Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

WMGT 101-22A EXAM 3 QUESTIONS AND ANSWERS 100% PASS

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
12-05-2025
Written in
2024/2025

WMGT 101-22A EXAM 3 QUESTIONS AND ANSWERS 100% PASS AFI 10-245, Antiterrorism - ANS CE shall: have at least 1 engineer at each base must complete Security Eng AT Planning & Design Course, review, document, and track construction projects AT compliance, provide vulnerability assessment protection option program (VAPO) analysis for all critical facilities and off-base leases, and work with the Base Antiterrorism Officer Antiterrorism Requirement Planning - ANS 1. UFC 4-020-01 2. Is only the minimum standard required? 3. Yes: construction standoff distance available? No: UFC 4-020-02 and support manuals 4. If standoff distance is available, apply UFC 4-010-01 and support manuals Design Basis Threat (DBT) - ANS Baseline threat used in the design of protective measures Initial DBT - ANS Based on planning team, local intel and Geographic Combatant Command (COCOM) Theater-Wide threat assessments Modify Initial DBT - ANS Local threat assessments Level of Protection - ANS The degree to which an asset is protected, defines the amount of damage a facility or asset can sustain during an attack ©THESTAR 2025 ALL RIGHTS RESERVED LOP: Very low - ANS Progressive collapse is unlikely, but space in and around damaged area will be unusable and onset of structural collapse occurs. Glazing is likely to be propelled into the building and cause serious injuries. Doors may be propelled into rooms, presenting serious hazards. LOP: Low - ANS Building will not be economically repairable and space in and around damaged area will not be usable, but progressive collapse will not occur. Glazing will fracture and may come out of the frame, but does not present a significant injury hazard. Doors may fail but present minimal hazards. LOP: Medium - ANS Minor damage, space in and around damaged area can be used and will be fully functional after cleanup and repairs. Glazing will fracture but remain in the frame. Doors may stay in frames but will not be reusable. LOP: High - ANS Minimal to no damage with no permanent definitions. Glazing will not break. Doors will be reusable. UFC 4-010-01 - ANS DoD minimum antiterrorism standards for buildings. Intent is to reduce mass casualties, minimize collateral damage to nearby facilities, and facilitate future upgrades and increases FPCON. UFC 4-020-01 - ANS DoD Security Engineering Facility Planning Manual. Acts as a starting point for Garrison Antiterrorism and a quantitative risk-based model. Uses scoring model to evaluate asset value (0-1.0), threat likelihood (0-1.0), and use of minimum AT standards (0.5). Includes cost data and helps establish a DBT and required LOP. AT/FP misconceptions - ANS 1. Bollards, fences, curbs, and barriers are and adequate substitution for standoff 2. Existing roads must be moved away from existing buildings 3. All building require standoff Mandatory design standards - ANS Standard 1: Standoff distance Standard 6: Progressive collapse

Show more Read less
Institution
WMGT 101-22A
Course
WMGT 101-22A

Content preview

©THESTAR 2025 ALL RIGHTS RESERVED




WMGT 101-22A EXAM 3 QUESTIONS
AND ANSWERS 100% PASS


AFI 10-245, Antiterrorism - ANS CE shall: have at least 1 engineer at each base must
complete Security Eng AT Planning & Design Course, review, document, and track construction
projects AT compliance, provide vulnerability assessment protection option program (VAPO)
analysis for all critical facilities and off-base leases, and work with the Base Antiterrorism
Officer


Antiterrorism Requirement Planning - ANS 1. UFC 4-020-01
2. Is only the minimum standard required?
3. Yes: construction standoff distance available?
No: UFC 4-020-02 and support manuals
4. If standoff distance is available, apply UFC 4-010-01 and support manuals


Design Basis Threat (DBT) - ANS Baseline threat used in the design of protective measures


Initial DBT - ANS Based on planning team, local intel and Geographic Combatant Command
(COCOM) Theater-Wide threat assessments


Modify Initial DBT - ANS Local threat assessments


Level of Protection - ANS The degree to which an asset is protected, defines the amount of
damage a facility or asset can sustain during an attack

, ©THESTAR 2025 ALL RIGHTS RESERVED

LOP: Very low - ANS Progressive collapse is unlikely, but space in and around damaged area
will be unusable and onset of structural collapse occurs. Glazing is likely to be propelled into the
building and cause serious injuries. Doors may be propelled into rooms, presenting serious
hazards.


LOP: Low - ANS Building will not be economically repairable and space in and around
damaged area will not be usable, but progressive collapse will not occur. Glazing will fracture
and may come out of the frame, but does not present a significant injury hazard. Doors may fail
but present minimal hazards.


LOP: Medium - ANS Minor damage, space in and around damaged area can be used and will
be fully functional after cleanup and repairs. Glazing will fracture but remain in the frame.
Doors may stay in frames but will not be reusable.


LOP: High - ANS Minimal to no damage with no permanent definitions. Glazing will not
break. Doors will be reusable.


UFC 4-010-01 - ANS DoD minimum antiterrorism standards for buildings. Intent is to reduce
mass casualties, minimize collateral damage to nearby facilities, and facilitate future upgrades
and increases FPCON.


UFC 4-020-01 - ANS DoD Security Engineering Facility Planning Manual. Acts as a starting
point for Garrison Antiterrorism and a quantitative risk-based model. Uses scoring model to
evaluate asset value (0-1.0), threat likelihood (0-1.0), and use of minimum AT standards (<0.5).
Includes cost data and helps establish a DBT and required LOP.


AT/FP misconceptions - ANS 1. Bollards, fences, curbs, and barriers are and adequate
substitution for standoff
2. Existing roads must be moved away from existing buildings
3. All building require standoff


Mandatory design standards - ANS Standard 1: Standoff distance
Standard 6: Progressive collapse

Written for

Institution
WMGT 101-22A
Course
WMGT 101-22A

Document information

Uploaded on
May 12, 2025
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheStar Florida State University
Follow You need to be logged in order to follow users or courses
Sold
680
Member since
2 year
Number of followers
178
Documents
26242
Last sold
6 days ago
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

136 reviews

5
60
4
25
3
27
2
5
1
19

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions