AM
KENTUCKY BOILER EXAM REVIEW QUESTIONS AND ANSWERS WITH
COMPLETE SOLUTIONS VERIFIED LATEST UPDATE
Practice questions for this set
Learn 1/7 Study using Learn
T/F: License Is issued to a person designated as a license holder, and remains with that
person, regardless of change of an employer
Select the correct term
130 days
2True
3True 4NBIC
Don't know?
Terms in this set (50)
A license is required when a person/firm
- installs a boiler
-repairs a boiler
All of the above
- installs an unfired boiler
- repairs an unfired boiler
- all of the above
T/F: License Is issued to a person designated as a license holder, and remains
True
with that person, regardless of change of an employer
A contractor may apply for a re-reinstatement of a license after how many days
90 days
from the day the suspension?
False, installers do not need a license T/F: All on-site workers are also be required to be a licensed.
No, you cannot sub out boiler installation As a license holder, can you pull a permit and then sub out the installation work?
work.
Permit is required for the installation of a:
- boiler pressure vessel or pressure pipe
All of the above - replacement of pressure piping
- water heaters less than 15 psi
- All of the above
In emergency repair, permit first authorized by the board inspector, or a special
30 days
bore inspector shall be filed within or completed by...
When should a license holder submit a permit request for installation of a board
Prior to installation
press reversal or piping to the department for approval?
T/F: A license holder may place boiler pressure vessel or pressure piping into
False
service prior to contacting the inspector
1/
3