WV BUSINESS LAW PRACTICE
EXAM FOR CONTRACTORS|high
yield questions with
right/authentic answers|newest
2025| already graded a
1. What type of contract requires the contractor to be responsible for both the
engineering and construction of a project?
a. Traditional
b. Design build
c. Turn key
d. Concession - CORRECT ANSWERS✔️✔b
️ . Design build
2. By what date is an employer required to provide its employees with a W-2?
a. January 31
b. February 15
c. March 31
d. April 15 - CORRECT ANSWERS✔️✔️a. January 31
3. When developing a project schedule, what does WBS stand for?
a. Work breakdown structure
b. Work building schedule
c. Wall board system
d. Whole build system - CORRECT ANSWERS✔️✔️a. Work breakdown structure
SUCCESS
, STUDYSAGE
4. Overtime wages are paid at what percentage of the normal wage rate? -
CORRECT ANSWERS✔️✔️c. 150%
5. Using the percentage method of withholding, what is the income tax deducted
form an employees wages that earns $1,500 per pay period, is paid bi-weekly, is
single and claims no deductions?
a. $82.95
b. 165.90
c. $194.50
d. $214.50 - CORRECT ANSWERS✔️✔️c. $194.50
6. What is the penalty for submitting an IRS payroll tax deposit in the amount of
$5,000 that is 2 days late?
a. $100
b. $250
c. $500
d. $750 - CORRECT ANSWERS✔️✔️a. $100
The accounting method that recognizes income and expenses only when money is
received or paid is called:
a. the PCM Method
b. the Accrual method
c. the cash method
d. the cost-comparison method - CORRECT ANSWERS✔️✔️c. the Cash method
SUCCESS