Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

LEED AP ID+C Practice Test B 2025 Questions and Answers 100% Pass

Beoordeling
-
Verkocht
-
Pagina's
15
Cijfer
A+
Geüpload op
26-04-2025
Geschreven in
2024/2025

LEED AP ID+C Practice Test B 2025 Questions and Answers 100% Pass After an office space was completed in June, a project team took daylight measurements in all regularly occupied spaces. Which action must occur for the project to earn EQ Credit Daylight? - A second set of measurements must be taken in October to determine compliant floor areas. What is the benefit of preparing a concept model for compliance with IP Credit Integrative Process? - It can form the basis of the preliminary energy model for a tenant-level energy simulation -When doing a tenant-level energy simulation for EA Prerequisite Option 1, teams must engage a qualified energy modeler to create a preliminary model to aid in design decisions. This model will help as long as there is time to alter the design. -The concept model prepared the project team to create the simple box energy analysis that is part of the Integrative Credit and that can be used as the basis of the preliminary model. The preliminary model analyzes building design configurations and heating and cooling load reduction strategies and is used for Option 1. Design or locate the project such that a functional entry and/or bicycle storage is within a 200-yd walking distance or bicycling distance from a bicycle network that connects to at least one of the following: - -at least 10 diverse uses 2COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED -a school or employment center, if the project total floor area is 50% or more residential -a bus rapid transit stop, light or heavy rail station, commuter rail station, or ferry terminal All destinations must be within a 3-mile bicycling distance of the project boundary. A project team is designing a tenant space in the top 3 floors of a 50-story high-rise building. WaterSense labeled fixtures and fittings are being reviewed for WE Prerequisite Indoor Water Use Reduction. What action should occur to ensure building occupants are satisfied with the fixtures and fittings? - Determining the fixtures will not have performance problems. -In high-rises and in different areas where water pressure can vary, it is important for the MEP engineer to address the delivery pressure of the water. By working with the MEP engineer and architect at the project kickoff meeting, specifications can be set so no water pressure issues occur. Which document will serve as the foundation from which all design construction, acceptance, and operational decisions are made? - Owner's Project Requirements: A written document that details the ideas, concepts, and criteria determined by the owner to be important to the success of the project. An office project in a cold climate burns natural gas on-site for heating and uses electricity from the grid in warmer seasons for cooling. Which option can be used to mitigate both Scope 1 and Scope 2 emissions? - Carbon offsets. Only carbon offsets can be used for both emission types - non-electricity and electricity. -Scope 1 emissions are direct greenhouse gas emissions from sources owned or controlled by the entity, such as emissions from fossil fuels burned on site. Scope 2 emissions are indirect greenhouse gas emissions associated with the generation of purchased electricity. 3COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED During the construction phase a contractor has painted a wall with high VOC paint. What is the process to use to correct the error or submit information to qualify for EQ Credit Low-Emitting Materials? - Include the volume of high VOC paint in both the baseline and design case VOC calculations In which LEED credit is sampling allowed? - EA Prerequisite Fundamental Commissioning and Verification -For the prerequisite, the commissioning authority may use sampling strategies for functional testing. For residential, hospital inpatients, hotel guests, prisoners, or other type of residential, what is the number of default uses per day of a water closet? - 5 uses per day An office has 6 individual workstations, 2 private offices, and a conference room. Each workstation has task lighting. Which other lighting designs are required for EQ Credit Interior Lighting? - Individual lighting in both offices and manual controls in the conference room. -Lighting control is required for the following: 90% of individual occupant spaces 100% shared multi-occupant spaces The controls must have at least 3 lighting levels. Upon which factor are sound isolation requirements dependent? - The type of occupied space and the type of space adjacent to it An office project will have a 5% energy improvement over

Meer zien Lees minder
Instelling
LEED
Vak
LEED

Voorbeeld van de inhoud

LEED AP ID+C Practice Test B 2025
Questions and Answers 100% Pass


After an office space was completed in June, a project team took daylight
measurements in all regularly occupied spaces. Which action must occur for the project
to earn EQ Credit Daylight? - ✔✔A second set of measurements must be taken in
October to determine compliant floor areas.

What is the benefit of preparing a concept model for compliance with IP Credit
Integrative Process? - ✔✔It can form the basis of the preliminary energy model for a
tenant-level energy simulation

-When doing a tenant-level energy simulation for EA Prerequisite Option 1, teams must
engage a qualified energy modeler to create a preliminary model to aid in design
decisions. This model will help as long as there is time to alter the design.

-The concept model prepared the project team to create the simple box energy analysis
that is part of the Integrative Credit and that can be used as the basis of the preliminary
model. The preliminary model analyzes building design configurations and heating and
cooling load reduction strategies and is used for Option 1.

Design or locate the project such that a functional entry and/or bicycle storage is within
a 200-yd walking distance or bicycling distance from a bicycle network that connects to
at least one of the following: - ✔✔-at least 10 diverse uses




COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 1

, -a school or employment center, if the project total floor area is 50% or more residential

-a bus rapid transit stop, light or heavy rail station, commuter rail station, or ferry
terminal

All destinations must be within a 3-mile bicycling distance of the project boundary.

A project team is designing a tenant space in the top 3 floors of a 50-story high-rise
building. WaterSense labeled fixtures and fittings are being reviewed for WE
Prerequisite Indoor Water Use Reduction. What action should occur to ensure building
occupants are satisfied with the fixtures and fittings? - ✔✔Determining the fixtures will
not have performance problems.

-In high-rises and in different areas where water pressure can vary, it is important for
the MEP engineer to address the delivery pressure of the water. By working with the
MEP engineer and architect at the project kickoff meeting, specifications can be set so no
water pressure issues occur.

Which document will serve as the foundation from which all design construction,
acceptance, and operational decisions are made? - ✔✔Owner's Project Requirements: A
written document that details the ideas, concepts, and criteria determined by the owner
to be important to the success of the project.

An office project in a cold climate burns natural gas on-site for heating and uses
electricity from the grid in warmer seasons for cooling. Which option can be used to
mitigate both Scope 1 and Scope 2 emissions? - ✔✔Carbon offsets. Only carbon offsets
can be used for both emission types - non-electricity and electricity.

-Scope 1 emissions are direct greenhouse gas emissions from sources owned or
controlled by the entity, such as emissions from fossil fuels burned on site. Scope 2
emissions are indirect greenhouse gas emissions associated with the generation of
purchased electricity.



COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 2

Geschreven voor

Instelling
LEED
Vak
LEED

Documentinformatie

Geüpload op
26 april 2025
Aantal pagina's
15
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$12.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
GraceAmelia West Virginia University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
99
Lid sinds
2 jaar
Aantal volgers
32
Documenten
8971
Laatst verkocht
1 week geleden
GraceAmelia\'s Emporium

Get a well Researched and Accurate Study Materials to Boost Your Grades and Excel Academically Offered by Seller Grace.

2.8

8 beoordelingen

5
2
4
1
3
1
2
1
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen