PM
Save
CON 237 EXAM QUESTIONS AND ANSWERS
WITH COMPLETE SOLUTIONS VERIFIED
Terms in this set (66)
You have a requirement for Simplified acquisition procedures can be used.
telecommunications components. A
single telecommunications manufacturer
provides all of these components to the
general public. The estimated cost of
these components is $145,000.
You have a request for hand-held rocket Simplified acquisition procedures can be used for only if the mission is considered
launchers for operations in Zagota. A declared contingency operation
similar item has been used by another
branch of the military and should be
adaptable for your needs. The
approximate cost of the launchers is
$300,000.
A non-developmental item is: Any previously developed item used exclusively for governmental purposes.
Which type of item is LEAST preferred Developmental item
for satisfying Government
requirements?
Which of the following should NOT The number of people in the contracting office
affect how market research is
performed?
Which of the following are acceptable All techniques listed are acceptable
market research techniques?
.***NOT: Does not apply to micro-purchases
The use of required sources:
>Applies to all requirements
What should be the last source to Commercial sources
consider when trying to fulfill a
requirement?
Micro-purchases are: Unrestricted
What source should contracting officers ***NOT: Federal Procurement Data System (FPDS)
use as their primary source of vendor
information?
The public works department at your The Governmentwide commercial purchase card.
Federal facility needs to buy repair
parts for a water fountain in the
building. The parts will cost about
$100 and can be
bought at Nuts-n-Bolts Hardware. Which
method of purchase is preferred?
1/
7
, 4/12/25, 7:00 CON 237 Flashcards |
PM
Your base commander wants 25 The Governmentwide commercial purchase card
employees in the personnel department
to attend a 1-day time-management
seminar. The cost per employee will be
$75 each. What is the preferred method
of purchase?
If available, practicable, and cost Electronic Commerce (EC)
effective; what is a preferred method of
solicitation when conducting simplified
acquisitions over the micro-purchase
threshold?
What is the preferred method of ?Purchase order
solicitation for requirements over
$25,000?
A public announcement by publishing a Acquisitions expected to exceed 25,000.
synopsis in the GPE is normally required
for:
You have a new requirement for True
something you have bought before
using SAP. The action does not need
to be synopsized and there are
currently no standing price quotes.
You should request quotations or
offers from at least three sources; if
practicable, from
two sources not included in the previous
solicitation.
The contracting officer shall evaluate ...
quotations or offers inclusive of
transportation charges from the
shipping point of the supplier to the
delivery destination.
An offeror's experience as an evaluation Their history of completing similar contracts and quality of their performance.
factor consists primarily of:
You have a requirement to buy janitorial Past performance
services for your facility. There has been
a history of performance and customer
service problems with the present and
past contractors. Your evaluation criteria
for the follow-on solicitation should
contain a factor for:
In acquisitions for commercial items, the Consistent with customary commercial practice.
terms of an express warranty should be:
In order to use simplified acquisition CANNOT exceed the simplified acquisition threshold, except for certain
procedures (SAP), the aggregate value commercial items.
of the acquisition and all its options:
You have a request to buy 30 units of SAP cannot be used
commercially available machining
equipment. Each unit is estimated to cost
approximately $300,000.
2/
7