2024/2025 Questions and Answers Graded A+
According to PEI RP 300. A written scope of work for vapor recovery installation
should include?
Construction plans
Positive shut off overfill protection device must stop the flow of fuel when the tank
is no more then ?
95% full
According to EO VR 201 A What could cause a nozzle shut off mechanism or
malfunction?
Depended filter seal damage
According to VR 201 A Breakaway reconnection must be ?
Logged in GDF log
,According to PEI RP 300 the following method of documenting piping location is
NOT to ?
Sketch a diagram on the inside cover of vapor recovery equipment manual
According to PEI RP 300 as built drawing or pictures of the underground pipping
and other components shall be ?
Maintained as long as UST is in service
According to EO VR 101 E maintance records are required to include?
Name and designated UST operator .
The Phil-Tite EVR phase 1 system require that vapor vent pipes at any UST
system be
Used with no more then 3 p/v valves
According to EO VR 2010 after installing a new spout assembly in the Healy 900
nozzle the following test must be conducted ?
Nozzle dispensing shut off test
,According to Healy EO VR 201 A a vapor recovery record are to be maintained
by?
Gasoline dispensing facility operator
(GDF)
how many feet within a public drinking well require an enhanced leak detection
test
1000 feet
What are the components of the Fire Triangle ?
Fuel Ignition source oxygen
If equipped with an over fill alarm, it must be located?
So it can be seen or heard from the delivery location.
UDC was required at time of installation for all systems installed after?
Januarary 1 2000
July 1 2005, service techs shall possess or work under someone who has a current
certification indicating he or she has passed the ?
, California UST service technician exam
ICC cert must be renewed every?
24 months
Service techs must posses or be employed by a person who has the appropriate
contractors license unless?
The individual has a Tank testing licens
Service tech is defined by any individual who?
Test UST monitoring equipment
Trouble shoots UST systems
Installs UST monitoring equipment
If the manufacturer training no longer exist , the local angency may?
Approve comparable alternat training .
UST includes?