5 steps of ORM (operational risk management) Correct
Answers identify hazard (identify)
assess hazard (assess)
make risk decision (make risk)
implement control (implement)
supervise
a calendar periodicity states "Q". what is the schedule time
between checks? Correct Answers 3 months
a caution tag is used whenever? Correct Answers Precautionary
measures, to provide temporary special instructions as needed
a job priority stating highly desirable requires? Correct Answers
A CASREP
A MRC with a periodicity of 2M should be accomplished how
often? Correct Answers every 2nd month
a non calendar periodicity states "U". therefore the maintenance
is? Correct Answers unscheduled
a warning tag tells that sailor what? Correct Answers injury to
personal
a work center can take credit for PMS (planned maintenance
system) check if how many % of the check is complete? Correct
Answers 100%
, an MRC has the total man hours as 2.7, how many minutes is
that? Correct Answers 162
color of caution tag? Correct Answers yellow
color of danger tag? Correct Answers red
CSMP is used to show? Correct Answers Status of a job in the
system
during what step do you verify the force revision? Correct
Answers LOEP to change of plans
equipment should be placed on IEM (inactive equipment
management) status II when? Correct Answers equipment is
not going to be used for 7 days or more and is scheduled for
overhaul
from the last check, when would the next check with a
periodicity code of 24M-6 be? Correct Answers every 24
months
how do you check on ordered parts? Correct Answers OMMS-
NG (organizational material management system - next
generation)
how do you verify change pages? Correct Answers by using
the LOEP
how often should PMS check M-9R be accomplished? Correct
Answers once per month as required