AM
SWM COMBINED ADMINISTRATOR EXAM - VA DEQ QUESTIONS
AND ANSWERS WITH COMPLETE SOLUTIONS VERIFIED
Leave the first rating
Save
Terms in this set (105)
Certificates of 3 years
competency are valid for
____.
The Stormwater Permit, regulate and control stormwater runoff.
Management Act
requires the State
Water Control Board
to____.
Who should hold a Any personnel of a VSMP authority who reviews plans
certificate of or performs inspections.
competency according to
62.1-44.15:30?
The Construction Stormwater from construction activities that are >= 1
General Permit (CGP) acre
authorizes what types
of discharges?
In accordance with Part 2 Additional Cycles
2C, how many
additional permit
cycles can a project
remain subject to?
An approved:
-ESC Plan
What does a complete -SWM Plan
SWPPP consist of? -P2 Plan
1/
15
, 4/26/25, 9:36
AM
-Additional control measures for TMDL impaired
waters
Issuance of a Land The approval of the SWM and ESC Plans.
Disturbance Permit is
dependent on:
What doe the water Total Phosphorus
quality criteria target
What is the Load Limit? 0.41 /lbs/acre/year
Stormwater BMPs use 3 Infiltration, settling, vegetative uptake or filtering
primary mechanisms to
control pollution:
Part 2B and 2C water Channel protection and flood protection
quantity criteria
addresses:
Define the Virginia A compliance approach used in VA to address
Runoff Reduction pollutant loads by incorporating ESD, runoff
Method. treatment, and volume control options.
What happens when Ecological stress becomes apparent.
imperviousness reaches
10-20%?
2/
15