When delay is due to cause, beyond the control of both the owner and
m m m m m m m m m m m m m
mthe contractor, an extension in contract time in the amount equal to t
m m m m m m m m m m m m
he time lost on the critical path shall be the contractor's sole and excl
m m m m m m m m m m m m m
usive remedy for such delay.
m m m m
True False - ✔✔✔ Correct Answer > True
m m m m m m m
The traditional delivery system is characterized by executing the major
m m m m m m m m m m
phases of a project in: m m m m
A) An overlapping concept
m m
B) A linear sequence
m m
C) A fast track method
m m m
D) All of the above - ✔✔✔ Correct Answer > B) A linear sequence
m m m m m m m m m m m m
The most common basis of CM liability to a trade contractor with who
m m m m m m m m m m m m
m the CM has no contractual relationship is negligent performance of t
m m m m m m m m m m m
he CM's:
m
A) Cost estimating m
,B) Inspection of work m m
C) Project coordination and scheduling
m m m
D) All of the above -
m m m m
m✔✔✔ Correct Answer > C) Project coordination and scheduling
m m m m m m m m
A key advantage of the traditional delivery approach is:
m m m m m m m m
A) With the traditional delivery system, the cost of the constructio
m m m m m m m m m
n phase is known before construction starts.
m m m m m m
B) Facility features are fully determined & specified.
m m m m m m
C) When the construction contract is signed, the major risk belongs t
m m m m m m m m m m
o the contractor.
m m
D) All of the above -
m m m m
m✔✔✔ Correct Answer > B) Facility features are fully determined
m m m m m m m m m m
& specified.
m
The sole source of a CM's liability is to its client. Tr
m m m m m m m m m m m
ue False - ✔✔✔ Correct Answer > True
m m m m m m m
A CM's liability is determined solely by whether or not the CM perform
m m m m m m m m m m m m
ed according to the required standard of care.
m m m m m m m
True False - ✔✔✔ Correct Answer > False
m m m m m m m
To the extent that a CM assumes the designer's responsibilities for cost
m m m m m m m m m m m
mestimates, the CM faces the same liability as similarly situated designe
m m m m m m m m m m
rs.
,True False - ✔✔✔ Correct Answer > True
m m m m m m m
In the absence of both a limit on construction costs and a warranty fo
m m m m m m m m m m m m m
r the accuracy of the cost estimate, a project cost overrun will cause t
m m m m m m m m m m m m m
he CM to lose their fee.
m m m m m
True False - ✔✔✔ Correct Answer > False
m m m m m m m
Most owner- m
CM contracts commonly state that the CM's contractual obligations are
m m m m m m m m m
msolely for the benefit of the owner.
m m m m m m
True False - ✔✔✔ Correct Answer > True
m m m m m m m
Most publicly funded projects require which of the following inclusions
m m m m m m m m m m
as part of their contract obligations?
m m m m m
A) BIM model m
B) Performance bond m
C) Mock-up model m
D) LEED Gold - ✔✔✔ Correct Answer > B) Performance bond
m m m m m m m m m
A Public-
m
Private Partnership (P3) project is usually considered by a public entity
m m m m m m m m m m m
for which of the following primary reasons:
m m m m m m
A) Better design m
B) Incorporate environmental requirements m m
C) Lack of funding m m
, D) Meet sustainability goals -
m m m
m✔✔✔ Correct Answer > C) Lack of funding
m m m m m m m
What is the main advantage of private sector firms in managing their pr
m m m m m m m m m m m m
ocurement process? m
A) Price
B) Contract terms m
C) Bonding
D) Flexibility - ✔✔✔ Correct Answer > D) Flexibility
m m m m m m m
Once the PMP is written and approved, it should not be changed.
m m m m m m m m m m m m
True False - ✔✔✔ Correct Answer > False
m m m m m m m
What is one of the primary owner benefits of program management?
m m m m m m m m m m
A) Contractor selection m
B) Leveraged purchasing m
C) Partnering
D) Aligned dispute resolution - m m m
m✔✔✔ Correct Answer > B) Leveraged purchasing
m m m m m m
Project management and program management are similar in that the
m m m m m m m m m
y both use
m m . m
A) Lean Six Sigma m m