Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

LEED AP ID+C Practice Test 1 2025 Questions and Answers 100% Pass

Beoordeling
-
Verkocht
-
Pagina's
12
Cijfer
A+
Geüpload op
26-04-2025
Geschreven in
2024/2025

LEED AP ID+C Practice Test 1 2025 Questions and Answers 100% Pass A project team is working on the preliminary calculations for reusing interior nonstructural elements for MR Credit Interiors Life-Cycle Impact Reduction (MRC2). How should the reused interior be quantified? - the surface area of the materials A tenant is moving into a new space and is planning for the future growth of the company. What project feature allows the space to be changed more easily to support growth? - demountable partitions Which project team members' presence on a project would help meet the requirements of multiple credits for a prospective LEED ID+C Retail project? - LEED AP ID+C and a qualified CxA Which project strategy would earn an exemplary performance point under IN credit Innovation Option 3 Additional Strategies? - achieving double the credit requirements or the next incremental percentage threshold What best defines the project boundary? - Platted property line of the project defining land and water within it Under what circumstances are projects exempt from WE Prerequisite Indoor Water Use Reduction? - When fixtures or fittings are not within the tenant spaces 2COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED Which of the following may be considered a unique and nonstandard fixture? - Toilets with flush valve control and separate bowls, prison fixtures, children's toilets, squat (floor-mounted) toilets The LEED reviewer response from a preliminary review indicates a project will be 1 point short of LEED Platinum. What should the project team do if they still want to pursue LEED Platinum? - Submit new or revised documentation for credits that were denied or require more information, or attempt additional credits before submitting the final review Which water-using equipment can be excluded from the 20% reduction threshold of WE Prerequisite Indoor Water Use Reduction? - Janitor's sink, fixtures regulated by health codes, coffee maker What is the threshold for an sDA simulation? - 300 lux for 50% of the hours between 8AM and 6PM local time for a full calendar year Which 2 systems need to be metered for individual energy use for EA Credit Advanced Energy Metering? - -Two space-cooling systems that each use 6% of the total annual consumption of the tenant space -Interior lighting that represents 13% of the total annual consumption of the tenant space (any individual energy end uses that represent 10% or more of the total annual consumption of the tenant space) A CxA has finished preparing their Cx report for the building owner, and the project team is compiling the current facility requirements (CFR) and operations and maintenance (O&M) plan. Which information should the CFR and O&M plan include to operate a building efficiently by the facility manager? - Set points for all HVAC equipment, sequence of operations for the building, lighting levels 3COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED As an alternative refrigerant to HCFC a project team is considering HFC-410A. What is the trade-off when using HFC-410A in the HVAC&R system? - May require more energy to achieve the same level of cooling as HCFC What could be classified as a bicycle network? - Paths, trails, designated bike lanes, and slow speed roadways. For what purpose would a project team use the Canadian Standards Association CSA Z782-06 Guideline for Design for Disassembly and Adaptability in Buildings? - Ensure that at least 50%, by cost, of nonstructural materials have integral labels containing information on material origin, properties, date of manufacture A LEED ID+C project that wants to maximize the number of points in the LT category should consider locating the project in which location? - LEED ND Certified Plan What are measures undertaken by the maker of a product to accept its own and sometimes other manufacturers' products as post-consumer waste at the end of the products' useful life. Producers recover and recycle the materials for use in new products of the same type. This is a waste management strategy that promotes integrating the life-cycle environmental costs associated with goods into the market price of the products. It is based on the idea that because producers have the greatest control over product design, they also have the ability and responsibility to reduce their products' toxicity and waste. - extended producer responsibility The uses of these potable water alternatives are acceptable for WE Credit Indoor Water Use Reduction: - municipally supplied reclaimed water, greywater, rainwater, stormwater, condensate, foundation dewatering water, used process water, and reverse osmosis reject water 4COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED A project design for a hotel includes rollout mats to improve indoor air quality. Which kind of entryway does NOT require rollout mats for EQ Credit Enhanced IAQ? - Emergency exits When using the indoor water use calculator, which info will the project team need to enter to accommodate the 30 visitors? - Nothi

Meer zien Lees minder
Instelling
LEED
Vak
LEED

Voorbeeld van de inhoud

LEED AP ID+C Practice Test 1 2025
Questions and Answers 100% Pass


A project team is working on the preliminary calculations for reusing interior
nonstructural elements for MR Credit Interiors Life-Cycle Impact Reduction (MRC2).
How should the reused interior be quantified? - ✔✔the surface area of the materials

A tenant is moving into a new space and is planning for the future growth of the
company. What project feature allows the space to be changed more easily to support
growth? - ✔✔demountable partitions

Which project team members' presence on a project would help meet the requirements
of multiple credits for a prospective LEED ID+C Retail project? - ✔✔LEED AP ID+C
and a qualified CxA

Which project strategy would earn an exemplary performance point under IN credit
Innovation Option 3 Additional Strategies? - ✔✔achieving double the credit
requirements or the next incremental percentage threshold

What best defines the project boundary? - ✔✔Platted property line of the project
defining land and water within it

Under what circumstances are projects exempt from WE Prerequisite Indoor Water Use
Reduction? - ✔✔When fixtures or fittings are not within the tenant spaces




COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 1

, Which of the following may be considered a unique and nonstandard fixture? -
✔✔Toilets with flush valve control and separate bowls, prison fixtures, children's
toilets, squat (floor-mounted) toilets

The LEED reviewer response from a preliminary review indicates a project will be 1
point short of LEED Platinum. What should the project team do if they still want to
pursue LEED Platinum? - ✔✔Submit new or revised documentation for credits that
were denied or require more information, or attempt additional credits before
submitting the final review

Which water-using equipment can be excluded from the 20% reduction threshold of
WE Prerequisite Indoor Water Use Reduction? - ✔✔Janitor's sink, fixtures regulated by
health codes, coffee maker

What is the threshold for an sDA simulation? - ✔✔300 lux for 50% of the hours between
8AM and 6PM local time for a full calendar year

Which 2 systems need to be metered for individual energy use for EA Credit Advanced
Energy Metering? - ✔✔-Two space-cooling systems that each use 6% of the total annual
consumption of the tenant space

-Interior lighting that represents 13% of the total annual consumption of the tenant
space

(any individual energy end uses that represent 10% or more of the total annual
consumption of the tenant space)

A CxA has finished preparing their Cx report for the building owner, and the project
team is compiling the current facility requirements (CFR) and operations and
maintenance (O&M) plan. Which information should the CFR and O&M plan include to
operate a building efficiently by the facility manager? - ✔✔Set points for all HVAC
equipment, sequence of operations for the building, lighting levels



COPYRIGHT © 2025 BY GRACE AMELIA, ALL RIGHTS RESERVED 2

Geschreven voor

Instelling
LEED
Vak
LEED

Documentinformatie

Geüpload op
26 april 2025
Aantal pagina's
12
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$12.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
GraceAmelia West Virginia University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
99
Lid sinds
2 jaar
Aantal volgers
32
Documenten
8971
Laatst verkocht
1 week geleden
GraceAmelia\'s Emporium

Get a well Researched and Accurate Study Materials to Boost Your Grades and Excel Academically Offered by Seller Grace.

2.8

8 beoordelingen

5
2
4
1
3
1
2
1
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen