1Who is authorized to conduct tag outs Where two types of procedures that may
2be accessed from maintenance procedure option
3What do you clean a battery terminal with What is the acceptable leakage rate for the
4screw type hydraulic pump shaft seal
Don't know?
Terms in this set (160)
what are two types of maintenance Corrective and preventative
What article always captain to conduct Article 15
NJP
Where two types of procedures that may Official and local
be accessed from maintenance
procedure option
Who is authorized to conduct tag outs Authorizing officer
1/
5
, 4/17/25, 8:03
AM
Out of calibration tags should be used When indicating parameter errors are small and consistent
when
For modernized units the boat inspection Almis/ EALpage
reports are to be entered through
Cutter engineering report shall be Naval engineering manual chapter 90
completed in accordance with
On an MPC the warning shall come Before the instruction
where in the text
On an MPC what would constitute an Rags
expendable
PMS that does not need to be included in Daily and weekly
the cutter engineering report is
With regards to casreps what is REF
mandatory on all updates corrects and
cancellations
Which unit besides a shore unit are Cutter underway
exempt from filling out the POSIT line
A casrep it should be made as soon as 24
possible no later than_hours
Casualties that effect a secondary mission 2
should always have a casualty category of
AMPN is mandatory after any set that Other, tech, none
contains an entry of?
In a 1PARTSID if the NIIN is not known Unknown
what needs to be put in the line
The delay expressed an hours, and correcting the casualty due to parts
What is the criteria for submitting
unavailability, a list of all parts requested and dates received; the total number
CASCOR
of man-hours expanded; the number of equipment hours since last failure
You find something else wrong with the Update
piece of equipment that has already been
CASREP'd you should send an?
Where do you find the hierarchy of NEM chapter 41
guidance for specification plans
Which specifications may be used as a GSO
guided researching propose engineering
changes and solutions
Which specification do not apply to Commercial general specifications for t-ships
construction, alteration or maintenance of
Coast Guard cutters
Where do you find the authorized Naval engineering manual chapter 634
material list for deck coverings
110 - WPB - 521-01, what does 5 21 SW BS number
represent
Enthusiasm for realistic drills must State of the crew
outweigh sound judgment, or sound
evaluation of the______
Casualty control is used for what type of Operational and battle
casualties
How do you connect the battery in Positive to positive negative to negative
parallel