LEED v4 AP BD+C Exam 2025 Questions and Answers 100% Pass IN Credit: Innovation Requirements - To achieve all 5 innovation points, a project team must achieve at least one pilot credit, one innovation credit, and no more than two exemplary performance credits. IN Credit: LEED Accredited Professional Requirements - At least one principal participant of the project team must be a LEED Accredited Professional (AP) with a specialty appropriate for the project. RP Credit: Regional Priority Requirements - Earn up to 4 of the 6 Regional Priority credits. A database is listed on USGBC's website. SS Prerequisite: Environmental Site Assessment Requirements - Applies to Schools and Healthcare only - Conduct a Phase 1 Environmental Site Assessment as described in ASTM E1527-05 to determine if environmental contamination exists. If contamination is suspected, conduct a Phase II Environmental Site Assessment. If a site is contaminated, remediate the site to meet local, state, or national environmental protection agency region residential standards. SS Credit: Site Assessment - Requirements - Complete and document a site survey or assessment which includes the following information: topography, hydrology, climate, vegetation, soils, human use, human health effects. The survey or assessment should demonstrate the relationship between the site features and topics listed above 2COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED and how these features influenced the project design; give the reasons for not addressing any of those topics. SS Credit: Open Space Requirements - Provide outdoor space greater than or equal to 30% of the total site area (including the building footprint). A minimum of 25% of the outdoor space must be vegetated or have overhead vegetated canopy. For projects that achieve a density of 1.5 floor-area-ratio (FAR), and are physically accessible, extensive or intensive vegetated roofs can be used towards the minimum 25% vegetation requirements. Wetlands or naturally designed ponds may count as open space if the side slope gradient average is 1:4 or less and are vegetated. SS Credit: Rainwater Management - Option 1 Requirement - Percentile of Rainfall Events: Path 1. 95th Percentile - manage on site the runoff from the developed site for the 95th percentile of regional or local rainfall events using low-impact development. Path 2. 98th Percentile - achieve path 1 but for 98th percentile. 3. Path 3. Zero lot line projects only - 85th percentile. Applies to zero lot line properties with a FAR of 1.5. Manage on site the runoff from the developed site for the 85th percentile of regional or local rainfall events, using LID and green infrastructure. SS Credit: Rainwater Management - Option 2 Requirement - Natural Land Cover Conditions - Manage on site the annual increase in runoff volume for the natural land cover condition to the post developed condition. SS Credit: Heat Island Reduction - Option 1 Requirement - Nonroof and Roof (area of nonroof measure / 0.5) + (area of high reflectance roof / 0.75) is greater than or equal to the total site paving area and the total roof area. Nonroof measures - use the existing plant materials or install plants that provide shade over paving areas on the site within 10 years or planting, provide shade with structures covered by energy generation systems, provide shade with architectural devices or structures that have a three-year 3COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED aged solar reflectance (SR) value of at least 0.28, vegetated structures, paving materials with a three-year aged SR value of at least 0.28, use an open-grid pavement system. SS Credit: Heat Island Reduction - Option 2 Requirement - Parking under cover - place a minimum of 75% of parking spaces under cover. Any roof used to shade or cover parking must (1) have a 3-year aged SRI of at least 32, (2) be a vegetated roof, or (3) be covered by energy generated systems. SS Credit: Light Pollution Reduction Requirements - Meet uplight and light trespass requirements, using either the backlight-uplight-glare (BUG) method (option 1) or the calculation method (option 2). Meet these requirements for all exterior luminaries located inside the project boundary and meet the internally illuminated signage requirement. SS Credit: Site Master Plan Requirements (applies to Schools only) - The project must achieve at least four of the following using the associated calculation methods. The achieved credits must then be recalculated using the data from the master plan: LT Credit High Priority Site; SS Credit Site Development - Protect or Restore; SS Credit Open Space; SS Credit Rainwater Management; SS Credit Heat Island Reduction; SS Credit Light Pollution Reduction. SS Credit: Tenant Design and Construction Guidelines Requirements (applies to Core & Shell only) - Publish for tenants an illustrated document with the following content as applicable: a description of the sustainable design and construction features incorporated in the project, recommendations (including examples) for sustainable strategies, produces, materials, and services; and information that enables a tenant to coordinate space design and construction with the building systems when pursing the following LEED v4 for Interior Design and Construction with prerequisites and credits. Provide guidelines to tenants before they sign a lease. 4COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED SS Credit: Places for Respite Requirements (applies to Healthcare only) - Places of respite which are accessible to patients and visitors, equal to 5% of the net usable program of the building. Provide additional dedicated places for respite for staff, equal to 2% of the net usable program. Places of respite - must be outdoors, in an interior atria, greenhouses, solaria, or conditioned spaces; such interior spaces may be used to meet up to 30% of the required area if 90% of each qualifying space's gross floor area achieves a direct line of sight to unobstructed views of nature. SS Credit: Direct Exterior Access Requirements (applies to Healthcare only) - Provide direct access to an exterior courtyard, terrace, garden or balcony. Space must be at least 5 sf / patient for 75% of all inpatients and 75% of qualifying outpatients whose clinical length of stay exceed 4 hours (patients who are unable to move may be excluded). Places outside the building must meet SS Credit Places of Respite. Spaces must be nonsmoking, meeting the requirements for air containment concentrations in EQ Credit Enhanced Indoor Air Quality Strategies, Option 2 and be located no more than 100 ft from the building exhaust locations / loading docks / roadways with idling vehicles. SS Credit: Joint Use of Facilities - Requirements Option 1 (applies only to schools) - Make building space open to the general pub

Meer zien Lees minder
Instelling
LEED
Vak
LEED

Voorbeeld van de inhoud

LEED v4 AP BD+C Exam 2025
Questions and Answers 100% Pass


IN Credit: Innovation Requirements - ✔✔To achieve all 5 innovation points, a project
team must achieve at least one pilot credit, one innovation credit, and no more than two
exemplary performance credits.

IN Credit: LEED Accredited Professional Requirements - ✔✔At least one principal
participant of the project team must be a LEED Accredited Professional (AP) with a
specialty appropriate for the project.

RP Credit: Regional Priority Requirements - ✔✔Earn up to 4 of the 6 Regional Priority
credits. A database is listed on USGBC's website.

SS Prerequisite: Environmental Site Assessment Requirements - Applies to Schools and
Healthcare only - ✔✔Conduct a Phase 1 Environmental Site Assessment as described in
ASTM E1527-05 to determine if environmental contamination exists. If contamination is
suspected, conduct a Phase II Environmental Site Assessment. If a site is contaminated,
remediate the site to meet local, state, or national environmental protection agency
region residential standards.

SS Credit: Site Assessment - Requirements - ✔✔Complete and document a site survey
or assessment which includes the following information: topography, hydrology,
climate, vegetation, soils, human use, human health effects. The survey or assessment
should demonstrate the relationship between the site features and topics listed above


COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 1

,and how these features influenced the project design; give the reasons for not
addressing any of those topics.

SS Credit: Open Space Requirements - ✔✔Provide outdoor space greater than or equal
to 30% of the total site area (including the building footprint). A minimum of 25% of the
outdoor space must be vegetated or have overhead vegetated canopy. For projects that
achieve a density of 1.5 floor-area-ratio (FAR), and are physically accessible, extensive
or intensive vegetated roofs can be used towards the minimum 25% vegetation
requirements. Wetlands or naturally designed ponds may count as open space if the
side slope gradient average is 1:4 or less and are vegetated.

SS Credit: Rainwater Management - Option 1 Requirement - ✔✔Percentile of Rainfall
Events: Path 1. 95th Percentile - manage on site the runoff from the developed site for
the 95th percentile of regional or local rainfall events using low-impact development.
Path 2. 98th Percentile - achieve path 1 but for 98th percentile. 3. Path 3. Zero lot line
projects only - 85th percentile. Applies to zero lot line properties with a FAR of 1.5.
Manage on site the runoff from the developed site for the 85th percentile of regional or
local rainfall events, using LID and green infrastructure.

SS Credit: Rainwater Management - Option 2 Requirement - ✔✔Natural Land Cover
Conditions - Manage on site the annual increase in runoff volume for the natural land
cover condition to the post developed condition.

SS Credit: Heat Island Reduction - Option 1 Requirement - ✔✔Nonroof and Roof (area
of nonroof measure / 0.5) + (area of high reflectance roof / 0.75) is greater than or equal
to the total site paving area and the total roof area. Nonroof measures - use the existing
plant materials or install plants that provide shade over paving areas on the site within
10 years or planting, provide shade with structures covered by energy generation
systems, provide shade with architectural devices or structures that have a three-year




COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 2

,aged solar reflectance (SR) value of at least 0.28, vegetated structures, paving materials
with a three-year aged SR value of at least 0.28, use an open-grid pavement system.

SS Credit: Heat Island Reduction - Option 2 Requirement - ✔✔Parking under cover -
place a minimum of 75% of parking spaces under cover. Any roof used to shade or
cover parking must (1) have a 3-year aged SRI of at least 32, (2) be a vegetated roof, or
(3) be covered by energy generated systems.

SS Credit: Light Pollution Reduction Requirements - ✔✔Meet uplight and light trespass
requirements, using either the backlight-uplight-glare (BUG) method (option 1) or the
calculation method (option 2). Meet these requirements for all exterior luminaries
located inside the project boundary and meet the internally illuminated signage
requirement.

SS Credit: Site Master Plan Requirements (applies to Schools only) - ✔✔The project
must achieve at least four of the following using the associated calculation methods.
The achieved credits must then be recalculated using the data from the master plan: LT
Credit High Priority Site; SS Credit Site Development - Protect or Restore; SS Credit
Open Space; SS Credit Rainwater Management; SS Credit Heat Island Reduction; SS
Credit Light Pollution Reduction.

SS Credit: Tenant Design and Construction Guidelines Requirements (applies to Core &
Shell only) - ✔✔Publish for tenants an illustrated document with the following content
as applicable: a description of the sustainable design and construction features
incorporated in the project, recommendations (including examples) for sustainable
strategies, produces, materials, and services; and information that enables a tenant to
coordinate space design and construction with the building systems when pursing the
following LEED v4 for Interior Design and Construction with prerequisites and credits.
Provide guidelines to tenants before they sign a lease.




COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 3

, SS Credit: Places for Respite Requirements (applies to Healthcare only) - ✔✔Places of
respite which are accessible to patients and visitors, equal to 5% of the net usable
program of the building. Provide additional dedicated places for respite for staff, equal
to 2% of the net usable program. Places of respite - must be outdoors, in an interior
atria, greenhouses, solaria, or conditioned spaces; such interior spaces may be used to
meet up to 30% of the required area if 90% of each qualifying space's gross floor area
achieves a direct line of sight to unobstructed views of nature.

SS Credit: Direct Exterior Access Requirements (applies to Healthcare only) -
✔✔Provide direct access to an exterior courtyard, terrace, garden or balcony. Space
must be at least 5 sf / patient for 75% of all inpatients and 75% of qualifying outpatients
whose clinical length of stay exceed 4 hours (patients who are unable to move may be
excluded). Places outside the building must meet SS Credit Places of Respite. Spaces
must be nonsmoking, meeting the requirements for air containment concentrations in
EQ Credit Enhanced Indoor Air Quality Strategies, Option 2 and be located no more
than 100 ft from the building exhaust locations / loading docks / roadways with idling
vehicles.

SS Credit: Joint Use of Facilities - Requirements Option 1 (applies only to schools) -
✔✔Make building space open to the general public. In collaboration with the school
authorities, ensure at least three of the following types of spaces in the school are
accessible for use by the general public: auditoriums; gymnasiums; cafeteria; one or
more classrooms; playing fields and stadiums; joint parking. Provide access to toilets in
joint-use areas after normal school hours.

SS Credit: Joint Use of Facilities - Requirements Option 2 (applies only to schools) -
✔✔Option 2: Contract with Specific Organizations to Share Building Space. In
collaboration with school authorities, contract with community or other organizations
to provide at least two of the following dedicated-use spaces: commercial office; health




COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 4

Geschreven voor

Instelling
LEED
Vak
LEED

Documentinformatie

Geüpload op
26 april 2025
Aantal pagina's
36
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
GraceAmelia West Virginia University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
99
Lid sinds
2 jaar
Aantal volgers
32
Documenten
8971
Laatst verkocht
1 week geleden
GraceAmelia\'s Emporium

Get a well Researched and Accurate Study Materials to Boost Your Grades and Excel Academically Offered by Seller Grace.

2.8

8 beoordelingen

5
2
4
1
3
1
2
1
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen