AIC Actual Exam Complete Questions with Correct Detailed Verified Answers Already Graded A+ Newest 2025 Brand New!! 29. The construction contract requires the contractor to submit a complete schedule. This draft so far includes work activities, their duration, and milestones. Which of the following other information is necessary to develop this schedule? a. OSHA inspections b. Procurement of long lead items c. Schedule of values d. List of payment application document. --- correct answer ---b. Procurement of long lead items 30. In creating a schedule, which of the following occurs first? a. Develop the logic b. Perform the duration calculations c. Identify the activities b.Input the information into the network --- correct answer ---c. Identify the activities

Show more Read less
Institution
AIC
Course
AIC

Content preview

AIC Actual Exam Complete Questions with
Correct Detailed Verified Answers Already
Graded A+ Newest 2025 Brand New!!


29. The construction contract requires the contractor to submit a
complete schedule. This draft so far includes work activities, their
duration, and milestones. Which of the following other information is
necessary to develop this schedule?




a. OSHA inspections

b. Procurement of long lead items

c. Schedule of values

d. List of payment application document. --- correct answer ---b.
Procurement of long lead items



30. In creating a schedule, which of the following occurs first?



a. Develop the logic

b. Perform the duration calculations

c. Identify the activities

,b.Input the information into the network --- correct answer ---c.
Identify the activities




31. Who is responsible for inspecting for safety risks on a project prior
to operation?



a. Project superintend

b. Company safety officer

c. Structural steel Forman

d. Designated competent person. --- correct answer ---d. Designated
competent person.




32. What format is based on the CSI conceptual estimating systems?



a. Uniformat

b. Section format

c. Master format

d. Project Manuel format --- correct answer ---c. Master format

,33. What is the best action for a contractor to take concerning a
project that is one month behind schedule due to incomplete and late
architectural drawings?




a. Work overtime to meet the completion date and not bid for the
premium time.

b. Updated the schedule and notify the owner of the options and
associated costs

c. Inform all subs that the schedule must be made and extra
compensation will be paid

d. Create a revised construction schedule with the assistance of the
architect --- correct answer ---b. Updated the schedule and notify the
owner of the options and associated costs



34. When the start of one activity depends on the completion of the
preceding activity, the relationship on a logic network of the two
activities is a



a. Finish to Finish

b. Finish to Start

c. Start to Finish

d. Start to Start --- correct answer ---b. Finish to Start

, 35. To conduct an effective team meeting, it is best to



a. Develop an agenda for own use only

b. Develop a list of topics for the agenda at the begging of the meeting
so that everyone has input.

c. Hand out an agenda and see the team member has it prior to the
meeting so they can come prepared.

d. Develop an agenda and see that team members have it prior to the
meeting so they can come prepared --- correct answer ---c. Hand out
an agenda and see the team member has it prior to the meeting so
they can come prepared.




36. A light fixture slides of the electrical subcontractors scaffolding in
the lobby of a new bank building. The result is several hundred dollars
in damage to the floor finish. Workers below could have been hit by
the falling fixture. Which of the following is the best course of action
to take?




a. Proceed with electrical installation after the subcontractor has
cleaned the area

b. Ensure presence of OSHA approved railing, toe boarding and netting
on all scaffolds

Written for

Institution
AIC
Course
AIC

Document information

Uploaded on
April 22, 2025
Number of pages
117
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$18.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PASSINGMASTER01 Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
515
Member since
4 year
Number of followers
341
Documents
2998
Last sold
4 days ago
TIGHT DEADLINE? I CAN HELP Many students don't have the time to work on their academic papers due to balancing with other responsibilities, for example, part-time work. I can relate. kindly don't hesitate to contact me, my study guides, notes and exams

QUALITY DOCUMENTS FOR BEST RESULTS. In my page you will find latest Exams ,Assignments, Test Banks, Exam Elaboration, test with Questions and Answers, Discussions, Case Studies, package deals, etc. I upload quality. Instant delivery.

3.8

47 reviews

5
24
4
7
3
5
2
3
1
8

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions