Questions and Answers 100% Pass
Which of the following factors influence the recycling efforts within buildings?
A) Lack of education
B) Non-availability of recycling programs in town
C) ignorance about recycling
D) lack of convenient, physical spaces for recycling - ✔✔D) lack of convenient, physical
spaces for recycling
A project team for a school project will reuse the shell of an existing building and
recycle the rest of the construction and demolition debris. Which of the following MR
credits will this have a positive affect? (choose 2)
A) MR Credit Building Life-Cycle impact reduction
B) MR Credit Furniture and Medical Furnishings
C) MR Prerequisite Storage and Collection of Recyclables
COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 1
,D) MR Credit Construction and Demolition Waste Management - ✔✔A) MR Credit
Building Life Cycle Impact Reduction
D) MR Credit Construction and Demolition Waste Management
A project has limited storage area for waste containers. What would you recommend
for this project to earn MR credit construction waste management? - ✔✔commingle
collection recycling
a facility is considering mercury-free alternatives to low wattage fluorescent lamps such
as LEDs in order to meet Prerequisite PBT source reduction - Mercury. What is true for
the project to use this strategy? - ✔✔mercury free alternatives should be at least as
energy efficient as comparable mercury containing lamps
a project is pursuing MR credit building life-cycle impact reduction using Option 3:
Building and Material Resue. What will determine the number of points the projects can
earn using this option? - ✔✔percentage of completed project surface area reused
A project is pursuing MR Credit Building Product Disclosure and Optimization -
Environmental Product Declarations using Option 2. What should the project team do
in order to qualify for exemplary performance? - ✔✔Purchase 75% (by cost) of
permanently installed building products that meet the required attributes
what must be true for the scope of EPDs to adhere with MR credit Building Product
Disclosure and Optimization - EPD requirements? - ✔✔the scope of any EPD must be at
least cradle-to-gate
Which of the following is true for a healthcare project, pursuing MR Credit Medical
Furniture and Furnishings and MR Credit Building Product Disclosure and
Optimization? - ✔✔freestanding furniture items included in MR Credit Medical
Furniture and Furnishings cannot be counted in any Building Product Disclosure and
Optimization credits
COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 2
, A project pursuing MR Credit Building Product Disclosure and Optimization - Sourcing
of Raw Materials is using Option 1: Raw Material Source and Extraction Reporting to
comply with credit requirements. The project identified 3 products that are re-used and
also have recycled content in it. Which of the following must be true for the project to
utilize these products towards credit achievement? - ✔✔the products can only qualify
for either "recycle content" or "reuse" for credit achievement.
A project pursuing MR Credit Building Product Disclosure and Optimization - Sourcing
of Raw Materials is using Option 2: Leadership Extraction Practices to comply with
credit requirements. Which of the following products have the greatest impact towards
credit achievement? - ✔✔Products meeting wood products criteria and sourced w/in
100 miles of the project site
A project is pursuing MR Credit Building Product Disclosure and Optimization -
Material Ingredients using Option 1: Material Ingredient Reporting to comply with
credit requirements. Which of the following materials would comply? - ✔✔1. The end
use product has been certified as Cradle to Cradle v2 Basic level
2. The end use product has a published, complete Health Product Declaration
3. The end use product has been certified at the Cradle to Cradle v3 Bronze level
A healthcare project is pursuing PBT Source Reduction - Lead, Cadmium, and Copper.
Which of the following should the project teams do specify Lead? - ✔✔specify and use
lead-free roofing and flashing
The HVAC contractor for a small office project is planning to perform flush-out
construction ends and the building has been completely cleaned in order for the project
to earn EQ credit Indoor Air Quality Assessment. What must occur if occupancy is
desired before the flush-out is complete? - ✔✔the space can only be occupied after
delivery of a minimum of 3,500 cubic feet of outdoor air per square foot
COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 3