VA DEQ ESC INSPECTOR EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS VERIFIED Leave the first rating Terms in this set (104) VESCP Virginia Erosion and Sediment Control Program - Administered by counties/cities (must), towns (may) - MUST BE APPROVED Minimum Standard 1 Stabilization permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days; permanent stabilization shall be applied to areas that are to be left dormant for more than one year Site NOT at Final Grade - stabilize in 14 days - temporarily seed - mulch - permanently stabilize if dormant 1 year Site at Final Grade - stabilize in 7 days (recommended immediately) - permanently or temporarily seed and mulch - mulch/matting/straw Minimum Standard 2 Stock Piles, Waste and Borrow Areas during construction, soil stock piles and borrow areas shall be stabilized or protected with sediment trapping measures mulch prevents erosion by protecting the surface from raindrop impact and silt fence intercepts and detains from disturbed areas Minimum Standard 3 Permanent Vegetation permanent vegetation cover shall be established on denuded areas not otherwise permanently stabilized (permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive, and will inhibit erosion there is no % associated with this) reduce erosion and decrease sediment yield from disturbed area this is the standard used to verify that a site is ready for release of bonds or surety Minimum Standard 4 First-Step Measures Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land- disturbing activity and shall be made functional before upslope land disturbance takes place a certain amount of initial land disturbance may be required to provide access for equipment to install the perimeter controls, but site clearing and grading should be kept to a minimum until the perimeter controls are in place intercepts and detains small amounts of sediment from disturbed areas during construction operation to prevent sediment from leaving the site and decrease velocity of sheet flows and low-to-moderate level channel flow Perimeter Controls assures that sediment does not leave the perimeter of the land-disturbing area once site clearing, grading, and construction commences Examples: silt fences, sediment traps, sediment basins, construction entrance, temporary diversions, diversions Minimum Standard 5 Earthen Structure Stabilization stabilization measures shall be applied to earthen structures such as dams, dikes, and diversions immediately after installation reduce erosion and sedimentation and reduce damage from sediment and runoff to downstream or off-site areas Minimum Standard 6 Traps and Basins sediment traps and basins shall be designed and constructed based upon the total drainage area (not just disturbed area) to be served by the trap or basin Sediment Traps minimum storage capacity shall be 134 cubic yards per acre of drainage area and shall only control drainage areas less than 3 acres stone outlet = trap Sediment Basins surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to 3 acres shall be controlled by a basin; minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area; the outfall system shall, at a minimum, maintain the structural integrity of the basin during a 25-year storm of 24-hour duration; runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. Sediment Trapping Devises 1. place near the lowest drainage points of a project 2. install as a first-step measure [MS-4] 3. stabilize immediately [MS-5] 4. must include outlet protection for basins [MS-11]

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

4/26/25, 9:36 VA DEQ ESC Inspector Exam Flashcards |
AM




VA DEQ ESC INSPECTOR EXAM QUESTIONS AND
ANSWERS WITH COMPLETE SOLUTIONS VERIFIED
Leave the first rating
Save




Terms in this set (104)


Virginia Erosion and Sediment Control
Program
VESCP
- Administered by counties/cities (must), towns
(may)
- MUST BE APPROVED

Stabilization

permanent or temporary soil
stabilization shall be applied to
Minimum Standard 1
denuded areas within seven days after
final grade is reached on any portion of
the site; temporary soil stabilization
shall be applied within seven days to
denuded areas that may not be at final
grade but will remain dormant for
longer than 14 days; permanent
stabilization shall be applied to areas
that are to be left dormant for more
than one year
- stabilize in 14 days
- temporarily seed
Site NOT at Final
1/39

,4/26/25, 9:36 VA DEQ ESC Inspector Exam Flashcards |
AM
Grade - mulch
- permanently stabilize if dormant > 1 year




- stabilize in 7 days (recommended
Site at Final Grade immediately)
- permanently or temporarily seed and mulch

- mulch/matting/straw

Stock Piles, Waste and Borrow Areas

during construction, soil stock piles and
Minimum Standard 2 borrow areas shall be stabilized or
protected with sediment trapping
measures

mulch prevents erosion by protecting
the surface from raindrop impact and
silt fence intercepts and detains from
disturbed areas
Permanent Vegetation

permanent vegetation cover shall be
established on denuded areas not
otherwise permanently stabilized
Minimum Standard 3 (permanent vegetation shall not be
considered established until a ground
cover is achieved that is uniform, mature
enough to survive, and will inhibit
erosion there is no % associated with
this)

reduce erosion and decrease sediment yield
from disturbed area

this is the standard used to verify that a site is
ready for release of bonds or surety
First-Step Measures

Sediment basins and traps, perimeter
2/39

,4/26/25, 9:36 VA DEQ ESC Inspector Exam Flashcards |
AM
dikes, sediment barriers and other
measures intended to trap sediment
shall be constructed as a first step in
any land- disturbing activity and shall
Minimum Standard 4 be made functional before upslope land
disturbance takes place

a certain amount of initial land
disturbance may be required to provide
access for equipment to install the
perimeter controls, but site clearing and
grading should be kept to a minimum
until the perimeter controls are in place

intercepts and detains small amounts of
sediment from disturbed areas during
construction operation to prevent
sediment from leaving the site and
decrease velocity of sheet flows and
low-to-moderate level channel flow
assures that sediment does not leave
the perimeter of the land-disturbing
Perimeter Controls area once site clearing, grading, and
construction commences

Examples: silt fences, sediment traps,
sediment basins, construction entrance,
temporary diversions, diversions
Earthen Structure Stabilization

stabilization measures shall be applied to
Minimum Standard 5 earthen structures such as dams, dikes,
and diversions immediately after
installation

reduce erosion and sedimentation and
3/39

, 4/26/25, 9:36 VA DEQ ESC Inspector Exam Flashcards |
AM
reduce damage from sediment and
runoff to downstream or off-site areas
Traps and Basins

Minimum Standard 6 sediment traps and basins shall be
designed and constructed based upon
the total drainage area (not just
disturbed area) to be served by the
trap or basin
minimum storage capacity shall be 134
cubic yards per acre of drainage area
Sediment Traps
and shall only control drainage areas
less than 3 acres

stone outlet = trap
surface runoff from disturbed areas that
is comprised of flow from drainage
areas greater than or equal to 3 acres
Sediment Basins shall be controlled by a basin; minimum
storage capacity of a sediment basin
shall be 134 cubic yards per acre of
drainage area; the outfall system shall,
at a minimum, maintain the structural
integrity of the basin during a 25-year
storm of 24-hour duration; runoff
coefficients used in runoff calculations
shall correspond to a bare earth
condition or those conditions expected
to exist while the sediment basin is
utilized.


1. place near the lowest drainage points of a
project

2. install as a first-step measure [MS-4]
Sediment Trapping
Devises
4/39

Geschreven voor

Vak

Documentinformatie

Geüpload op
26 april 2025
Aantal pagina's
39
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
NurseAdvocate chamberlain College of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
497
Lid sinds
2 jaar
Aantal volgers
77
Documenten
12046
Laatst verkocht
4 dagen geleden
NURSE ADVOCATE

I have solutions for following subjects: Nursing, Business, Accounting, statistics, chemistry, Biology and all other subjects. Nursing Being my main profession line, I have essential guides that are Almost A+ graded, I am a very friendly person: If you would not agreed with my solutions I am ready for refund

4.6

239 beoordelingen

5
193
4
14
3
15
2
6
1
11

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen