Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

VA DEQ SWM INSPECTOR EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS VERIFIED

Beoordeling
-
Verkocht
-
Pagina's
9
Cijfer
A+
Geüpload op
26-04-2025
Geschreven in
2024/2025

VA DEQ SWM INSPECTOR EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS VERIFIED Leave the first rating Terms in this set (63) What element is targeted by water quality criteria? Phosphorous, it indicates pollution by bonding with other pollutants. At what % impervious cover are streams substantially affected? 25% what is the site-based load limit for water quality? 0.41 lbs/acre/yr total phosphorous Virginia Runoff Reduction Method- method of load calculations load calculations based on land cover type and soil type. what must happen to potentially harmful sheet flow runoff? Must be diverted to stormwater conveyance system. SWM ponds must be able to convey water safely up to what level storm event? must be able to safely convey up to a 100 yr storm. Define LDA Land disturbing activity; any man-made change to the land surface that potentially changes its runoff characteristics; includes clearing, grading, and excavation. What size LDA must comply with stormwater management regulation? in CPBA areas? anything of 1 acre or more, or 2500 ft^2 in CPBA areas; may be more stringent locally. what are some activities exempt from SWM regulations? mining, agriculture, sewer discharges, local reclamation programs, routine maintenance of preexisting operations, public emergency activity what term basically means a plea deal for stormwater offenders? consent order, which replaces penalties with fines. how long does VSMP authority have to review SWM plan? 15 days to review and determine approval, and notify applicant. How often must a VSMP authority inspect an LDA? Periodically. all SWPPP requirements may be met by incorporating other plans into reference, or by developing missing elements. What must the DEQ issue to an operator before an LDA? a construction GP How soon after final grade of a site must vegetation be put in place? within 7 days. How long must operator keep routine inspection reports? At least 3 years after the GP expires/terminates. How long does operator have to revise SWPPP if authority deems it necessary? How long does local authority have to review any modifications to SWPPP? 7 days for operator to make changes, 60 days for authority to review changes.

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

4/26/25, 9:36 VA DEQ SWM Inspector Exam Flashcards |
AM



VA DEQ SWM INSPECTOR EXAM QUESTIONS AND ANSWERS WITH
COMPLETE SOLUTIONS VERIFIED
Leave the first rating
Save




Terms in this set (63)


What element is Phosphorous, it indicates pollution by bonding with
targeted by water other pollutants.
quality criteria?
At what % impervious 25%
cover are streams
substantially
affected?
what is the site-based 0.41 lbs/acre/yr total phosphorous
load limit for water
quality?
Virginia Runoff load calculations based on land cover type and soil
Reduction Method- type.
method of load
calculations
what must happen to Must be diverted to stormwater conveyance system.
potentially harmful
sheet flow runoff?
SWM ponds must be must be able to safely convey up to a 100 yr storm.
able to convey water
safely up to what
level storm event?


Land disturbing activity; any man-made change to the
1/
9

, 4/26/25, 9:36 VA DEQ SWM Inspector Exam Flashcards |
AM
Define LDA land surface that
potentially changes its runoff characteristics;
includes clearing, grading, and excavation.
What size LDA must anything of 1 acre or more, or 2500 ft^2 in
comply with CPBA areas; may be more stringent locally.
stormwater
management
regulation? in CPBA
areas?
what are some mining, agriculture, sewer discharges, local
activities exempt from reclamation programs, routine maintenance
SWM regulations? of preexisting operations, public emergency
activity
what term basically consent order, which replaces penalties with fines.
means a plea deal for
stormwater
offenders?
how long does VSMP 15 days to review and determine approval, and notify
authority have to applicant.
review SWM plan?
How often must a VSMP Periodically.
authority inspect an
LDA?
all SWPPP requirements incorporating other plans into reference, or by
may be met by developing missing elements.
What must the DEQ a construction GP
issue to an operator
before an LDA?
How soon after final within 7 days.
grade of a site must
vegetation be put in
place?
How long must At least 3 years after the GP expires/terminates.
operator keep routine
inspection reports?

2/
9

Geschreven voor

Vak

Documentinformatie

Geüpload op
26 april 2025
Aantal pagina's
9
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
NurseAdvocate chamberlain College of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
497
Lid sinds
2 jaar
Aantal volgers
77
Documenten
12046
Laatst verkocht
5 dagen geleden
NURSE ADVOCATE

I have solutions for following subjects: Nursing, Business, Accounting, statistics, chemistry, Biology and all other subjects. Nursing Being my main profession line, I have essential guides that are Almost A+ graded, I am a very friendly person: If you would not agreed with my solutions I am ready for refund

4.6

239 beoordelingen

5
193
4
14
3
15
2
6
1
11

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen