Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

VIRGINIA HOME IMPROVEMENT CONTRACTOR EXAM WITH VERIFIED ANSWERS FOR A GUARANTEED PASS

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
15-04-2025
Written in
2024/2025

VIRGINIA HOME IMPROVEMENT CONTRACTOR EXAM WITH VERIFIED ANSWERS FOR A GUARANTEED PASS What is directly affected by the surface and subsurface conditions of the building site? Foundations - While the type and size of a structure will partly determine the type of foundation, the foundation itself is very much affected by the surface and subsurface conditions of the building site. What term is used to describe the act of removing air pockets from setting concrete? Vibrating Concrete - Consolidation is a process that removes air pockets and forces the concrete into all parts of the forms. Which of the following is not a part of a masonry arch? Radius Anchor bolts should be spaced no more than __' apart and no more than __" from the ends of any plate section or wall corner. Each bolt must extend at least __" into the concrete. 6, 12, 7 In Southern Coastal areas, where should the vapor barrier be placed? The exterior of the wall. If butt joints occur when applying gypsum panels to wood and steel framing stagger and locate them as far from the ___ of walls and ceilings as possible. Center A minimum temperature of ___ should be maintained during gypsum board application. 50°F What is the maximum allowable span for cold-formed steel joists size 800S162-43 loaded with a live load of 40 PSF and spaced 16 inches OC? 13′-5″ What is the recommended spacing at all panel edge and end joints when positioning plywood subfloor? 1/8" Which of the following is NOT a purpose of wall sheathing? It helps distribute structural loads that do not fall directly over studs. What is the minimum clearance between the stopping point of a built-up girder and the masonry pocket? 1/2" A deck attached to the back of a house is framed with southern pine 2x10s. The joists are 16 inches OC. What is the maximum allowable clear span for the joists supporting this deck? 14 feet 0 inches Openings which provide access to all under-floor spaces through a perimeter wall shall be not less than inches. 16 X 24 Which type of building material allows water vapor to pass through but not water? Housewrap Opening for under-floor space vents must be covered with material with a least dimension of? 1/4" The triangular openings formed by the riser, tread and bottom rail of a guard at the open side of a stairway are permitted to be of such a size that a sphere inches cannot pass through. 6 What is the typical height of a regular base kitchen cabinet? 34-1/2" Handrails on a ramp adjacent to a wall must have a space of not less than inches between the wall and the handrails. 1.5 A nosing projection not less than inch(es) but not more than inch

Show more Read less
Institution
Virginia Home Improvement Contractor
Course
Virginia home improvement contractor

Content preview

VIRGINIA HOME
IMPROVEMENT CONTRACTOR
EXAM WITH VERIFIED
ANSWERS FOR A
GUARANTEED PASS 2024-2025

What is directly affected by the surface and subsurface conditions of the
building site?

Foundations - While the type and size of a structure will partly determine the
type of foundation, the foundation itself is very much affected by the surface
and subsurface conditions of the building site.




What term is used to describe the act of removing air pockets from setting
concrete?

Vibrating Concrete - Consolidation is a process that removes air pockets and
forces the concrete into all parts of the forms.




Which of the following is not a part of a masonry arch?

Radius




Anchor bolts should be spaced no more than __' apart and no more than __"
from the ends of any plate section or wall corner. Each bolt must extend at
least __" into the concrete.

, 6, 12, 7




In Southern Coastal areas, where should the vapor barrier be placed?

The exterior of the wall.




If butt joints occur when applying gypsum panels to wood and steel framing
stagger and locate them as far from the ___ of walls and ceilings as possible.

Center




A minimum temperature of ___ should be maintained during gypsum board
application.

50°F




What is the maximum allowable span for cold-formed steel joists size
800S162-43 loaded with a live load of 40 PSF and spaced 16 inches OC?

13′-5″




What is the recommended spacing at all panel edge and end joints when
positioning plywood subfloor?

1/8"




Which of the following is NOT a purpose of wall sheathing?

Written for

Institution
Virginia home improvement contractor
Course
Virginia home improvement contractor

Document information

Uploaded on
April 15, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Nursehellen Western Governers University
Follow You need to be logged in order to follow users or courses
Sold
75
Member since
2 year
Number of followers
32
Documents
915
Last sold
5 days ago
NurseHellen

Academics we all know has never been any simpler without a workable strategy. Here I NurseHellen do strive to provide as many Questions and Answer strategy as possible to facilitate smooth reading for you. All the best in your papers. Go for the degree. Go for the certification. Cheers guys. Am ever here for you.

4.5

15 reviews

5
12
4
1
3
0
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions