Voorbeeld van de inhoud

RESIDENTIAL BUILDING INSPECTOR
EXAM QUESTIONS WITH CORRECT
ANSWERS
Which of the following mechanical installations do not require a permit? - ANSWER-
Portable heating , ventilation, cooling, fuel cell , self contain refrigeration system,
portable, evaporation, coolers, minor replacement of part, steam, hot or chilled water
piping

Generally. the stopping of leaks in drains, water, soil, waste or vent pipe do
not require a permit. - ANSWER-True

In emergency situations, equipment repairs and replacements can be done without a
permit but the permit application must be submitted to the building official within _____
of the repair/replacement. - ANSWER-Next business day

In the permit application, the applicant must ___ - ANSWER-Identify the work , land ,
use , occupancy

An application for a permit is considered abandoned _____
after the date of filing
unless such application has been pursued in good faith or a permit has been issued. -
ANSWER-180 days

Work approved by a permit must be commenced within _______of the issue of that
permit. - ANSWER-180 days

The building official is authorized to suspend or revoke a permit issued wherever the
permit is issued in error or on the basis of ______
information. - ANSWER-Incorrect inaccurate incomplete


The building permit, or a copy of the permit, must be kept _____ until the completion of
the project. - ANSWER-On site

Submittal documents that consist of construction documents must be submitted in ____
or more sets with each application for a permit. - ANSWER-2

Construction documents in submittal documents must be prepared by a registered
design professional, where required, by the jurisdiction. - ANSWER-True

, The construction documents submitted with the permit application must be
accompanied by a site plan that shows the ____ - ANSWER-Size and location of new
construction and existing structures

______to an existing structure must not adversely affect the performance of a structure
- ANSWER-Additions, alterations, repairs


The individual in charge of the department of building safety is referred to as
the________ - ANSWER-building official

The building official is hereby authorized _________ and directed to
of this code. - ANSWER-Enforce the provisions, render interpretations, adopt policies in
order to clarify provisions

building official must keep official records, permits and certificates issued for -
ANSWER-The period required for the retention of public records

The building official is relieved from personal liability for any damage accruing to
persons or property as a result of any act or by reason of an act or omission in the
discharge of official duties so long as he/she is acting for the jurisdiction in good faith
and without malice. - ANSWER-True

Unless approved by the building official, used______
must not be reused. - ANSWER-Materials, Equipment, Devices.


Where there are practical difficulties involved in carrying out the provisions of this code,
the building official has the authority to grant modifications so long as such modification
do not
lessen________
requirements. - ANSWER-Health, Safety , fire safety


The building official must not grant modifications to any provisions required in flood
hazard areas under any circumstances. - ANSWER-False
unless a determination has been made that
1. There is good and sufficient cause showing that the unique characteristics of the size,
configuration or topography of the site render the elevation standards of Section R322
inappropriate.
2. Failure to grant the modification would result in exceptional hardship by rendering the
lot undevelopable.
3. The granting of modification will not result in increased food heights, additional
threats to public safety, extraordinary public expense, cause fraud on or victimization of
the public, or conflict with existing laws or ordinances.

Geschreven voor

Instelling
INTERNATIONAL CODES ZONING
Vak
INTERNATIONAL CODES ZONING

Documentinformatie

Geüpload op
11 mei 2025
Aantal pagina's
5
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Onbekend

Onderwerpen

$17.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
STUDYGUIDESET Bradford College
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
46
Lid sinds
3 jaar
Aantal volgers
17
Documenten
3140
Laatst verkocht
5 dagen geleden
Anchor

on this page you will find al Exam materials, Exam ,package deal, Study Guide.

3.2

6 beoordelingen

5
1
4
1
3
3
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen