Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Minnesota Special Engineer Boiler License Practice Exam Questions

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
28-04-2025
Written in
2024/2025

Minnesota Special Engineer Boiler License Practice Exam Questions Minnesota Special Engineer Boiler License Practice Exam Questions Minnesota Special Engineer Boiler License Practice Exam Questions

Institution
Minnesota Special Engineer Boiler License Practice
Course
Minnesota Special Engineer Boiler License Practice

Content preview

Minnesota Special Engineer Boiler
License Practice Exam Questions
A Special Engineer is expected to be competent, take charge of, and be responsible for the safe
operation and maintenance of all classes of boilers of not more than ___________ HP and their
appurtenances. ANS: 50



A gauge glass can be attached to a ____________ column, which is attached to a boiler. ANS: water



In accordance with the statutes of the State of Minnesota, one boiler horsepower for conventional
boilers is equal to ____________ ANS: 10 sq ft of boiler heating surface



In accordance with the statutes of the State of Minnesota, one boiler horsepower for steam-coil-type
generators is equal to ____________ ANS: 5 sq ft of boiler heating surface



When the boiler heating surface cannot be discerned, the boiler horsepower shall be determined by
dividing the Btu input by ____________ ANS: 67,000



In accordance with the statues of the State of Minnesota, each electric boiler horsepower is equal to
____________ kilowatts ANS: 10



A logbook must be maintained in the boiler room by the ____________ ANS: the chief engineer or the
operating engineer designee



The shift engineer of a high pressure boiler plant of over 200 HP must stay within ____________ of
boiler room at all times during the shift? ANS: 500 ft



A high pressure boiler must have two means of feedwater supply if it exceeds ____________ HP. ANS:
50

, When used, a quick-opening blowdown valve must be located ____________ ANS: nearest to the boiler



The minimum passing score for a Minnesota engineer's license examination is ____________% ANS: 70



Licenses granted must be displayed in ____________ ANS: a conspicuous place in the engine or boiler
room



For the purpose of the boiler and pressure vessels statutes, "a year" is considered to be at least
____________ hr. ANS: 2000



Sensible heat is ____________ ANS: able to cause a change in temperature



Heat that brings about of state without causing a change in temperature is ____________ ANS: called
latent heat



In a boiler, heat is transferred from the burning fuel to the water by ____________, ____________, and
____________ ANS: convection, conduction, radiation



Convection is method of heat transfer where the movement of the fluids is due solely to the
____________ ANS: flow of fluids



Large high pressure utility boilers use ____________ ANS: balanced draft



When heat transfer occurs by traveling through metal, it is known as ____________ ANS: conduction



An example of the transfer of heat by radiation is ____________ ANS: the heating effect of the sun on
the earth

Written for

Institution
Minnesota Special Engineer Boiler License Practice
Course
Minnesota Special Engineer Boiler License Practice

Document information

Uploaded on
April 28, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$14.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
lectjoseph Harvard University
Follow You need to be logged in order to follow users or courses
Sold
78
Member since
2 year
Number of followers
23
Documents
5502
Last sold
3 days ago

learning is hard ,but with me it will be easier. Timely ,detailed and organized study guides and notes that will save you a lot of study time. Reviews are highly appreciated. Wishing you the best

3.5

10 reviews

5
4
4
1
3
2
2
2
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions