Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

VA DEQ SWM INSPECTOR EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS VERIFIED

Beoordeling
-
Verkocht
-
Pagina's
5
Cijfer
A+
Geüpload op
26-04-2025
Geschreven in
2024/2025

VA DEQ SWM INSPECTOR EXAM QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS VERIFIED Leave the first rating Erosion and sediment control plans and stormwater management plans SWPPP plans that must be approved Post-construction When the stormwater management plan address runoff Volume and velocity of stormwater runoff increases as natural vegetation is replaced with these surfaces. The increase in stormwater runoff leads to an increase in pollutants, such as sediment and phosphorus that are carried to waterways. Impervious cover Target pollutant in the water quality criteria Phosphorus The lower limit of the range of imperviousness that can result in stream degradation% 10% SWM regulation ensures water quantity is considered to protect against which two destructive forces? Channel erosion and flooding This increases after development because of the replacement of vegetation with impervious surfaces. A larger volume of water will travel more quickly through a stream channel, potentially causing erosion and flooding. The rate of runoff A what must be at least as stringent as the Construction GP (9VAC)? Locality VSMP ESC Plan and SWM Plan (9VAC) Plans a locality's ordinance must require to be submitted and approved. No state registration statement; no SWPPP; incomplete SWPPP; SWPPP not available for review; no approved ESC plan; failure to install stormwater management BMPs or ESCs; stormwater BMPs or erosion and sediment controls improperly installed or maintained; operation deficiencies; failure to conduct required inspections; incomplete, improper, or missed inspections Violations for which a penalty may be imposed $32500 Maximum penalty a locality can impose under the stormwater act Three years from date of project completion or state permit termination How long a locality VSMP authority must hold on to a registration statement

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

4/26/25, 9:36 VA DEQ SWM Inspector Flashcards |
AM




VA DEQ SWM INSPECTOR EXAM QUESTIONS AND ANSWERS
WITH COMPLETE SOLUTIONS VERIFIED
Leave the first rating
Save




Erosion and sediment SWPPP plans that must be approved
control plans and
stormwater
management plans
Post-construction When the stormwater management plan address
runoff
Volume and velocity of Impervious cover
stormwater runoff
increases as natural
vegetation is
replaced with these
surfaces. The
increase in stormwater
runoff leads to an
increase in pollutants,
such as sediment and
phosphorus that are
carried to
waterways.
Target pollutant in the Phosphorus
water quality criteria
The lower limit of the 10%
range of
imperviousness that can
result in stream
degradation%
SWM regulation ensures Channel erosion and flooding
1/
5

, 4/26/25, 9:36 VA DEQ SWM Inspector Flashcards |
AM
water quantity is
considered to protect
against which two
destructive forces?
This increases after The rate of runoff
development because
of the replacement of
vegetation with
impervious surfaces.
A larger volume of
water will travel more
quickly through a
stream channel,
potentially causing
erosion and flooding.
A what must be at least Locality VSMP
as stringent as the
Construction GP
(9VAC25-870-106)?
ESC Plan and SWM Plan Plans a locality's ordinance must require to be
(9VAC25-870- 148) submitted and approved.




2/
5

Geschreven voor

Vak

Documentinformatie

Geüpload op
26 april 2025
Aantal pagina's
5
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$12.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
NurseAdvocate chamberlain College of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
497
Lid sinds
2 jaar
Aantal volgers
77
Documenten
12046
Laatst verkocht
5 dagen geleden
NURSE ADVOCATE

I have solutions for following subjects: Nursing, Business, Accounting, statistics, chemistry, Biology and all other subjects. Nursing Being my main profession line, I have essential guides that are Almost A+ graded, I am a very friendly person: If you would not agreed with my solutions I am ready for refund

4.6

239 beoordelingen

5
193
4
14
3
15
2
6
1
11

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen