the
budget is constrained, and time is accepted. Ans✓✓✓ false


10 Golden Rules of project risk management Ans✓✓✓ 1) make risk management
part of your project 2) identify risks early in your project 3) Communicate about
risks 4) consider both threats and opportunities 5) clarify ownership issues 6)
prioritize risks 7) analyze risks 8) plan and implement risk responses 9) register
project risks 10) track risks and associated tasks


2 examples of time-based resources Ans✓✓✓ office space and equipment rented


3x3 Risk Matrix Ans✓✓✓ Y (probability), X (Impact) rated L, M, H


A key principle of agile project management is that Ans✓✓✓ something of value
will be delivered at the end of each sprint


Abusive manner Ans✓✓✓ Conduct that results in physical harm or creates
intense feelings of fear, humiliation, manipulation, or exploitation in another
person


Action Ans✓✓✓ make a decision


Actual cost (AC) Ans✓✓✓ (Basic) How much the completed work costs.

,Adopting proven technology instead of experimental technology in order to
eliminate technical failure would be an example of which risk response?
Ans✓✓✓ avoiding


After the project scope has been defined and the project schedule has been
created, the next step in our planning is Ans✓✓✓ to determine the project
budget


Agile Ans✓✓✓ high-level planning for the entire project at the start with more
detailed planning in increments. Deliverables delivered in short periods. Added to
in future.


Agile Philosophy Ans✓✓✓ 1) importance placed on people and interaction 2)
produce a product, not documentation 3) customer collaborates throughout
project 4) changes are expected and welcome


Agile projects handle changes mostly by planning Ans✓✓✓ just one iteration at a
time in great detail and trying hard not to accept changes within the iteration


All activities are shown both on a daily/weekly/monthly and Ans✓✓✓ cumulative
basis


All of the following are ways to control risk EXCEPT: A) Assign team members to
monitor risks B) Develop a response plan prior to an incident occurring C) Have
one team member be responsible for monitoring big risks D) Periodically identify
if new risks surface Ans✓✓✓ C) Have one team member be responsible for
monitoring big risks

, All of the project costs should be assembled into a(n) Ans✓✓✓ Time-phased
budget


Alternatives Ans✓✓✓ consider your choices


ANALogous estimating Ans✓✓✓ estimating based on data from past, similar
work activities. It is not costly or time consuming. It looks at the amount past
projects cost while accounting for any differences with the new project. Unless
previous projects are extremely similar, this method be kinda booty compared to
the other estimation methods


Analysis Ans✓✓✓ identify your candidate decision and test its validity


Application Ans✓✓✓ apply ethical principles to your candidate decision


As a project progresses closer to completion, the chance of risk Ans✓✓✓
decrease, however, the cost to fix a risk event if it occurs increases


Assessment Ans✓✓✓ make sure you have all the facts about the ethical dilemma


Before you begin your project, you want to identify any potential risks that you
may run into. All of the following techniques would help you to identify risks
except: A) Parametric Techniques B) Checklist Analysis C) SWOT Analysis D) Expert
Judgement Ans✓✓✓ A) Parametric Techniques


Before you can finalize the budget, you need to Ans✓✓✓ finalize the other
planning

Written for

Institution
Course

Document information

Uploaded on
April 9, 2025
Number of pages
22
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$16.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
cracker Chamberlain School Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
2124
Member since
3 year
Number of followers
1347
Documents
49852
Last sold
19 hours ago
✨ Cracker – Verified Study Powerhouse

Welcome to your shortcut to academic and certification success. I'm Cracker, a trusted top seller I specialize in high-quality study guides, test banks, certification prep, and real-world exam material all tailored to help you pass fast and score high.

3.8

385 reviews

5
169
4
89
3
54
2
24
1
49

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions