Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

LEED AP Exam 2025 Questions and Answers 100% Pass

Beoordeling
-
Verkocht
-
Pagina's
53
Cijfer
A+
Geüpload op
26-04-2025
Geschreven in
2024/2025

2COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 7. develop LEED scorecard 8. Assign roles and responsibilities 9. develop consistent documentation (base mapping, cross-cutting calculations) 10. perform quality assurance review and submit for certification kinds of sites - 1. previously developmed 2. Infill site Adjacent site How do you know if something is considered previously developed? - atleast 75% previously developed land what is the previously developed exception for small- sites? - May Consider lots of less than one acre if a building was constructed somewhere on the lot because it prevents teams from having to individually assess small home lots to determine the amount of land use the building footprint versus yard space. What is the definition of an infill site? - At least 75% of its boundary borders parcels that individually are at lest 50% previously developed, and that aggregate are at least 75% previously developed how do you calculate infill site? - You divide the area that is previously developed by the total area. Then you take the previously developed area of qualifying parcels by the total area of qualifying parcels. Then you take the perimiter length that is adjacente to the qualifying parcels divided by the total perimiter length minus the length of waterfront perimeter to get the % of perimiter adjacent to qualifying parcels. what are the considerations for an adjacent site? - - If the project site is next to a street right-of-way, the team must consider the previous development status of property on the other side. 3COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED What is the development timeline? - 1. Getting the property 2. preproject conditions 3. existing conditions 4. build-out what are three maps used in mapping? - 1. project site 2. vicinity 3. special maps how do you measure walking and bicycling distances? - distance a pedestrain or bicyclist would travel from an origin point to the closest destination of a given , such as closest bus stop. dwelling or business accessed through common building entries are counted according to the number of dwelling units or busineess establishments reach through such entrances two ways to count occupants - daily averages peak totals what are the resources you can use to estimate occupancy if it's not possible to accurately predict it? - A) Default occupant densit

Meer zien Lees minder
Instelling
LEED
Vak
LEED

Voorbeeld van de inhoud

LEED AP Exam 2025 Questions and
Answers 100% Pass


what are the two compliance paths for indoor water use reduction credits - ✔✔

The three goals of the integrated approach - ✔✔1. developers mission

2. project environmental setting

3. project community context

Who are the members of the project team? - ✔✔1. Applicant acting as team leader

2. multidisciplinary group of desing professionals

3. Local supporting partners

10 steps of the LEED work plan - ✔✔1. Identify project site and prepare preliminary
development program

2. Select rating system

3. Assemble project team and identify relevant organizations

4. check minimum program requirements and prerequisites

5. finalize project boundary and development program

6. reconfirm minimum program requirements and prerequisites compliance




COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 1

,7. develop LEED scorecard

8. Assign roles and responsibilities

9. develop consistent documentation (base mapping, cross-cutting calculations)

10. perform quality assurance review and submit for certification

kinds of sites - ✔✔1. previously developmed

2. Infill site

Adjacent site

How do you know if something is considered previously developed? - ✔✔atleast 75%
previously developed land

what is the previously developed exception for small- sites? - ✔✔May Consider lots of
less than one acre if a building was constructed somewhere on the lot because it
prevents teams from having to individually assess small home lots to determine the
amount of land use the building footprint versus yard space.

What is the definition of an infill site? - ✔✔At least 75% of its boundary borders parcels
that individually are at lest 50% previously developed, and that aggregate are at least
75% previously developed

how do you calculate infill site? - ✔✔You divide the area that is previously developed
by the total area. Then you take the previously developed area of qualifying parcels by
the total area of qualifying parcels. Then you take the perimiter length that is adjacente
to the qualifying parcels divided by the total perimiter length minus the length of
waterfront perimeter to get the % of perimiter adjacent to qualifying parcels.

what are the considerations for an adjacent site? - ✔✔- If the project site is next to a
street right-of-way, the team must consider the previous development status of
property on the other side.


COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 2

,What is the development timeline? - ✔✔1. Getting the property

2. preproject conditions

3. existing conditions

4. build-out

what are three maps used in mapping? - ✔✔1. project site

2. vicinity

3. special maps

how do you measure walking and bicycling distances? - ✔✔distance a pedestrain or
bicyclist would travel from an origin point to the closest destination of a given , such as
closest bus stop.




dwelling or business accessed through common building entries are counted according
to the number of dwelling units or busineess establishments reach through such
entrances

two ways to count occupants - ✔✔daily averages

peak totals

what are the resources you can use to estimate occupancy if it's not possible to
accurately predict it? - ✔✔A) Default occupant density from ASHRAE 62.1-2010, Table
6-1

B) Default occupant density from CEN Standard EN 15251, Table B.2

C) Appendix 2 Default Occupancy Counts

D) Results from applicable studies.



COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 3

, What LEED ND credits reference occupany? - ✔✔1. SLL credit bicycle facilities

2. NDP Credit transportation demand management

3. NDP Credit local food production

GIB prerequisite and credit for indoor water use reduction

4. GIB Credit solid waste management

What are the three minimum requirements - ✔✔1. must be in a permanent location on
existing land

2. must use reasonable LEED boundaries

3. Must comply with project size requirements

how to comply with reasonable LEED boundaries for projects with phased sites? - ✔✔-
Projects that are phased sites with a master plan for multiple buildings must designate a
LEED project boundary for each building or follow USGBC master site guidance

Gross floor area of LEED project should be no less than __% of gross land area - ✔✔2%

What is the minimum size requirement for LEED BD+C and LEED O+M - ✔✔minimum
of 1000 square feet

What is the minimum size requirement for LEED ID+C - ✔✔minimum 250 square feet

What is the minimum size requirement for LEED ND - ✔✔should contain atleast two
habitable buildings and no larger than 15 acres




recommended that atleast 50% be new construction or major renovation




COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 4

Geschreven voor

Instelling
LEED
Vak
LEED

Documentinformatie

Geüpload op
26 april 2025
Aantal pagina's
53
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
GraceAmelia West Virginia University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
99
Lid sinds
2 jaar
Aantal volgers
32
Documenten
8971
Laatst verkocht
1 week geleden
GraceAmelia\'s Emporium

Get a well Researched and Accurate Study Materials to Boost Your Grades and Excel Academically Offered by Seller Grace.

2.8

8 beoordelingen

5
2
4
1
3
1
2
1
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen