ANSWERS 100% UPDATED!
What is a general requirement of the location of the installation of
a boiler? - ANSWER--Adequate clearance from combustile
construction
What temperature must the materials remain under during
combustion? - ANSWER--170 degrees
What is a requirement for the access of the boiler? - ANSWER--
Access for operation and maintenance must not be hazardous
What is required upon installation to operate a boiler? -
ANSWER--Inspection and test resulting in equipment use permit
from commissioner
How often should a boiler be inspected? - ANSWER--Once a year
What documentation is required from a certificate holder? -
ANSWER--Owners annual statement
What is required to hydrostatically test upon installation and who
should perform these tests? - ANSWER--Liquid fuel piping and
fuel oil storage tanks by the installing contractor
At what pressure should piping be tested? - ANSWER--1/2 max
working pressure but less than pressure required for storage tank
, FDNY P-99 C OF F EXAM 2025 QUESTIONS &
ANSWERS 100% UPDATED!
At what pressure should oil storage tanks be tested? - ANSWER--
At 1 1/2x max working pressure but never < 25 psi
How long should hydrostatic pressure be maintained? -
ANSWER--Until all joints and connections are inspected for leaks
and at 30 minutes have passed
Who is responsible for testing gas distribution piping? - ANSWER-
-Installing contractor before closing and operation
What is described on instruction cards and where are they
located? - ANSWER--Care and operation of oil burner located
near the equipment.
What type of burners require a C of F holder to operate them? -
ANSWER--Any boiler that is not automatic or requires preheating.
What is the license holder responsible for after repair? -
ANSWER--Inspecting the repairs, and functioning of all control
devices and positioning of valves.
What type of heat and combustion equipment are required with
the air pollution control code? - ANSWER--All burners fire with
solid, liquid, or gas. Including rubbish burners/incinerators.