Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CMIT EXAM NEWEST 2024 ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) ALREADY GRADED A+.pdf

Beoordeling
5.0
(2)
Verkocht
-
Pagina's
49
Cijfer
A+
Geüpload op
26-04-2025
Geschreven in
2024/2025

CMIT EXAM NEWEST 2024 ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) ALREADY GRADED A+.pdf

Instelling
Vak

Voorbeeld van de inhoud

CMIT EXAM STUDY | NEWEST ACTUAL m m m m m




EXAM COMPREHENSIVE QUESTIONS A m m m




ND VERIFIED ANSWERS GRADED A+ | 1
m m m m m m




00% PASS | 2025 UPDATE! m m m m




When delay is due to cause, beyond the control of both the owner and
m m m m m m m m m m m m m



mthe contractor, an extension in contract time in the amount equal to t
m m m m m m m m m m m m



he time lost on the critical path shall be the contractor's sole and excl
m m m m m m m m m m m m m



usive remedy for such delay.
m m m m




True False - ✔✔✔ Correct Answer > True
m m m m m m m




The traditional delivery system is characterized by executing the major
m m m m m m m m m m



phases of a project in: m m m m




A) An overlapping concept
m m




B) A linear sequence
m m




C) A fast track method
m m m




D) All of the above - ✔✔✔ Correct Answer > B) A linear sequence
m m m m m m m m m m m m




The most common basis of CM liability to a trade contractor with who
m m m m m m m m m m m m



m the CM has no contractual relationship is negligent performance of t
m m m m m m m m m m m



he CM's:
m




A) Cost estimating m

,B) Inspection of work m m




C) Project coordination and scheduling
m m m




D) All of the above -
m m m m



m✔✔✔ Correct Answer > C) Project coordination and scheduling
m m m m m m m m




A key advantage of the traditional delivery approach is:
m m m m m m m m




A) With the traditional delivery system, the cost of the constructio
m m m m m m m m m



n phase is known before construction starts.
m m m m m m




B) Facility features are fully determined & specified.
m m m m m m




C) When the construction contract is signed, the major risk belongs t
m m m m m m m m m m



o the contractor.
m m




D) All of the above -
m m m m



m✔✔✔ Correct Answer > B) Facility features are fully determined
m m m m m m m m m m


& specified.
m




The sole source of a CM's liability is to its client. Tr
m m m m m m m m m m m




ue False - ✔✔✔ Correct Answer > True
m m m m m m m




A CM's liability is determined solely by whether or not the CM perform
m m m m m m m m m m m m



ed according to the required standard of care.
m m m m m m m




True False - ✔✔✔ Correct Answer > False
m m m m m m m




To the extent that a CM assumes the designer's responsibilities for cost
m m m m m m m m m m m



mestimates, the CM faces the same liability as similarly situated designe
m m m m m m m m m m



rs.

,True False - ✔✔✔ Correct Answer > True
m m m m m m m




In the absence of both a limit on construction costs and a warranty fo
m m m m m m m m m m m m m



r the accuracy of the cost estimate, a project cost overrun will cause t
m m m m m m m m m m m m m



he CM to lose their fee.
m m m m m




True False - ✔✔✔ Correct Answer > False
m m m m m m m




Most owner- m



CM contracts commonly state that the CM's contractual obligations are
m m m m m m m m m



msolely for the benefit of the owner.
m m m m m m




True False - ✔✔✔ Correct Answer > True
m m m m m m m




Most publicly funded projects require which of the following inclusions
m m m m m m m m m m



as part of their contract obligations?
m m m m m




A) BIM model m




B) Performance bond m




C) Mock-up model m




D) LEED Gold - ✔✔✔ Correct Answer > B) Performance bond
m m m m m m m m m




A Public-
m



Private Partnership (P3) project is usually considered by a public entity
m m m m m m m m m m m



for which of the following primary reasons:
m m m m m m




A) Better design m




B) Incorporate environmental requirements m m




C) Lack of funding m m

, D) Meet sustainability goals -
m m m



m✔✔✔ Correct Answer > C) Lack of funding
m m m m m m m




What is the main advantage of private sector firms in managing their pr
m m m m m m m m m m m m



ocurement process? m




A) Price
B) Contract terms m




C) Bonding
D) Flexibility - ✔✔✔ Correct Answer > D) Flexibility
m m m m m m m




Once the PMP is written and approved, it should not be changed.
m m m m m m m m m m m m




True False - ✔✔✔ Correct Answer > False
m m m m m m m




What is one of the primary owner benefits of program management?
m m m m m m m m m m




A) Contractor selection m




B) Leveraged purchasing m




C) Partnering
D) Aligned dispute resolution - m m m



m✔✔✔ Correct Answer > B) Leveraged purchasing
m m m m m m




Project management and program management are similar in that the
m m m m m m m m m



y both use
m m . m




A) Lean Six Sigma m m

Gekoppeld boek

Geschreven voor

Vak

Documentinformatie

Geüpload op
26 april 2025
Aantal pagina's
49
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$20.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Beoordelingen van geverifieerde kopers

Alle 2 reviews worden weergegeven
7 maanden geleden

11 maanden geleden

5.0

2 beoordelingen

5
2
4
0
3
0
2
0
1
0
Betrouwbare reviews op Stuvia

Alle beoordelingen zijn geschreven door echte Stuvia-gebruikers na geverifieerde aankopen.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
PROFfESORMcCullough Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
10
Lid sinds
1 jaar
Aantal volgers
0
Documenten
501
Laatst verkocht
1 week geleden

4.8

367 beoordelingen

5
329
4
23
3
7
2
7
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen